Backlinks to SiWDESY201706 in CALICE Web

Results from CALICE web retrieved at 22:35 (GMT)

Commissioning and noise studies for single slabs The commissioning procedure described here will be part of the calicoes/pyrame framework http://llr.in2p3.fr/sites...
Please note: 1) All test beam areas are secured by the access control system DACHS (DESY Access Handling System). Therefore you need a valid DACHS card to work in...
Physics Prototype check on the TestBeamProgramme page Technical Prototype Complete list on https://forge.in2p3.fr/projects/calice/wiki/Si WEcal Beam Tests On this...
Analysis List of tools to analyze the SiW ECAL Beam tests agendas for Analysis meeting Contact: A. Irles, irles #64;lalNOSPAMPLEASE.in2p3.NOTSPAMfr Old pages: https...
DESY testbeam area 24/1 and 24/2 http://particle physics.desy.de/e252106/ AdrianIrles 2017 10 10
Commissioning for TB2017 06 at DESY Slabs commissioned We have commissioned slabs 13 22. Information about the slabs is in https://forge.in2p3.fr/projects/calice...
Scans of various energies: 1, 2, 3, 4, 5, 5.8 GeV. Rates at 5 5.8 GeV were very low: overnight runs Three different tungsten configurations, with the following amount...
Material Logistics Transportations: List of Material COPY OF nov 2015 LIST TO BE UPDATED Resp: M. Frotin List of material Prelim list: https...
MIP calibration using positrons Full scan of the slabs using a grid of 9x9 points (2 cm separation). Positron beam of 3 GeV. Standard acquisition : 30 min An animated...
In parallel to the magnetic field tests and setup, we decided to take a run with the detector tilted ~45 degrees to increase the cross section of the silicon wafer...
Slab 21 (first layer in the full stack) was moved, after the shower program to the TB24/2 area. We tested magnetic fields of 0, 1 and 0.5 T (in this order). we also...
Physics program Modified from Main.Physics program Set up`s: SLABs: to be completed. ASU: Most recent reviews of the devices are in R...
DESY 2018 07 SiW ECAL `10 SLABs` Test 10 Short SLAB`s in flexible frame, at DESY. This page is a copy of SiWDESY201706. It can be edited by the members of the SiWDESY201706Group...
SiWDESY201807Group Member list (comma separated list): Set GROUP VincentBoudry, AdrianIrles, ArturLobanov, FredericMagniette, RomanPoeschl, VladislavBalagura...
Analysis List of tools to analyze the SiW ECAL Beam tests Indico agendas for Analysis meetings: https://indico.in2p3.fr/category/652/ Analysis Topics Check pedestals...
SiWEcalBT201706PicturesCommissioningPhase images SiWEcalBT201706PicturesUnpacking images SiWEcalBT201706PicturesMounting images SiWEcalBT201706PicturesSetup...
CERN Twiki for SiW ECAL Technical Beam Test The dedicated beam test pages can be found on: SiWDESY201807 SiWDESY201706 SiWCERN201511 The full technical...
TWeeder info for CALICE Total Number of topics: 477 3 Topics updated during the last 7 days Days Web Topic Date S7 CALICE SiWDESY...
Statistics for CALICE Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top viewers: Top contributors...
Number of topics: 19

 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    CALICE All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback