Backlinks to SiPM in LHCb Web

Results from LHCb web retrieved at 04:08 (GMT)

Work package: Frames and Infrastructure Chairs: Blake Leverington (Frames), Sune Jakobsen (Services) C Frame Integration Engineer: Thomas Mittelstaedt Documents...
Neutron shielding SciFi SiPMs noise rate in the SiPM of the Fiber Tracker (LHCb INT 2012 033) digitisation of the scintillating fibre detector (LHCb PUB...
Cooling Common primary chiller requirements (April 2016) (28 June 2016) of refrigeration options (M. Doubek) cooling meeting (13 October...
SciFi Software for the Tracker upgrade `To boldly go where no tracking detector has gone before.` (O.G.) FT versions Version Subversion Layer design...
Meeting 17 January 2014 Participants: Georg Schwering (Aachen), Guido Haefeli EPFL), Pascal Perret (Clermnt Ferrand), Nicoleta Dinu (Orsay), Marcel Merk (Nikhef...
Meeting 29 January 2014 Participants: Georg Schwering (Aachen), Guido Haefeli EPFL), Pascal Perret (Clermont Ferrand), Nicoleta Dinu (Orsay), Antonio Pelegrino...
Milestones as project planning old SYSTEM item milestone 2014 Sept 2015 number fraction achieved integral comment RICH CLARO Front End...
SevdaEsen 2016 04 20 Meetings (short summaries by Yasmine) 2012 12 05 : Seventeenth meeting : Agenda Olivier summarized the studies needed for the ST viability...
EDMS Engineering Documents (Drawings and Models) ItemEDMS FolderUpdated byFileLast ModifiedFinal/In Work SciFi Tracker LHCB 0581 ROBBERT CORNELL WALET Equipped...
Please add/modify the text as you wish Link to the Tracker TDR Introduction: a. Detector Layout in Sec. 3.3 of TDR: 3 stations, with four detection layers...
onferences Upcoming Conferences Name Where Date url Topic Abstract deadline Conferences with SciFi participation Conference...
June 4th Update A quote was received from the Austrian supplier for a 2m long, 50cm wide dummy sandwich in May? (April?) Check this. probably we will receive...
LHCb FT SiPM Cooling workpackage Mandate As defined at the Workshop (April 2013) ( summary): PG advises, simulates. Imperial: engineering design and construction...
June 4th Update The first task: To estimate the Flex cable length (my suggested version), will come Thurs June 6th. In terms of our schedule (for the HEP Imperial...
Date Meeting URL Other 17/10/2013 SiPM Cooling Workshop Page Summary 10/10/2013 SciFi Tracker Meeting Page 04/09/2013 SciFi Tracker...
Components info, datasheets, and PCB manufacturers (materials, manufacturing process, constraints) DC/DC converters DC/DC converter will be used to provide the...
Board requirements / Functions Hold the readout electronics for several SiPMs: 4 or 8 ? Feed the biasing Voltage to the SiPMs (biasing resistor and coupling...
Design specifications, development environment and maintenance constraints SiPM Model For the analog simulation a model of the SiPM has been developed in verilog...
18 June simulation files 100 events, minBias ColdAreaSiPMChannels.txt: SiPM 0 to 15 module 0 layer 0 HotAreaSiPMChannels.txt: SiPM 0 to 15 module...
Work package: Electronics WP leader: herve.chanal #64;cernNOSPAMPLEASE.ch Scope Develops, manufactures and fully characterises the PACIFIC ASIC, the motherboard and...
Frequently Asked Questions Why is a silicon detector not used around the beampipe? It was decided to instrument the downstream tracking stations with a single technology...
SciFi Module Assembly and Quality Assurance tests Access and Contacts Grey Room in LHCB Hall (ask for key`s LHCb secretariat) It has airconditioning/heating...
Work package: Fibre Procurement and QA WP leader: Christian.Joram #64;cernNOSPAMPLEASE.ch Team at CERN: Ana Barbara Cavalcante (until August 2016), Biplab...
Main Changes to the FT description: Should be a TWiki page, extend knowledge of experts to others, include links Zip file of material information brochures and MSDS...
Task: High Voltage Task coordinator: Guido.Haefeli #64;epflNOSPAMPLEASE.ch Deputy: tbd Scope The tasks consists in providing and testing the HV (SiPM...
Photos photos in CERNBox SciFi Google Photos Album CERN article 2019 11 12 https://cds.cern.ch/record/2701306# Posters OpenDays 2019 SciFi posters (svg and...
FTv5 updated Monolayer design with dead regions and SiPMs This version is an improved design of FTv4 with new features: updated dimensions all Modules have...
SciFi test procedures and commissioning Module Assembly and QA at CERN https://twiki.cern.ch/twiki/bin/view/LHCb/SciFiFibreModulesQA Cframe Commissioning The goal...
Work package: Readout box (aka ROB) WP leader: Jeroen.van.Tilburg #64;cernNOSPAMPLEASE.ch Scope The work package deals with the development and building of the Readout...
Reviews and Documents Production Readiness Reviews (PRR) The referee reports from PRRs and some EDRs are stored centrally (LHCb) here . Mat Production Aachen...
SciFi Software for the Tracker upgrade `To boldly go where no tracking detector has gone before.` (O.G.) FT versions Version Subversion Layer design...
Task: SiPM Support Task coordinator: Guido.Haefeli #64;epflNOSPAMPLEASE.ch Deputy: tbd Scope The tasks ensures the availability of expertise for the...
SciFi Tracker Test Beam November 2015 Instructions for shifters! Week1: No shifters. Just PACIFIC experts. Week2: TBD Shift List The shift list can be found here...
SciFi Tracker Testbeam November 2016 Instructions for Shifters Arrive promptly! Discuss previous data taking with current shift crew. Determine the...
General Information 1 You need a DESY indico account. This is not your CERN indico account. It takes a couple hours for someone to approve it. Then fill in the...
SciFi Tracker Test Beam July 2018 Logbook Runlogbook.ods: Logbook of the settings for each recorded run Instructions for Shifters yes Test beam is...
Project Scope To study the viability and radiation hardness of baseline scintillating fibers for the scintillating fiber tracker upgrade. Indico Meetings Page Goals...
SiPM Model SiPM model The model used is extracted from S. Seifert et al , `Simulation of Silicon Photomultiplier Signals`, IEEE trans. on nucl. science, vol....
Studying when starting the integration Requirement You need to have: a test bench with the full analog processing chain the values for t0 should run over...
SiPM Model with Mirco simulation file Requisite If you want to use directly the generated verilog a file you only need Cadence and the SiPM model. You can download...
TestBeam July 2018 SciFi for SHiP Charm Instructions Step 0 : Blow compressed air (pressure should be 6 bar or more) Step 1 : Set speed ethernet connection...
This section will summarise the main documents, informations and results of the May 2016 testbeam. A fibre based telescope was installed in the testbeam area. The...
Testbeam from November 2015 This section will summarise the main documents, informations and results of the November 2015 testbeam for EPFL. A fibre based telescope...
TestBeamOct2017 This section will summarize the main documents, informations and results of the October 2017 testbeam. A fiber based telescope was installed in the...
TestBeamOct2018 This section will summarize the main documents, informations and results of the October 2018 testbeam. A fiber based telescope was installed in...
TestBeamOct2019 @ DESY This section will summarize the main documents, informations and results of the October/November 2019 testbeam. A fiber based telescope was...
TWeeder info for LHCb Total Number of topics: 2912 29 Topics updated during the last 7 days Days Web Topic Date S7 LHCb RichTestBeamMiniDaq...
Number of topics: 47

 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback