Backlinks to InformationSystem in EGEE Web

Results from EGEE web retrieved at 22:58 (GMT)

AGIS CMS Evaluation AGIS documentation Documentation Pages: information to install, configure and use the AGIS clients, and how to configure and use the API...
AMGA Test Plan Service Description AMGA is a metadata catalogue that provides a tool to store, query and replicate metadata on the Grid. AMGA uses a database backend...
ARC sites published in the BDII The following tables summarize how the sites publishing ARC resources are published in the top BDII. WLCG ARC sites WLCG Name...
Batch System Support and Coordination Batch System Support is a community driven effort by those that require CE adaption for a specific batch system. This aim of...
Berkeley Database Information Index V5 Note: This page is no longer maintained. For up to date information on Information Systems, please check the System online documentation...
Investigations on a Relational Schema based Information System This page is intented to describe the investigations which have been done for switching the current...
BDII Testplan The purpose of this document is to give a detailed list of tests that should be performed to the BDII after a patch has been issued and before going...
Berkeley Database Information Index V4 Note: For information on BDIIv5 please see this documentation . Overview The Berkeley Database Information Index (BDIIv...
Summary of status as of 14/1/08 The new developments on the CREAM service have been basically finalized. In particular the two major changes that have been being applied...
Status of CERN BDII production service This twiki summarises the deployment status of CERN production top, site and SAM BDIIs, summarizing the list actions that are...
Certification Report, DPM 1.7.4 SL4, Patches #3940, #3967 Installation and Configuration DPM Head node (32 bit) Clean install h32 new.txt: Install 1.7.4...
Certification Report, DPM/LFC 1.7.4 7 SL4, 32 bit, Patch #4188 Installation and Configuration DPM Head node Clean install INSTALL CLEAN HEAD 32.txt: DPM Head...
Certification Report, DPM/LFC 1.7.4 7 SL4, 64 bit, Patch #4189 Installation and Configuration DPM Head node Clean install INSTALL CLEAN HEAD 64.txt: DPM Head...
Certification Report, DPM/LFC 1.7.4 7 SL5, 64 bit, Patch #4190 Installation and Configuration DPM Head node Clean install INSTALL CLEAN HEAD5.txt: DPM Head...
Certification Report For Patch 3970, DPM 1.7.4, SL5, gLite 3.2 Installation DPM Head Node Clean Install H5 INSTALL CLEAN.txt: DPM Head Node, Clean Install...
Certification report for DPM 1.8.2 (patch #5005, patch #5006, gLite 3.2 release) Installation Head node head prod install.txt: DPM Head node, Production version...
Certification report for DPM 1.8.2 3 (patch #5005, patch #5006, gLite 3.2 release) Installation Head node head prod install.txt: DPM Head node, Production version...
Certification report for DPM 1.8.0 (SL4, gLite 3.1), Patches #4514, #4515, #4516, #4517 Installation and configuration DPM Head Node 32 bit dpm head sl4...
Certification report for DPM/LFC 1.8.0 (SL5, gLite 3.2), Patches #4470, #4471, #4472, #4473 Installation and configuration LFC LFC 1.8.0 1 MySQL clean install...
Certification Report For Patch 3020 Software installed cert glite LFC mysql (SL5, 64bit)...
Certification report for patches 3340, 3341, 3226, 2828 Nodes deployed glite VOMS mysql (32 bit, glite 3.1, patched) glite VOMS oracle (32 bit, glite...
Certification report for LFC 1.8.2 (patch #5003, patch #5004; gLite 3.2 release) Installation During clean installation, the gpt package was installed from the production...
Certification report for LFC 1.8.0 (SL4, gLite 3.1), Patches #4518, #4519, #4520, #4521 Installation and configuration LFC mysql 32 bit lfc mysql sl4 32 clean...
CHEP 2007 Title Paper Poster/Presentation Grid Interoperability: The Interoperations Cookbook paper presentation Operations http://indico.cern.ch...
config info service Note: PATCH:1278 is now certified. You can start implementing the information provider in new services. A new function is needed for all services...
Core CRIC Introduction The Computing Resource Information Catalogue (CRIC) is the new WLCG Information System. The CRIC architecture for WLCG will rely on a core...
CyrilLorphelin 23 Jun 2008 Top BDII there are some developments around failover at thelevel of clients . Finally Top BDII name should be extracted frominformation...
Grid Abbreviation List A A Astronomy and Astrophysics AA Attribute Authority AAA Authorisation, Authentication, Accounting ABA Attribute Based...
gLite Developer`s Guide Applicable to gLite as of version 3.1 December 10, 2009 1.Introduction 1.1 Purpose This guide is for anyone developing or modifying EGEE...
Encrypted Storage and Hydra What is Hydra? Hydra is encrypted file storage solution. It encrypts files and stores them on normal storage elements (storage elements...
File Transfer Service support area The purpose of this page is to keep track of the problems and support requests posted to GGUS. This page is relevant to the gLite...
Summary of strategy for DM testing The following broad strategy for testing within IT GT DMS was agreed: Unit Tests We will use the following unit test frameworks...
Please refer to the updated version at: https://twiki.cern.ch/twiki/bin/view/EGEE/EGEEgLiteWorkPlans Data Management WP Context of the CERN Data Management cluster...
Inventory of Existing Documentation GridPP document list http://www.gridpp.ac.uk/docs/doclinks.html GGUS document list https://gus.fzk.de/pages/docu.php...
DPM Test Plan Product Description and Version DPM 1.8.2 3 https://svnweb.cern.ch/trac/lcgdm/wiki/Dpm/Admin/ReferenceCard Unit tests This product does not use unit...
1 Operational Procedures Common Sections 1.1 Preface The EGEE Operational Procedures Manual (OPS Manual) defines the procedures and responsibilities of the various...
JRA1 Work Plans Introduction The first version of this page corresponds to the content of the JRA1 milestone document MJRA1.3. A snapshot of this page at the time...
DRAFT DRAFT DRAFT This is the EGEE III requirements list that has been initially populated with the remaining requirements from EGEE II. The requirements will be...
FTS service design, implementation and deployment notes Various notes tracking the design, development, deployment and operations of the WLCG transfer service. Operations...
FTS Installation This document describes the installation and upgrade procedures for FTS. This document applies to FTS version 2.2.3 Before you start Hardware requirements...
Generic Information Provider Overview The Generic Information Provider, GIP, is a framework which simplifies the creation and deployment of information providers...
Release notes for gLite 3.1 These notes describe the gLite 3.1 release. Supported platforms The present release is for SL4. It has been certified on SLC4 but should...
Release notes for the gLite 3.1 WN for SL4 as provided to PPS These notes describe the initial release to PPS of the gLite 3.1 WN for SL4 What`s the difference between...
File Transfer Service Functional description The FTS is made of 4 separate components, (FTS web service, FTS channel agents, FTS VO agents and FTS Monitor) that...
gLite Monitoring System Collector Server Functional description gLite MON: gLite Monitoring System Collector Server Description of RGMA based monitoring system collector...
Missing tests for gLite This page contains a list of missing tests for gLite. You are encouraged to add content. The list of available tests is here. A now deprecated...
Please note, this is the description for the specific gLite UI tests, when you certify the gLite UI you need to tests on other subcomponents too. Please check SA3Testing...
GLUE2 publication monitoring This twiki tracks the effort of monitoring the quality of the GLUE 2 information published in the WLCG information system. Ongoing efforts...
glue validator Error Codes Introduction The is a tool to validate GLUE 1 and GLUE 2 information published in the BDII. It also validates GLUE 2 information against...
NCG Overview NCG is a three phase configuration generator for automation of the production of monitoring configurations for Grid sites and their services. The `N`...
Yaim Based Installation of Nagios NCG NCG Overview An overview of NCG is provided at GridMonitoringNcgOverview. This document describes an automated installation...
YAIM, NAGIOS and NCG Tutorial Outline Introduction Introduce deployment scenarios, increasing complexity. One NAGIOS Host remote and native probes...
How to certify a patch within a product team (Taken from Gianni`s Revision 22 Feb 2010) Introduction In general, all gLite middleware patches are managed by CERN...
Please refer to the updated version at: https://twiki.cern.ch/twiki/bin/view/EGEE/EGEEgLiteWorkPlans Information and Monitoring work plan Requirements There are...
Author: onclick `window.open(`http://mailhide.recaptcha.net/d?k 0120U7H6vENpV9 BU60TeuAQ c VHj60wf7Zu Rj9rapRlFWdQmMnGYZA5KbkEUb7KAvaM `, ``, `toolbar 0,scrollbars...
The Information System This page is no longer maintained. Please, refer to the System web pages for up to date documentation . Grid information systems are mission...
Testing the Information System This page provides information on how to run some GStat tests to check that a service is publishing correctly its information into the...
Information System Troubleshooting Guide Which BDII version? This page is about BDII v5 used on EMI. Troubleshooting Steps Before attempting to troubleshoot problems...
Information System Troubleshooting Guide Which BDII version? This page is about BDII v4 used on gLite 3.1 . For BDII v5 used on gLite 3.2 please refer to...
Here we report about the single steps of the IPv6 DEMO. The demo is devided in 2 main parts: 1. Configuring Dual Stack on all nodes doesn`t harm gLite: everything...
Information System Providers This twiki contains information about the existing Information System Providers. Responsibility Matrix Product Involved Packages...
Information System excerpts from 2012 TEG reports Source Overview of the Information services: The Grid information system enables users, applications and services...
Information System User Requirements Introduction The following sections present the current status of the existing Information System use cases and the current issues...
Job Priority Preliminary Test This wiki page describes how to deploy the job priority stuff with preliminary YAIM in which the configurations for job priorities are...
LCG Computing Element (LCG CE) Functional description LCG CE is a native computing resource access service with Globus Gatekeeper and GRAM protocol. LCG has modified...
IsabelCampos 03 Apr 2009 Site configuration for MPI This document is intended to help EGEE site administrators to properly support MPI deployments. The recomendations...
Multi Level Monitoring Overview Introduction The EGEE SA1 Multi Level Monitoring (MLM) system is an operational monitoring system built to meet the needs of EGEE...
Adding an extra LCG CE to your site If you wish to have multiple lcg CEs, the following steps are necessary (tested on glite 3.1). In the following instructions replace...
New WLCG IS Roadmap Please, note that this twiki is now obsolete. Please, refer to twiki for up to date information Roadmap The following roadmap will be presented...
Common section: 3: # OLD Sites Functional Tests (SAM) can still be found at https://lcg sam.cern.ch:8443/sam/sam.py # For the older version of GIIS Monitoring (Gstat...
Operational Procedures Common Sections 1 Preface The EGEE Operational Procedures Manual (OPS Manual) defines the procedures and responsibilities of the various parties...
OSG EGEE Coordination Meeting Minutes Tue 8 Jan 2008 Date: Tue 8 Jan 2008 Agenda: 6 Chair: Burt Holzmann Minutes from previous meetings: EgeeOsgCoordinationMeeti...
glexec/Argus Pilot Service: Home Page Start Date: Tue 24 Nov 2009 End Date (tentative): 12 April 2010 Description: Pilot Service of glexec/Argus @ FZK,...
3.0.2 PPS Update 25 Release date: 03.04.2007 Patches The following patches are included in the release: No Description Priority 915 Voms...
3.1.0 PPS Update 40 Release date: 26.11.2008 Preface This update contain the new voms certificates, debug the proxy renewall of FTA, fix configuration issues on...
3.1.0 PPS Update 46 Release date: 17.04.2009 Preface This release contains a big amount of patches. The most relevant fixes are summarised below: SCAS has...
DRAFT DRAFT DRAFT This is a merger between Flavia`s list of issues that the experiments have supported and Cal`s list of requirements. There are fields in the table...
Performance Comparisons with Relational Databases Background In order to populate a relational database with information from LDAP it is first necessary to translate...
Waiting for a nice form to add items, for the time being actions have to be added manually in this page, but it is very simple. Just edit this page. An example of...
VOMS FQANs, fair shares gridmapfiles, YAIM VOMS FQANs VOMS (Virtual Organisation Membership Service) proxies are straightforward and backward compatible extensions...
TOP ROC issues (to be raised at the TCG) This is the list of issues gathered from the sites through the ROCs to be raised to the TCG on a regular basis. Links to the...
SA3 progress page This page lists what has been contributed by the SA3 partners (except CERN) since the first SA3 all hands meeting in June 2006. Entries concerning...
Service Discovery Test Plan Service Description Service Discovery is a client side library to provide an information system (IS) independent abstraction for finding...
Service Certification Checklist This page provides a checklist for every service on what to check in any case when certifying a patch for a specific service. These...
Service Discovery Service Discovery is a client side library to provide an information system (IS) independent abstraction for finding services and discovering their...
Service Discovery Test Plan Service Description Service Discovery is one of the SAGA APIs. The tests described here are specific to the gLite adapter. It is made...
Top tips for ROCs The weighted regional availability and reliability is calculated by giving more importance to larger sites. This is determined at the moment by the...
Slapd Analysis under Query Size Aspects This page should present the result of the performance analysis on a LDAP server under the the aspect of parallel requests...
Slapd Analysis running on a loaded machine One current issue for the Grid Information System is the fact that BDII`s (or GIIS`s) running on Grid Computing Elements...
YAIM logbook September 2007 Wednesday 5th September GGUS tickets support Savannah tickets support External sites support for YAIM 4.0.0 certification...
Reducing WLCG dependencies on BDII Introduction The Information System TF is working towards stopping WLCG dependencies in the BDII. This twiki presents the different...
snip Syncrepl supports both partial and sparse replications. The shadow DIT fragment is defined by a general search criteria consisting of base, scope, filter, and...
TWeeder info for EGEE Total Number of topics: 1317 0 Topics updated during the last 7 days Days Web Topic Date 1 Topics updated during the...
Use Cases This is a list of `use cases` the UIG would like to make available. The use cases are short documents which treat subjects of interest for users. The...
How to validate a ROC or NGI Nagios box Overview There are 4 different configurations which we cover with the egee NAGIOS packaging and configuration: Site Nagios...
VOMS Test Plan YAIM VOMS Configuration testing Both glite VOMS oracle an glite VOMS mysql should be configured with site info.def containing at least 2 VOs (DNS named...
VO software installation and maintenance Basic Requirements While many individual grid users supply the executables, libraries and application files required by their...
WLCG Information System Evolution Motivation In June 2015, OSG announced their plans to stop using the BDII to publish their computing resources (See Slides presented...
WLCG OSG EGEE Op`s Minutes Mon 17 Dec 2007 Date: Mon 17 Dec 2007 Agenda: 23803 Chair: NicholasThackray Minutes: SteveTraylen Minutes from...
WLCG OSG EGEE Op`s Minutes Mon 14 Jan 2008 Date: Mon 14 Jan 2008 Agenda: 23804 Chair: SteveTraylen Minutes: AntonioRetico Minutes from previous...
WLCG OSG EGEE Op`s Minutes Mon 11 Feb 2008 Date: Mon 11 Feb 2008 Agenda: 23808 Chair: MaiteBarroso Minutes: FaridaNaz Minutes from previous...
WLCG OSG EGEE Ops` Minutes Mon 03 Mar 2008 Date: Mon 03 Mar 2008 Agenda: 30001 Chair: NicholasThackray Minutes: SteveTraylen Minutes...
WLCG OSG EGEE Ops` Minutes Mon 23 Jun 2008 Date: Mon 23 Jun 2008 Agenda: 36456 Chair: NicholasThackray Minutes: SteveTraylen Minutes...
WLCG OSG EGEE Ops` Minutes Mon 04 Aug 2008 Date: Mon 04 Aug 2008 Agenda: 38938 Chair: MaiteBarroso Minutes: NicholasThackray Minutes...
WLCG OSG EGEE Ops` Minutes Mon 01 Sep 2008 Date: Mon 01 Sep 2008 Agenda: 40432 Chair: NicholasThackray Minutes: MaiteBarroso Minutes...
WLCG OSG EGEE Ops` Minutes Mon 06 Oct 2008 Date: Mon 06 Oct 2008 Agenda: 42750 Chair: SteveTraylen Minutes: JohnShade Minutes from previous...
WLCG OSG EGEE Ops` Minutes Tue 09 Dec 2008 Date: Mon 08 Dec 2008 Agenda: 43734 Chair: SteveTraylen Minutes: JohnShade Minutes from previous...
WLCG OSG EGEE Ops` Minutes Mon 19 Jan 2009 Date: Mon 19 Jan 2009 Agenda: 49102 Chair: MaiteBarroso Minutes: JohnShade Minutes from previous...
WLCG OSG EGEE Ops` Minutes Fri 23 Feb 2009 Date: Mon 23 Feb 2009 Agenda: 53064 Chair: MaiteBarroso Minutes: NicholasThackray Minutes...
WLCG OSG EGEE Ops` Minutes Mon 24 Aug 2009 Date: Mon 24 Aug 2009 Agenda: 66812 Chair: JohnShade Minutes: MaiteBarroso Minutes from previous...
WLCG OSG EGEE Ops` Minutes Mon 31 Aug 2009 Date: Mon 31 Aug 2009 Agenda: 67352 Chair: MaiteBarroso Minutes: SteveTraylen Minutes from previous...
EGEE Ops` Minutes Mon 02 Nov 2009 Date: Mon 02 Nov 2009 Agenda: 72954 Chair: JohnShade Minutes: MaiteBarroso Minutes from previous meetings...
The Workload Management System Admin Guide Introduction Service Overview The Workload Management System (WMS) comprises a set of Grid middleware components responsible...
a1 grid env 1. 0.0 1 grid environment selection scripts glite WN 3.0.11 0 cleanup grid accounts 1. 0.2 1 cleanup grid accounts glite WN 3.0.11 0...
Quick Links user guide YAIM configuration variables http://grid deployment.web.cern.ch/grid deployment/yaim/logo/yak yaim logo light.png What is YAIM...
YAIM cluster configuration: phase 1 Introduction This wiki page describes the steps that are needed to test the new yaim cluster module that contains the configuration...
YAIM cluster configuration: phase 2 Introduction This wiki page describes the steps that are needed to test the new Cluster node type that contains the configuration...
YAIM functions dictionary Please, note that only the functions used in 3.1 services and clients are described. config add pool env This function configures the pool...
YAIM configuration of the Information System Note: please, check the complete proposal in this wiki page Roadmap for releasing glite CLUSTER. Please, check the following...
YAIM configuration of the information system (v1) Introduction The following Glue objects are configured by YAIM: GlueCE and GlueVOView GlueCESEBindSE...
YAIM meetings minutes Thursday, 10th January, 2008 Oliver, Gergo and Maria We decide to analyse what bug fixes are ready to be released and unless there are...
Number of topics: 121

 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    EGEE All webs login

This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright & by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Ask a support question or Send feedback