Last Published Publisher TWikiGuest Date 27 Mar 2008 19:05 {PublishContrib}{Dir} /afs/cern.ch/project/twiki/production/twiki/export/ {PublishContrib}{URL} https...
Remains in Cambridge as reference board. JohnHill 15 May 2007
Remains in Cambridge as reference board. JohnHill 15 May 2007
Sent to Oxford on 3 August 2004. Returned to Cambridge on 2 September 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done....
Sent to CERN on 17 July 2005. Firmware 006/clock hardware fix done. Final QA not yet done. FW06 still to be done (despite note above!). All Tx...
Sent to Liverpool for Endcap C assembly on 12 August 2004. Returned to Cambridge on 3 April 2006. Sent to CERN on 31 May 2006. Firmware 006/clock hardware...
Sent to Oxford for Barrel assembly on 10 November 2004. Returned to Cambridge on 2 September 2005. Sent to CERN on 17 November 2005. Firmware 006/clock...
Sent to Oxford for Barrel assembly on 10 November 2004. Returned to Cambridge on 22 July 2005. Sent to CERN on 17 November 2005. Firmware 006/clock...
Sent to Oxford for Barrel assembly on 10 November 2004. Returned to Cambridge on 2 September 2005. Sent to CERN on 17 November 2005. Firmware 006/clock...
Sent to Oxford for Barrel assembly on 10 November 2004. Returned to Cambridge on 22 July 2005. Sent to CERN on 17 November 2005. Firmware 006/clock...
Sent to CERN on 27 July 2005. Firmware 006/clock hardware fix done. Final QA done on 22 March 2007. All four TX plugins removed for replacements for faulty...
Sent to Oxford for Barrel assembly on 18 February 2005. Returned to Cambridge on 22 July 2005. Sent to CERN on 17 November 2005. Firmware 006/clock...
Sent to CERN on 27 July 2005. Returned to Cambridge on 1 March 2007. Sent to CERN on 22 May 2007. Firmware 006/clock hardware fix done. Final QA...
Sent to CERN on 27 July 2005. Firmware 006/clock hardware fix NOT done. Final QA not yet done. Installed in SR1 Test Setup Removed from SR1 on...
Sent to CERN on 27 July 2005. Firmware 006/clock hardware fix done. Final QA done on 13 September 2006. Installed in USA15 on 14 September 2006....
Sent to CERN on 27July 2005. Firmware 006/clock hardware fix done. Final QA done on 22 March 2007. Installed in USA15 on 16 April 2007 by Dave Robinson...
Sent to Oxford for Barrel assembly on 2 December 2004. Returned to Cambridge on 20 June 2005. Sent to CERN on 27 July 2005. Returned to Cambridge on...
Sent to CERN on 21 January 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done....
Sent to CERN on 21 January 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done....
Sent to CERN on 21 January 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done....
Sent to CERN on 21 January 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done....
Sent to CERN on 21 January 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Returned to Cambridge on 31 January...
Sent to CERN on 21 January 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done....
Sent to CERN on 21 January 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done....
Sent to Oxford for Barrel Assembly on 25 February 2005. Returned to Cambridge on 2 September 2005. Sent to CERN on 17 November 2005. Firmware 006/clock...
Sent to Liverpool for Endcap C Assembly on 21 March 2005. Returned to Cambridge on 13 September 2005. Sent to CERN on 17 November 2005. Firmware...
Sent to Oxford for Barrel Assembly on 18 February 2005. Returned to Cambridge on 20 June 2005. Sent to CERN on 17 November 2005. Firmware 006/clock...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 16 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 28 April 2006. Installed in USA15 on 28 April 2006. Tx...
Sent to CERN on 9 May 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 26 April 2006. Installed in USA15 on 27 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 26 April 2006. Installed in USA15 on 26 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 27 April 2006. Installed in USA15 on 27 April 2006. Tx...
Sent to CERN on 31 May 2006. Firmware 006/clock hardware fix done. Final QA done on 25 August 2006. Installed in USA15 on 25 August 2006. Tx plugins...
Sent to Oxford for Barrel Assembly on 25 February 2005. Returned to Cambridge on 2 September 2005. Sent to CERN on 17 November 2005. Firmware 006/clock...
Sent to Oxford for Barrel Assembly on 25 February 2005. Returned to Cambridge on 2 September 2005. Sent to CERN on 17 November 2005. Firmware 006/clock...
Sent to Liverpool for Endcap C Assembly on 21 March 2005. Returned to Cambridge on 13 September 2005. Sent to CERN on 17 November 2005. Firmware...
Sent to CERN on 5 April 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final...
Sent to CERN on 5 April 2005. Returned to Cambridge on 8 August 2005. Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final...
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix done. Final QA done on 25 May 2007. Installed in USA15 on 13 November 2008 (replaced C...
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix done. Final QA done on 8 September 2006. Installed in USA15 on 8 September 2006....
Sent to CERN on 31 May 2006. Firmware 006/clock hardware fix done. Final QA done on 7 September 2006. Installed in USA15 on 7 September 2006. Tx...
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix done. Final QA done on 8 September 2006. Installed in USA15 on 8 September 2006....
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix done. Final QA done on 8 September 2006. Installed in USA15 on 8 September 2006....
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix done. Final QA not done. All Tx plugins removed for use elsewhere Installed crate...
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix done. Final QA done on 25 May 2007. Installed in USA15 Sep/Oct 2008 Removed from...
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix NOT done. Final QA not done. Designated `superbright` for TX testing purposes. Tx...
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix done. Final QA done on 25 May 2007. Installed in crate 7 slot 7 (USA15:Y.24 14.A2.U...
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix done. Final QA NOT done. Returned to Cambridge 26/9/2008 to do clock mod (despite above...
Sent to CERN on 18 July 2005. Firmware 006/clock hardware fix done. Final QA done on 25 May 2007. Installed in USA15 on 13 November 2008. Tx plugins...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 28 April 2006. Installed in USA15 on 28 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 28 April 2006. Installed in USA15 on 28 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 28 April 2006. Installed in USA15 on 15 May 2006. Tx plugins...
Sent to CERN on 17 November 2005. Returned to Cambridge on 7 April 2006. Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final...
Sent to CERN on 8 May 2005. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 8 May 2005. Firmware 006/clock hardware fix done. Final QA done on 16 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 27 April 2006. Installed in USA15 on 27 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 16 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 6 April 2006. Installed in USA15 on 27 April 2006. Tx...
Sent to CERN on 8 May 2005. Firmware 006/clock hardware fix done. Final QA done on 16 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 16 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 27 April 2006. Installed in USA15 on 27 April 2006. Removed...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 26 April 2006. Installed in USA15 on 27 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 27 April 2006. Installed in USA15 on 27 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 27 April 2006. Installed in USA15 on 28 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 7 April 2006. Installed in USA15 on 15 May 2006. Tx plugins...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 27 April 2006. Installed in USA15 on 27 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 26 April 2006. Installed in USA15 on 27 April 2006. Tx...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 28 April 2006. Installed in USA15 on 28 April 2006. Tx...
Sent to CERN on 17 November 2005. Returned to Cambridge on 7 April 2006 Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 27 April 2006. Installed in USA15 on 28 April 2006. Removed...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 28 April 2006. Installed in USA15 on 28 April 2006. Removed...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 27 April 2006. Installed in USA15 on 27 April 2006. Suspect...
Sent to CERN on 17 November 2005. Firmware 006/clock hardware fix done. Final QA done on 27 April 2006. Installed in USA15 on 27 April 2006. Removed...
Sent to CERN on 1March 2006. Firmware 006/clock hardware fix done. Final QA done on 19 May 2006. Installed in USA15 on 5 June 2006. Removed from...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 19 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 16 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 17 August 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Removed from...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 31 May 2006. Firmware 006/clock hardware fix done. Final QA done on 25 August 2006. Installed in USA15 on 25 August 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 19 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 19 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 18 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 1 March 2006. Firmware 006/clock hardware fix done. Final QA done on 19 May 2006. Installed in USA15 on 5 June 2006. Tx plugins...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 16 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 17 August 2006. Tx plugins...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 5 June 2006. Removed from...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 17 August 2006. Tx plugins...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 17 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN on 8 May 2006. Firmware 006/clock hardware fix done. Final QA done on 16 May 2006. Installed in USA15 on 5 June 2006. Tx plugins replaced...
Sent to CERN in March 2013 Installed July 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 Installed in July 2013 Rx plugins (0 7): x x x x SR753 SR756 SR332 SR377 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins(0 7): x x SR697 SR696 SR702 SR890 SR915 SR916 JohnHill 21 Aug 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x SR529 SR530 SR570 SR441 SR489 SR879 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x SR246 SR811 SR185 SR804 SR907 SR908 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x x x PR331 PR332 SR281 SR282 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x x x SR561 SR562 SR586 SR885 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x SR796 SR413 SR618 SR617 SR537 SR858 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x SR545 SR546 SR899 SR578 SR577 SR900 JohnHill 23 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x x x SR607 SR608 SR606 SR605 JohnHill 23 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x x x PR343 PR344 SR223 SR224 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x SR888 SR700 SR868 SR867 SR651 SR650 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x x x SR777 SR414 SR415 SR416 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x x x PR325 PR326 SR555 SR556 JohnHill 23 Aug 2013
Sent to CERN in June 2013 Broken insertion lever (bottom lever), repaired by Dave JohnHill 11 Jul 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x x x SR627 SR628 SR595 SR596 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x x x PR308 PR307 SR892 SR891 JohnHill 23 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x SR859 SR857 SR369 SR367 SR490 SR778 JohnHill 21 Aug 2013
Sent to CERN in June 2013 Installed July 2013 Rx plugins (0 7): x x SR860 SR795 SR656 SR527?? SR528?? SR855 JohnHill 21 Aug 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 Cap C48 missing, replaced at CERN by Sergei Katunin September 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 Cap C59 missing replaced at CERN by Sergei Katunin September 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Sent to CERN in June 2013 JohnHill 11 Jul 2013
Board arrived from LBL in Cambridge on 5 October 2004. Sent to Oxford on 11 November 2004. Returned to Cambridge on 2 September 2005. PRM updated to...
Board arrived from LBL in Cambridge on 5 October 2004. Sent to Oxford on 11 November 2004. Returned to Cambridge on 2 September 2005. PRM updated to...
Board arrived from LBL in Cambridge on 5 October 2004. Sent to Oxford on 11 November 2004. Returned to Cambridge on 2 September 2005. PRM updated to...
Board arrived from LBL in Cambridge on 5 October 2004. Sent to Oxford on 11 November 2004. Returned to Cambridge on 2 September 2005. PRM updated to...
Board arrived from LBL in Cambridge on 5 October 2004. Sent to Oxford on 11 November 2004. Returned to Cambridge on 22 July 2005. Sent to CERN on...
Board arrived from LBL in Cambridge on 5 October 2004. Sent to Oxford on 11 November 2004. Returned to Cambridge on 22 July 2005. Sent to CERN on...
Board arrived from LBL in Cambridge on 5 October 2004. Sent to Oxford on 11 November 2004. Returned to Cambridge on 2 September 2005. PRM updated to...
Sent from LBL to Cambridge on 5 October 2004. Sent from Cambridge to CERN on 24 January 2005. This ROD is part of the combined testing/cosmics setup in SR...
Sent from LBL to Cambridge on 5 October 2004. Sent from Cambridge to CERN on 24 January 2005. This ROD is part of the combined testing/cosmics setup in SR...
Sent from LBL to Cambridge on 5 October 2004. Sent from Cambridge to CERN on 24 January 2005. PRM updated to v17f on 3 Feb 2007. Final QA done on...
Sent from LBL to Cambridge on 5 October 2004. Sent from Cambridge to CERN on 24 January 2005. In use in SR1 test setup. PRM updated to v17f on 6 June...
Sent from LBL to Cambridge on 5 October 2004. Sent from Cambridge to CERN on 24 January 2005. Update PRM to 17f on 10 Sep 2006. Final QA done on...
Sent from LBL to Cambridge on 5 October 2004. Sent from Cambridge to CERN on 24 January 2005. Update PRM to 17f on 10 Sep 2006. Final QA done on...
Sent from LBL to Cambridge on 5 October 2004. Sent from Cambridge to CERN on 24 January 2005. Update PRM to 17f on 10 Sep 2006. Final QA done on...
Sent from LBL to Cambridge on 5 October 2004. Sent from Cambridge to CERN on 24 January 2005. In use in SR1 Test Setup PRM updated to v17f on 6 June...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Final QA test on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Final QA test on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007 FAILED burn test in USA15, May 2007 failure to read SDSP 0 returned to CERN from repair...
Sent from LBL to Cambridge on 19 January 2005. Sent to CERN on 24 January 2005. PRM updated to v17f on 3 Feb 2007. Final QA on 3 Feb 2007. JohnHill...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 31 January 2005. Sent to Cambridge on 2 September 2005. PRM updated to v17f on...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 31 January 2005. Sent to Cambridge on 2 September 2005. PRM updated to v17f on...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 31 January 2005. Sent to Cambridge on 2 September 2005. PRM updated to v17f on...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 31 January 2005. Sent to Cambridge on 2 September 2005. PRM updated to v17f on...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 18 February 2005. Sent to Cambridge on 2 September 2005. PRM updated to v17f on...
Sent from LBL to Cambridge on 19 January 2005. PRM updated to v17f on 10 February 2006. Sent to CERN on 1 March 2006 Final QA done on 27 March...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 18 February 2005. Sent to Cambridge on 10 March 2005. PRM updated to v17f on 10 February...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 18 February 2005. Sent to Cambridge on 10 March 2005. PRM updated to v17f on 10 February...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 18 February 2005. Sent to Cambridge on 25 October 2005. PRM updated to v17f on...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 18 February 2005. Sent to Cambridge on 29 June 2005. Sent to CERN on 27 July 2005....
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 18 February 2005. Sent to Cambridge on 22 July 2005. PRM updated to v17f on 10 February...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 1 March 2005. Sent to Cambridge on 25 October 2005. PRM updated to v17f on 10 February...
Sent from LBL to Cambridge on 19 January 2005. Sent to Oxford on 1 March 2005. Sent to Cambridge on 22 July 2005. PRM updated to v17f on 10 February...
Sent from LBL to Cambridge on 19 January 2005. Sent to UCL on 4 April 2005. Returned to Cambridge on 18 September 2006 PRM updated to v17f on 1 October...
Sent from LBL to Cambridge on 19 January 2005. Sent to CERN on 5 April 2005. Final QA done on 3 February 2007. JohnHill 02 May 2007
AndreasKorn 09 Feb 2006 arrived at CERN 2 Feb 2006, tested with BOC 3 Feb 2006 face plate scratch
Sent from LBL to Cambridge on 19 January 2005. Sent to CERN on 5 April 2005. Final QA done on 3 February 2007. Installed in USA15 on 30 October...
Sent from LBL to Cambridge on 19 January 2005. Sent to CERN on 9 May 2005. Final QA done on 3 February 2007. JohnHill 17 Feb 2006
Sent from LBL to Cambridge on 19 January 2005. PRM updated to v17f on 10 February 2006. Sent to CERN on 1 March 2006 Final QA done on 24 April...
Sent from LBL to Cambridge on 19 January 2005. Sent to CERN on 18 July 2005. Final QA done on 10 September 2006. Installed in USA15 on 11 September...
Sent from LBL to Cambridge on 19 January 2005. Sent to CERN on 18 July 2005. Update PRM to v17f on 3 Feb 2007. Final QA done on 3 Feb 2007. JohnHill...
Sent from LBL to Cambridge on 19 January 2005. Sent to CERN on 18 July 2005. Used in USA15 with `superbright` BOC from January 2007. PRM updated to...
Sent from LBL to Cambridge on 19 January 2005. Sent to CERN on 18 July 2005. PRM updated to v17f on 3 Feb 2007. Final QA done on 3 Feb 2007. Removed...
Sent from LBL to Cambridge on 19 January 2005. PRM updated to v17f on 10 February 2006. Sent to CERN on 28 August 2006 Final QA done on 8 September...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007 occurrence of dead MDSP possibly bad...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007 occurrence of dead MDSP possibly bad...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007 occurrence of dead MDSP possibly bad...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007 occurrence of dead MDSP possibly bad...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet no data on SLink, fixed after reseating
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet board 188 was mislabeled as 118, 118 never left LBNL
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Delivered to CERN 10.04.2014 DaveRobinson 10 Apr 2014
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, test started using modified RodBurn 26 Sep installed 2nd crate in SR1 26 Sep 2006
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet SLink data with bit 0 dead, fixed by reseating the ROD
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, not fully tested yet installed SR1 moved to USA15
AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, not fully tested yet installed 2nd crate in SR1 26 Sep 2006 moved to USA15
AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, not fully test yet installed 2nd crate in SR1 26 Sep 2006
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, not fully tested yet installed 2nd crate in SR1 2006 6 Nov 2006 moved to USA15
AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, not fully test yet
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
AndreasKorn 09 Feb 2006 arrived at CERN 2 FEb 2006, tested 3 Feb 2006 inital problems during test, gone after MDSP reflash and reseating
AndreasKorn 09 Feb 2006 arrived at CERN 2 Feb 2006, tested 3 Feb 2006 installed 2nd crate in SR1 2 Aug 2006 moved to USA15
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007 occurrence of dead MDSP possibly bad...
AndreasKorn 09 Feb 2006 arrived at CERN 2 Feb 2006, tested with ROD CLK 2 Feb 2006 face plate scratch installed 2nd crate in SR1 2 Aug 2006 moved...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet Had problems initializing in February 2009 during a short test, but the infrastructure...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 20 Nov 2007 arrived at CERN 12 Jan 2007, not fully tested yet board 188 was mislabeled as 118, 118 never left LBNL
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed in USA15 no configuration through TXC, not a ROD problem (swapped...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007 FAILED burn test in USA15, May 2007 VME error, but passes burn test on ROD clock returned...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
AndreasKorn 09 Feb 2006 arrived at CERN 3 Feb 2006, tested with ROD CLK 2 Feb 2006 installed 2nd crate in SR1 2 Aug 2006 problem with sending all L1ID...
AndreasKorn 09 Feb 2006 arrived at CERN 2 Feb 2006, tested with ROD CLK 2 Feb 2006 installed in SR1 5 Apr 2006 installed in USA15 occurrence of...
AndreasKorn 09 Feb 2006 arrived at CERN 2 Feb 2006, tested with BOC 3 Feb 2006 installed at SR1 30 March 2006
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 09 Feb 2006 arrived at CERN 2 Feb 2006, tested with ROD CLK 3 Feb 2006 face plate scratch installed 2nd crate in SR1 2 Aug 2006
AndreasKorn 09 Feb 2006 arrived at CERN 2 Feb 2006, tested with ROD CLK 3 Feb 2006 installed in SR1 5 Apr 2006 problems with Slink Xoff, after power...
AndreasKorn 09 Feb 2006 arrived at CERN 2 Feb 2006, tested with ROD CLK 3 Feb 2006 installed in SR1 30 March 2006
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006 failed. SDSP daughterboards...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet installed in SR1 moved to USA15
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 16 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007 occurrence of dead MDSP possibly bad...
Not a SCT ROD JohnHill 17 Feb 2006
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Not a SCT ROD JohnHill 17 Feb 2006
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Not a SCT ROD JohnHill 17 Feb 2006
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007 occurrence of dead MDSP possibly bad...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Not a SCT ROD JohnHill 17 Feb 2006
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Not a SCT ROD JohnHill 17 Feb 2006
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Not a SCT ROD JohnHill 17 Feb 2006
AndreasKorn 15 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Shipped from LBNL and arrived at CERN on 22/11/2005. PRM v17f preinstalled at LBNL Acceptance tested on 17 January 2006. Installed in USA15 on 8 March...
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007 passed burntest in USA15, but out of synch MDSP led checked jumpers, still out of synch with TIM...
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007 occurrence of dead MDSP possibly bad...
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Not a SCT ROD JohnHill 17 Feb 2006
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
Shipped from LBNL and arrived at CERN on 04/09/2006. PRM v17f preinstalled at LBNL Acceptance tested on 8 September 2006. Installed in USA15 on 8 September...
Not a SCT ROD JohnHill 17 Feb 2006 AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, not fully tested yet
Not a SCT ROD JohnHill 17 Feb 2006
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
Shipped from LBNL and arrived at CERN on 04/09/2006. PRM v17f preinstalled at LBNL Acceptance tested on 8 September 2006. Installed in USA15 on 8 September...
AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, not fully tested yet installed 2nd crate in SR1 26 Sep 2006 no or corrupted data on SLink, fixed...
Shipped from LBNL and arrived at CERN on 04/09/2006. PRM v17f preinstalled at LBNL Acceptance tested on 9 September 2006. Installed in USA15 on 11 September...
AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, test started with modified RodBurn installed 2nd crate in SR1 26 Sep 2006
Shipped from LBNL and arrived at CERN on 04/09/2006. PRM v17f preinstalled at LBNL Acceptance tested on 9 September 2006. Installed in USA15 on 11 September...
Shipped from LBNL and arrived at CERN on 04/09/2006. PRM v17f preinstalled at LBNL Acceptance tested on 8 September 2006. Installed in USA15 on 8 September...
Shipped from LBNL and arrived at CERN on 04/09/2006. PRM v17f preinstalled at LBNL Acceptance tested on 9 September 2006. Installed in USA15 on 11 September...
AndreasKorn 30 Oct 2007 arrived at CERN 15 Oct 2007 as one of 5 additional spares installed in USA15 crate 29
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet installed SR1 moved to USA15 BCID problems, ROD BCID is fine, but module...
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet installed USA15, burn tested 2 May 2007 occurrence of dead MDSP possibly bad...
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet failed burntest in USA15, May 2007 MDSP hardbeat failure returned to...
AndreasKorn 26 Sep 2006 arrived at CERN 25 Sep 2006, test started with modified RodBurn installed 2nd crate in SR1 26 Sep 2006
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 30 Oct 2007 arrived at CERN 15 Oct 2007 as one of 5 additional spares needs firmware revival after bad upgrade 31 March 2008 installed as...
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet found with no master hardbeat, fixed by reset
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 30 Oct 2007 arrived at CERN 15 Oct 2007 as one of 5 additional spares not fully tested yet 02 Apr 2008 showed peculiar problem: b0f...
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet
AndreasKorn 30 Oct 2007 arrived at CERN 15 Oct 2007 as one of 5 additional spares not fully tested yet
Delivered to CERN 10.04.2014 DaveRobinson 10 Apr 2014
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet
AndreasKorn 30 Oct 2007 arrived at CERN 15 Oct 2007 as one of 5 additional spares needs firmware revival after bad upgrade
Shipped from LBNL and arrived at CERN on 04/09/2006. PRM v17f preinstalled at LBNL Acceptance tested on 9 September 2006. Installed in USA15 on 11 September...
Delivered to CERN 10.04.2014 DaveRobinson 10 Apr 2014
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet temporarily installed in USA15 for first tests 05 Apr 2007
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet occurrence of dead MDSP possibly bad configuration, fixed by reset
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet installed in SR1 moved to USA15
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 16 Feb 2007 arrived at CERN 16 Feb 2007, not fully tested yet
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet installed USA15, burn tested 2 May 2007
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet command line 7 is dead, checked in Pixellab with LoopBackCard Visual inspection...
AndreasKorn 15 Jan 2007 arrived at CERN 25 Sep 2006, not fully tested yet installed in SR1 25 Apr 2007
AndreasKorn 16 Jan 2007 arrived at CERN 12 Jan 2007, not fully tested yet
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
Delivered to CERN 10.04.2014 DaveRobinson 10 Apr 2014
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
Delivered to CERN 10.04.2014 DaveRobinson 10 Apr 2014
arrived at CERN on week 33 / 2013 visual inspection OK installation as in SR1: FPGA versions currently loaded on this Rev.f ROD are... ROD Controller...
AtlasSiliconRodGroup Set GROUP HeatherGray, JohnHill, JohnJoseph, AndreasKorn, TrevorVickey, JedBiesiada, DaveRobinson, ShihChiehHsu, MarkCooke Set ALLOWTOPICCHANGE...
Received at CERN on 17 November 2005. Installed in USA15 on 8 March 2006. JohnHill 17 May 2007
Received at CERN on 17 November 2005. Installed in USA15 on 8 March 2006. JohnHill 17 May 2007
Received at CERN on 17 November 2005. Installed in USA15 on 8 March 2006. JohnHill 17 May 2007
Received at CERN on 17 November 2005. Installed in USA15 on 8 March 2006. JohnHill 17 May 2007
Received at CERN on 17 November 2005. Installed in USA15 on 8 March 2006. JohnHill 17 May 2007
Received at CERN on 17 November 2005. Installed in USA15 on 14 August 2006. JohnHill 17 May 2007
Received at CERN on 17 November 2005. Installed in USA15 on 24 April 2006. JohnHill 17 May 2007
Received at CERN on 17 November 2005. Installed in USA15 on 8 March 2006. JohnHill 17 May 2007
Received at CERN on 17 November 2005. Installed in USA15 on 8 March 2006. Discovered to be faulty and sent off for repair on 20 January 2007. Received...
Received at CERN on 17 November 2005. Sent to Cambridge for testing on 2 December 2005. JohnHill 17 May 2007
Received at CERN on 17 November 2005. Installed in USA15 on 20 January 2007 to replace faulty SBC. JohnHill 17 May 2007
Received at CERN on 17 November 2005. JohnHill 17 May 2007
Received at CERN on 17 November 2005. JohnHill 17 May 2007
Sent from UCL to CERN on 18 October 2005. Installed in USA15 Crate 6 21/01/10 JohnHill 23 Feb 2006 DaveRobinson 21 Jan 2010
Sent from UCL to Cambridge on 18 May 2005 Sent from Cambridge to UCL on 17 November 2005 Sent from UCL to CERN on 29 November 2005 In use in SR1 test...
Sent from UCL to Oxford on 18 May 2005 Sent from Oxford to UCL on 18 October 2005 Sent from UCL to CERN on 14 November 2005. Installed in USA15 on...
Sent from UCL to CERN on 29 November 2005. Installed in USA15 on 2 July 2007, to replace TIM 31, which is faulty. Applied firmware update tim fpga2 v1b...
Sent from UCL to CERN on 14 November 2005. Installed in USA15 on 24 April 2006 Applied firmware update tim fpga2 v1b 2008 06 13.mcs 19/06/08 DaveR JohnHill...
Sent from UCL to CERN on 14 November 2005. Installed in USA15 on 8 March 2006. Removed from USA15 on 2 July 2007 faulty. Any VME access with TIM in crate...
Sent from UCL to CERN on 14 November 2005. Installed in USA15 on 8 March 2006. Applied firmware update tim fpga2 v1b 2008 06 13.mcs 19/06/08 Removed...
Sent from UCL to CERN on 14 November 2005. Installed in USA15 on 8 March 2006. Applied firmware update tim fpga2 v1b 2008 06 13.mcs 19/06/08 DaveR Stopped...
Sent from UCL to CERN on 14 November 2005. Installed in USA15 8 March 2006. Applied firmware update tim fpga2 v1b 2008 06 13.mcs 19/06/08 DaveR JohnHill...
Sent from UCL to CERN on 14 November 2005. Installed in USA15 on 8 March 2006. Applied firmware update tim fpga2 v1b 2008 06 13.mcs 19/06/08 DaveR JohnHill...
Sent from UCL to CERN on 14 November 2005. Installed in USA15 on 8 March 2006. Applied firmware update tim fpga2 v1b 2008 06 13.mcs 19/06/08 DaveR JohnHill...
Board remains at UCL for test purposes JohnHill 15 May 2007
Sent from UCL to Cambridge on 16 November 2005. Arrived to CERN end of June 2008 (w/o TTCrq plugin) TTCrq plugin #xxx from faulty Pixel TIM 3C #346 was sent...
Used in SR1 in crate 1 for cosmics test in Dec. 2006. Moved to point 1 on 19 Oct 2007 IskanderIbragimov 19 Oct 2007
Arrived at CERN in November 2006. Installed and tested in USA15 on 2.05.07. IskanderIbragimov 07 May 2007
Arrived at CERN in November 2006. Installed and tested in USA15 on 2.05.07. IskanderIbragimov 07 May 2007
Arrived at CERN in November 2006. Installed and tested in USA15 on 2.05.07. Diagnosted to have flaky D connection somewhere btw. FPGA 1 and FPGA2 (probably...
Arrived at CERN in November 2006. Installed and tested in USA15 on 2.05.07. IskanderIbragimov 07 May 2007
Arrived at CERN in November 2006. Installed and tested in USA15 on 2.05.07. IskanderIbragimov 07 May 2007
Arrived at CERN in November 2006. Installed and tested in USA15 on 2.05.07. IskanderIbragimov 07 May 2007
Arrived at CERN in November 2006. Installed USA15 4th Sep 2007. Diagnosted to have flaky write line somewhere btw. FPGA 1 and FPGA2 (probably bad bump bond...
Used in SR1 in Cr0 for cosmics run during Dec 2006. Moved to Point 1 on 19 Oct 2007. IskanderIbragimov 19 Oct 2007
Arrived at CERN in November 2006. Installed USA15 4th Sep 2007 IskanderIbragimov 07 May 2007 AndreasKorn 12 Sep 2007
Arrived at CERN in November 2006. Installed USA15 4th Sep 2007 IskanderIbragimov 07 May 2007 AndreasKorn 12 Sep 2007
Rev 3F board from new batch. Sent to CERN on 28 Oct 2008 from September 2015 to 09.06. in Pixel HW development crate in SR1 (pixrcc01 or pixrcc07) no...
Rev 3F board from new batch. Sent to CERN on 28 Oct 2008 JohnHill 27 Mar 2009
Rev 3F board from new batch. Sent to CERN on 28 Oct 2008 JohnHill 27 Mar 2009
Rev 3F board from new batch. Remained at UCL as at 29 July 2008 Transferred to CERN 16/11/2015. Loaned to Pix, as a test object in SR1. JohnHill...
Arrived to CERN in August 2008 TTCrq #78 plugged in 10.11.08 (TTCrx v3.2 is used) some ID underlined: CEG EDA00111DF, 000526233030000078 IskanderIbragimov...
Arrived to CERN in August 2008 TTCrq #476 plugged in 10.11.08 (TTCrx v3.2 is used) some ID underlined: CEG EDA00111DF Has never been to Bologna was in...
Arrived to CERN on 28.10.2008 Uses TTCrq plugin #199 previously mounted in Pixel TIM 3C #342 Jumper settings checked. Be aware photo 2 (DIP switches)...
Rev 3F board from new batch. Remained at UCL as at 29 July 2009 JohnHill 27 Mar 2009
Rev 3F board from new batch. Sent to Cambridge on 16 October 2008. JohnHill 27 Mar 2009
ATLAS Group Activities: II twiki page organization UpgradeMeetings: PublicationDataBases: EventLoopAnalysissFCal: NtupleWithTowersSubmitAtGrid...
SCT BOC VME board status and service log SCT BOC Serial Number Current Location Revision Notes 032 Cam for Testing Rev. C BOC 032 History...
SCT SBC VME board status and service log ATLAS MTF Serial Number SBC Serial Number Current Location Notes 0001 M8805/071 USA15:Y.24 14.A2.U...
Silicon TIM VME board status and service log TIM Serial Number Flavor Current Location Revision FFTV Notes 26 SCT TIM USA15:Y....
TWeeder info for Main Total Number of topics: 24954 92 Topics updated during the last 7 days Days Web Topic Date S7 Main PPHighMult...
Statistics for Main Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top viewers: Top contributors...
Number of topics: 485

 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback