Backlinks to Eventbuilder in LHCb Web

Results from LHCb web retrieved at 07:11 (GMT)

Slice Test Digitisation delay scan Data taking 1 Follow the instructions of the item `General start` of the instructions PVSS operation of the system if not...
Introduction The VELO ECS project controls the whole Velo detector: it includes the DAQ domain, the DCS domain, the HV domain and DAI domain. It runs on vedaqa01...
Last Published Publisher TWikiGuest Date 18 Aug 2008 16:50 {PublishContrib}{Dir} /afs/cern.ch/project/twiki/production/twiki/export/ {PublishContrib}{URL} https...
Slice Test PVSS operation of the system General start (only at the beginning of the day) 1 Log on to a Windows console in the online network and start Exceed...
This procedure describes how to perfom the `slice test`, i.e. how to test the set of Control Board channel, TELL1 and cables associated to one VELO slot with a hybrid...
TWeeder info for LHCb Total Number of topics: 2912 29 Topics updated during the last 7 days Days Web Topic Date S7 LHCb RichTestBeamMiniDaq...
This procedure describes how to perform the uniformity test for the verification of the TELL1 readout boards. The idea is to check that the response of each TELL...
Guide to DAQ operations: (supposing cold start crate reboot pcs reboot etc) 1 You will need to run PVSS on the windows PC (pcveloassembly3, on the left...
Cluster Generation for Firmware Checkout Preparation of the TELL1 code and configuration files The following instruction explain how to `inject` test patterns into...
Number of topics: 9

 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback