Backlinks to TestResults in LCG Web

Results from LCG web retrieved at 13:35 (GMT)

Accounting Frequently Asked Questions Naming conventions Is there a mapping between naming schemes? New APEL Names Old APEL Names Rebus ATLAS Units processors...
Availability Computation Engine (ACE) The main thrust in building the Availability Computation Engine (ACE) is providing flexibility at various levels and allowing...
JamieShiers 07 Feb 2008 Week of 080204 Open Actions from last week: Monday: See the joint operations meeting Tuesday: No meeting due to CCRC`08 face to face meeting...
Introduction NEET ( N agios E xternal E xperiment T ests), is a tool to send experiment tests via `MSG` (Message BUS) to a specific QUEUE. Nagios reads from...
Summary of GDB meeting, May 14, 2014 (CERN) Agenda https://indico.cern.ch/event/272621/ Introduction M. Jouvin Next GDBs July meeting replaced by WLCG workshop...
Introduction This wiki page presents some results on bulk lfc methods to get replicas. Bulk methods which have been tested There are two methods. Test 2 :...
Introduction This wiki page presents some results on bulk lfc methods to get replicas against an LFC which support encryption. Bulk methods which have been tested...
Deployment of gLExec on the Worker Node Applicability The information on this page is relevant for WLCG sites with CREAM or OSG CE services (the ARC CE presently...
gLExec Deployment Tracking Conclusion ! a new plan for gLExec has been proposed in Ian Bird`s presentation on the `Follow up to the WLCG Workshop...
The patches that are currently in certification can be seen in Savannah: in certification. The `Assigned To` column shows who is taking care of a patch. If `Assigned...
gLite CE Test Work Log Changes: 2007 02 07: Two machines (CE and WMS) on certification testbed upgraded to condor 6.8.4 rpm Uvh nodeps condor 6.8.4 linux...
LCG Grid Deployment LCG Production Services GMOD Page All GMoDs please check page http://cern.ch/it servicestatus/ for necessary announcements via the CIC...
Monitoring Tools Interface Specification (draft) This is only a draft. Please don`t assume that any of the URLs presented below are the final ones! SAM data exports...
Grid Publisher Development Introduction The goal of this wiki page is to plan but also track the work on Grid Publisher foreseen by the Monitoring Working Group....
Gridview Service at CERN This page documents the deployment of the Gridview service at CERN. Contents Gridview Components The following diagram shows all the...
Gridview XML Interface Accessing GridFTP transfer data Gridview uses data transfer logs of GridFTP servers to calculate the transfer rates between the sites. These...
Grid Storage System Deployment Working Group About this working group Mandate Members Mailing list Meetings Current proposed sub groups...
HammerCloud abstract for EGI CF 2012 Title `Experience in Grid Site Testing for High Energy Physics with HammerCloud` Overview HammerCloud is a grid site testing...
Introduction Hammer Cloud is a stress testing service which is used by central operations teams, regional coordinators, and local site admins to submit arbitrary number...
Process for contacting sites Objective The objective is to get all the endpoints green. `Read only` endpoints with the appropriate standard file are shown as green...
HttpTpc Introduction The WebDAV extensions to HTTP provide a mechanism for invoking a copy between two resources. We utilize implementations of the HTTP COPY...
Activity summary Activity Support VO/project Purpose Contacts Web site Grid users Managerial...
SL4 LCG CE test notes This page describes all the tests have been done on SL4 LCG CE test setup CE: 2GB memory, dual 2.8GHz Xeon, lxb6139 Torque server...
AndreasUnterkircher 04 Apr 2006 A suggestion for a new presentation of the test results is here. Needs identified so far: Have the possibility to go down from...
A suggestion for a presentation layout of LCG/gLite tests can be found here. Needs identified so far: Have the possibility to go down from a high level view to...
NOTE: most of the links below are obsolete SHA 2 readiness testing SHA 2 readiness testing RFC proxies and SHA 2 gLExec deployment Deployment...
Auth and Auth Reports for LCG SCM from 2007 and earlier. December 12th 2007 Upgrade to new version of glite VOMS oracle and migration to SLC4 have been done...
LCGSCM Data Management Status Oct 21, 2009 Castor Currently running 2.1.8 12 on all VO instances DB hardware moves ongoing. Nameserver currently...
LCGSCM Data Management Status 2007 12 December 2007 Transfer service Bug fixes for FTS for SRM 2.2 support patch coming. CASTOR No issues. November...
LCGSCM Workload Management Status Oct 21 2009 Status 4 LCG CEs are in production pointing to the SLC5 resources (2 running the latest version of the software...
lcg util All the lcg util man pages can be found here : CLI and API. See also the notes. gfal All the gfal man pages can be found here : API. See also the notes...
Introduction This wiki page presents some results on bulk lfc methods against a LFC which supports encryption. Bulk methods which have been tested There are four...
Introduction This wiki page presents some results on bulk lfc methods. Bulk methods which have been tested There are four methods. Test 3 : int lfc delfilesbyguid...
Meeting 2011 02 16 Participants: Alessandro, Amol, Andrea, Julia, Lola, Maarten, Nicol , Pablo, Stefan, Wojciech Minutes (Andrea) Julia raises the need to be able...
WLCG Messaging System for Grids (MSG) Overview This page contains an overview of the WLCG MSG Messaging System from Grids. This is a solution based around ActiveMQ...
HBase Open source BigTable implementation on top of HDFS or other distributed FS in the Hadoop ecosystem. Column based NOSQL database. A stored value is addressed...
PPS Pilot Follow up Meeting Minutes Tue 01 Jul 2008 Date: Tue 01 Jul 2008 Agenda: 36931 Description: pilot of Cream CE: check point Chair: Antonio...
PPS Pilot Follow up Meeting Minutes Tue 11 Nov 2008 Date: Tue 11 Nov 2008 Agenda: 42943 Description: pilot of Cream CE: check point Chair: Antonio...
Pilot Follow up Meeting Minutes Tue 16 Feb 2010 Date: Tue 16 Feb 2010 Agenda: 83746 Description: Pilot of glexec/Argus : Check point Chair: Antonio...
PPS Pilot Follow up Meeting Minutes Tue 25 Jun 2009 Date: Tue 25 Jun 2009 Agenda: 62251 Description: Pilot of Cream CE: check point Chair: Antonio...
LCG Grid Deployment gLite Pre Production Services Pre Production Coordination Excerpts of this report are automatically published in OpsMeetingGliteReleases,...
2009 06 02(2): Task: gL3.2 U02 PPS Details:Mirror requested at CNAF ggus(GGUS:47326) Status: In Progress . Alvaro,Esteban 2009 06 01(1): Task: gL3.1 U48...
Cream CE Pilot Service: Description and Status. Start Date: 10 Jun 2008 End Date: 17 Mar 2009 Description: Pilot Service of Cream CE Coordinator:...
Release Testing Definition The Release Testing is a complementary step of the process of releasing middleware Updates to the production system. Before the middleware...
At the WLCG Operations Coordination Meeting on the 7th of May migration of SAM to MONIT infrastructure has been discussed. presentation minutes In order...
SAM/GridView visualisation proposal Use Cases Service failure analysis Purpose: check the overall status of all grid services to manually correlate failures...
SAM Maintenance Client components Sumbmission Client SAM submission client for the EGEE/LCG production grid infrastructure is installed on the machine lxn...
Summary of ROC Nagioses Evaluation Points that one should take into account before proceeding with the evaluation details. Differences Nagios vs SAM WMSes Different...
SAM Overview Introduction SAM (Service Availability Monitoring) is a framework for the monitoring of production and pre production grid sites. It provides a set of...
Requesting access to the SAM programmatic interface Due to unexpected high load on SAM DB in the past, when we had extremely high number of concurrent requests, we...
Site replies to SAM questionnaire See regarding SAM tests and Site availability reports CERN Do you use SAM tests for operations? Yes If yes...
As presented at the July WLCG consolidation meeting, please find below the questionnaire with the topics relevant to the evolution of the SAM probes and its framework...
In preparation to the next meeting where we would like to discuss SAM operations, development and deployment aspects and collaboration between SUM developers and developers...
DPM scalability tests All the test plans and results of the DPM scalability test will be reported in this wiki page. Test plans : series of tests Test results...
xrootd scalability tests All the test plans and results of the xrootd scalability test will be reported in this wiki page. Test plans series of tests Test results...
JamieShiers 22 Feb 2006 Preparation for SC4 Tier0 Tier1 Throughput tests Disk disk Tier0 Tier1 tests at the full nominal rate are scheduled for April. The proposed...
JamieShiers 01 Mar 2006 The Pre Production Service gLite 3.0 timeline and high level pps plans (presentation to Feb 28 MB). The final gLite 3.0.0 Beta, including...
The Easy SAM Portal Introduction Easy SAM portal is a simple perl based application which allows you to connect to SAM data base and display the content of it. Inspired...
TWeeder info for LCG Total Number of topics: 2659 10 Topics updated during the last 7 days Days Web Topic Date S7 LCG WLCGT0T1GridServices...
This table contains examples of the different availabilities in SAM2 and SAM3, the explanation for it, and any comments from the experiments and operations representatives...
Week of 081117 Baseline Versions Service Incident Reports This section lists WLCG Service Incident Reports from the previous weeks (new or updated only)....
Week of 090330 Baseline Versions Service Incident Reports This section lists WLCG Service Incident Reports from the previous weeks (new or updated only). GGUS...
Week of 090413 Baseline Versions Service Incident Reports This section lists WLCG Service Incident Reports from the previous weeks (new or updated only). GGUS...
Week of 100201 LHC Operations site Status News WLCG Service Incidents, Interventions and Availability VO Summaries of Site Availability SIRs...
Week of 100222 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 100308 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 100419 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 100614 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 100621 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 100927 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 101004 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 101025 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 101213 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 110207 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 110321 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 110411 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 110620 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 120305 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 120903 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1 Dial...
Week of 120924 Daily WLCG Operations Call details To join the call, at 15.00 CE(S)T Monday to Friday inclusive (in CERN 513 R 068) do one of the following: 1....
Week of 131014 WLCG Operations Call details To join the call, at 15.00 CE(S)T, by default on Monday and Thursday (at CERN in 513 R 068), do one of the following:...
Week of 160808 WLCG Operations Call details At CERN the meeting room is 513 R 068. For remote participation we use the Vidyo system. Instructions can be...
Using SAM to test IPv6 Goals Use SAM to submit automatic tests to IPv6 only or dual stack service instances over the IPv6 protocol for client server communications...
pre { text align: left; padding: 10px;margin left: 20px; color: black; font size: 16px } pre.command {background color: lightgrey;} pre.cfg {background color: lightblue...
HarryRenshall 15 Jun 2010 WLCG Service Open Issues This is a list of items raised at the daily WLCG Operations meeting that need to be followed up in some way...
Week of 181126 WLCG Operations Call details At CERN the meeting room is 513 R 068. For remote participation we use the Vidyo system. Instructions can be...
Week of 200608 WLCG Operations Call details At CERN the meeting room is 513 R 068. For remote participation we use the Vidyo system. Instructions can be...
WLCG Operations Coordination Minutes 7th March 2013 Agenda http://indico.cern.ch/conferenceDisplay.py?confId 239108 Attendance Local: Maria Girone (chair...
WLCG Operations Planning November 7, 2013 minutes Agenda https://indico.cern.ch/conferenceDisplay.py?confId 280057 Attendance Local: Simone Campana...
WLCG Operations Coordination Minutes August 21st, 2014 Agenda https://indico.cern.ch/event/326086/ Attendance Local: Andrea Sciab (secretary), Stefan Roiser...
WLCG Operations Coordination Minutes, May 7th 2015 Agenda https://indico.cern.ch/event/392739/ Attendance local: Maria Alandes (chair), Andrea Sciaba`...
WLCG Operations Coordination Minutes, Jan 18th 2018 Highlights Outcome of the discussion regarding SAM tests and A/R reports: The majority of T1 sites and VOs confirmed...
WLCG Operations Coordination Minutes, May 7, 2020 Highlights WLCG Critical Services. Review of definitions, impact and urgency. Migration of SAM to MONIT...
WLCG 2015 Site Survey Number of Virtual Organisations The number of supported LHC and non LHC virtual organisations is plotted below (histograms are stacked, not...
WLCG Tier1 Service Coordination Minutes 8th April 2010 Attendance Site Name(s) CERN Julia, Nicolo, Miguel, Dirk, Patricia, Zbyszek, TIm, Maria, Jamie...
WLCG Tier1 Service Coordination Minutes 3 June 2010 Attendance Jean Philippe, Patricia, Roberto, Manuel, Harry, Jamie, Maria, Simone, MariaDZ, Dirk, Lola, Eva,...
WLCG Tier1 Service Coordination Minutes 1 July 2010 Attendance Local: Jacek, Lola, Jean Phillipe, Manuel, Patricia, Tim, Andrea S, Andrea V, Flavia, Jamie, Maria...
Number of topics: 98

 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LCG All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback