Difference: ApprovedPlotsDCS (1 vs. 8)

Revision 82014-08-05 - StefanSchlenker

Line: 1 to 1
 
META TOPICPARENT name="Atlas.ApprovedDetectorPlots"
AtlasPublicTopicHeader.png
Line: 22 to 22
 
Changed:
<
<
Figure 2: Atlas DCS user interface at the morning of the 10th of September 2008. It shows an overview of the state of all detector components. Some of the sub-detectors are in the NOT_READY state as they require a stable beam condition to be switched on. pngPNG
>
>
Figure 2: Atlas DCS user interface during a regular LHC fill for luminosity production with p-p-collisions. It shows an overview of the state of all detector components. pngPNG
 
Changed:
<
<
Figure 3: Common Infrastructure Control within Atlas DCS for counting room USA15 Level1 at the morning of the 10th of September 2008, showing the state of all electronics racks and the environmental monitoring. pngPNG
Figure 4: Magnet monitoring interface in Atlas DCS. State of all Atlas magnets at the morning of the 10th of September 2008. The trend plot shows the current time evolution during the previous two days including the ramp up phase of the toroid magnet. pngPNG
>
>
 
Line: 66 to 56
 
META FILEATTACHMENT attachment="MAGNETS_1stbeam_low.png" attr="h" comment="" date="1232631388" name="MAGNETS_1stbeam_low.png" path="MAGNETS_1stbeam_low.png" size="50315" stream="MAGNETS_1stbeam_low.png" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="CIC_1stbeam.png" attr="" comment="Common Infrastructure Control" date="1232631405" name="CIC_1stbeam.png" path="CIC_1stbeam.png" size="219958" stream="CIC_1stbeam.png" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="MAGNETS_1stbeam.png" attr="" comment="Magnet Monitoring" date="1232631425" name="MAGNETS_1stbeam.png" path="MAGNETS_1stbeam.png" size="301348" stream="MAGNETS_1stbeam.png" user="Main.StefanSchlenker" version="1"
Added:
>
>
META FILEATTACHMENT attachment="ATLAS_DCS_FSM_low.png" attr="" comment="" date="1407246319" name="ATLAS_DCS_FSM_low.png" path="ATLAS_DCS_FSM_low.png" size="112768" user="stefan" version="1"
META FILEATTACHMENT attachment="ATLAS_DCS_FSM_plain.png" attr="" comment="Main DCS operator interface during a LHC fill with p-p-collisions in September 2012." date="1407246387" name="ATLAS_DCS_FSM_plain.png" path="ATLAS_DCS_FSM_plain.png" size="1172570" user="stefan" version="1"

Revision 72010-12-06 - ElmarRitsch

Line: 1 to 1
Changed:
<
<
META TOPICPARENT name="ApprovedDetectorPlots"
No permission to view Atlas.AtlasPublicTopic
<!--  
  • Set DENYTOPICVIEW =
  • Set ALLOWTOPICCHANGE = atlas-readaccess-current-physicists
-->
>
>
META TOPICPARENT name="Atlas.ApprovedDetectorPlots"
AtlasPublicTopicHeader.png
 

Approved Detector Control System (DCS) Figures

Line: 46 to 41
 

Links

Changed:
<
<
>
>
 
<!--***********************************************************-->
<!--Do NOT remove the remaining lines, but add requested info as appropriate-->

Revision 62010-05-10 - PatrickJussel

Line: 1 to 1
 
META TOPICPARENT name="ApprovedDetectorPlots"
Warning
Can't INCLUDE Atlas.AtlasPublicTopic repeatedly, topic is already included.
<!--  
  • Set DENYTOPICVIEW =
Added:
>
>
  • Set ALLOWTOPICCHANGE = atlas-readaccess-current-physicists
 
-->
Added:
>
>
 

Approved Detector Control System (DCS) Figures

<!--optional-->

Revision 52009-11-24 - PatrickJussel

Line: 1 to 1
 
META TOPICPARENT name="ApprovedDetectorPlots"
Added:
>
>
Warning
Can't INCLUDE Atlas.AtlasPublicTopic repeatedly, topic is already included.
<!--  
  • Set DENYTOPICVIEW =
-->
 

Approved Detector Control System (DCS) Figures

<!--optional-->

Revision 42009-01-22 - StefanSchlenker

Line: 1 to 1
 
META TOPICPARENT name="ApprovedDetectorPlots"

Approved Detector Control System (DCS) Figures

Line: 20 to 20
 
Changed:
<
<
Figure 2: Atlas DCS user interface at the morning of the 10th of September 2008. It shows an overview of the state of all detector detector components. pngPNG
>
>
Figure 2: Atlas DCS user interface at the morning of the 10th of September 2008. It shows an overview of the state of all detector components. Some of the sub-detectors are in the NOT_READY state as they require a stable beam condition to be switched on. pngPNG
 
Line: 30 to 30
 
Changed:
<
<
Figure 4: Magnet monitoring interface in Atlas DCS. State of all Atlas magnets at the morning of the 10th of September 2008. The trend plot shows the current time evolution during the previous two days including the ramp up phase. pngPNG
>
>
Figure 4: Magnet monitoring interface in Atlas DCS. State of all Atlas magnets at the morning of the 10th of September 2008. The trend plot shows the current time evolution during the previous two days including the ramp up phase of the toroid magnet. pngPNG
 

Revision 32009-01-22 - StefanSchlenker

Line: 1 to 1
 
META TOPICPARENT name="ApprovedDetectorPlots"

Approved Detector Control System (DCS) Figures

Line: 25 to 25
 
Changed:
<
<
Figure description ...
>
>
Figure 3: Common Infrastructure Control within Atlas DCS for counting room USA15 Level1 at the morning of the 10th of September 2008, showing the state of all electronics racks and the environmental monitoring. pngPNG
 
Changed:
<
<
[the figure]
>
>
Figure 4: Magnet monitoring interface in Atlas DCS. State of all Atlas magnets at the morning of the 10th of September 2008. The trend plot shows the current time evolution during the previous two days including the ramp up phase. pngPNG
 
Line: 53 to 58
 
META FILEATTACHMENT attachment="architecture_low.png" attr="h" comment="thumbnail version of Figure 1" date="1232619020" name="architecture_low.png" path="architecture_low.png" size="101937" stream="architecture_low.png" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="architecture.jpg" attr="" comment="DCS Architecture." date="1232619043" name="architecture.jpg" path="architecture.jpg" size="543935" stream="architecture.jpg" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="architecture.eps" attr="" comment="DCS Architecture. EPS version." date="1232619075" name="architecture.eps" path="architecture.eps" size="579211" stream="architecture.eps" user="Main.StefanSchlenker" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="ATLAS_DCS_1stbeam_low.png" attr="h" comment="" date="1232621835" name="ATLAS_DCS_1stbeam_low.png" path="ATLAS_DCS_1stbeam_low.png" size="82554" stream="ATLAS_DCS_1stbeam_low.png" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="ATLAS_DCS_1stbeam_plain.png" attr="" comment="DCS interface at 10th of September 2008." date="1232621886" name="ATLAS_DCS_1stbeam_plain.png" path="ATLAS_DCS_1stbeam_plain.png" size="782729" stream="ATLAS_DCS_1stbeam_plain.png" user="Main.StefanSchlenker" version="1"
>
>
META FILEATTACHMENT attachment="ATLAS_DCS_1stbeam_low.png" attr="h" comment="" date="1232631344" name="ATLAS_DCS_1stbeam_low.png" path="ATLAS_DCS_1stbeam_low.png" size="82017" stream="ATLAS_DCS_1stbeam_low.png" user="Main.StefanSchlenker" version="2"
META FILEATTACHMENT attachment="ATLAS_DCS_1stbeam_plain.png" attr="" comment="DCS interface at 10th of September 2008." date="1232631363" name="ATLAS_DCS_1stbeam_plain.png" path="ATLAS_DCS_1stbeam_plain.png" size="774449" stream="ATLAS_DCS_1stbeam_plain.png" user="Main.StefanSchlenker" version="2"
META FILEATTACHMENT attachment="CIC_1stbeam_low.png" attr="h" comment="" date="1232631376" name="CIC_1stbeam_low.png" path="CIC_1stbeam_low.png" size="53712" stream="CIC_1stbeam_low.png" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="MAGNETS_1stbeam_low.png" attr="h" comment="" date="1232631388" name="MAGNETS_1stbeam_low.png" path="MAGNETS_1stbeam_low.png" size="50315" stream="MAGNETS_1stbeam_low.png" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="CIC_1stbeam.png" attr="" comment="Common Infrastructure Control" date="1232631405" name="CIC_1stbeam.png" path="CIC_1stbeam.png" size="219958" stream="CIC_1stbeam.png" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="MAGNETS_1stbeam.png" attr="" comment="Magnet Monitoring" date="1232631425" name="MAGNETS_1stbeam.png" path="MAGNETS_1stbeam.png" size="301348" stream="MAGNETS_1stbeam.png" user="Main.StefanSchlenker" version="1"

Revision 22009-01-22 - StefanSchlenker

Line: 1 to 1
 
META TOPICPARENT name="ApprovedDetectorPlots"

Approved Detector Control System (DCS) Figures

Line: 15 to 15
 
Changed:
<
<
Figure description ...
>
>
Figure 1: Schema of DCS architecture. The detector hardware is interfaced to the DCS front-end systems (sensors, PLCs etc.). The data is processed by a hierarchical back-end system and presented to the control room operator using a single user interface. epsPostscript, jpgJPEG
 
Changed:
<
<
[the figure]
>
>
 
Changed:
<
<
Figure description ...
>
>
Figure 2: Atlas DCS user interface at the morning of the 10th of September 2008. It shows an overview of the state of all detector detector components. pngPNG
 
Changed:
<
<
[the figure]
>
>
 
Figure description ...
Line: 34 to 34
 

Links

Changed:
<
<
>
>
 
<!--***********************************************************-->
<!--Do NOT remove the remaining lines, but add requested info as appropriate-->
Line: 49 to 49
 Last reviewed by: Never reviewed

\ No newline at end of file

Added:
>
>
META FILEATTACHMENT attachment="architecture_low.png" attr="h" comment="thumbnail version of Figure 1" date="1232619020" name="architecture_low.png" path="architecture_low.png" size="101937" stream="architecture_low.png" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="architecture.jpg" attr="" comment="DCS Architecture." date="1232619043" name="architecture.jpg" path="architecture.jpg" size="543935" stream="architecture.jpg" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="architecture.eps" attr="" comment="DCS Architecture. EPS version." date="1232619075" name="architecture.eps" path="architecture.eps" size="579211" stream="architecture.eps" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="ATLAS_DCS_1stbeam_low.png" attr="h" comment="" date="1232621835" name="ATLAS_DCS_1stbeam_low.png" path="ATLAS_DCS_1stbeam_low.png" size="82554" stream="ATLAS_DCS_1stbeam_low.png" user="Main.StefanSchlenker" version="1"
META FILEATTACHMENT attachment="ATLAS_DCS_1stbeam_plain.png" attr="" comment="DCS interface at 10th of September 2008." date="1232621886" name="ATLAS_DCS_1stbeam_plain.png" path="ATLAS_DCS_1stbeam_plain.png" size="782729" stream="ATLAS_DCS_1stbeam_plain.png" user="Main.StefanSchlenker" version="1"

Revision 12009-01-21 - AndreasHoecker

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="ApprovedDetectorPlots"

Approved Detector Control System (DCS) Figures

<!--optional-->

Introduction

The DCS commissioning and performance figures below are approved to be shown by ATLAS speakers at conferences and similar events.

Please do not add figures on your own. Contact the DCS project leader in case of questions and/or suggestions.

Figures

Figure description ... [the figure]
Figure description ... [the figure]
Figure description ... [the figure]

Links

<!--***********************************************************-->
<!--Do NOT remove the remaining lines, but add requested info as appropriate-->
<!--***********************************************************-->


<!--Please add the name of someone who is responsible for this page so that he/she can be contacted if changes are needed.
The creator's name will be added by default, but this can be replaced if appropriate.
Put the name first, without dashes.-->
Responsible: Helfried Burckhart
<!--Once this page has been reviewed, please add the name and the date e.g. StephenHaywood - 31 Oct 2006 -->
Last reviewed by: Never reviewed
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback