Difference: TestRun (1 vs. 38)

Revision 382015-09-14 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 63 to 63
 
ID Description H/V cable HV PSU port Signal cable TDC channel Scalar channel QDC channel ADC channel
CH0 Upstream (BCA) Che0 Neg-4 91 2-3 3    
CH1 Downstream (BCB) Che1 Neg-5 P-05 2-4 4    
Changed:
<
<
SC0 Fixed beam scintillator - - P-12 (last meter is patch-cable B-02) 2-0 0    
>
>
SC0 Fixed beam scintillator - - 4-09 (last meter is patch-cable B-02) 2-0 0    
 
SC1 9mm Veto scintillator CH0 Neg-6 P-12 2-1 1    
Changed:
<
<
SC2 200x300mm plate scintillator LG10 Neg-7 4-09 2-2 2    
>
>
SC2 200x300mm plate scintillator LG10 Neg-7 currently not connected 2-2 2    
 
DWC0 Fixed beam monitor looking downstream - -
DWC0-U       P-01 1-0      
DWC0-D       P-02 1-1      

Revision 372015-09-14 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 64 to 64
 
CH0 Upstream (BCA) Che0 Neg-4 91 2-3 3    
CH1 Downstream (BCB) Che1 Neg-5 P-05 2-4 4    
SC0 Fixed beam scintillator - - P-12 (last meter is patch-cable B-02) 2-0 0    
Changed:
<
<
SC1 9mm Veto scintillator CH0 Neg-6 4-10 2-1 1    
>
>
SC1 9mm Veto scintillator CH0 Neg-6 P-12 2-1 1    
 
SC2 200x300mm plate scintillator LG10 Neg-7 4-09 2-2 2    
DWC0 Fixed beam monitor looking downstream - -
DWC0-U       P-01 1-0      

Revision 362015-09-09 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 61 to 61
 

Cable table

ID Description H/V cable HV PSU port Signal cable TDC channel Scalar channel QDC channel ADC channel
Changed:
<
<
CH0 Upstream (BCA) LG3 Neg-6 91 2-3 3    
CH1 Downstream (BCB) LG0 Neg-5 P-05 2-4 4    
>
>
CH0 Upstream (BCA) Che0 Neg-4 91 2-3 3    
CH1 Downstream (BCB) Che1 Neg-5 P-05 2-4 4    
 
SC0 Fixed beam scintillator - - P-12 (last meter is patch-cable B-02) 2-0 0    
Changed:
<
<
SC1 9mm Veto scintillator LG4 Neg-7 4-10 2-1 1    
SC2 200x300mm plate scintillator LG10 Neg-4 4-09 2-2 2    
>
>
SC1 9mm Veto scintillator CH0 Neg-6 4-10 2-1 1    
SC2 200x300mm plate scintillator LG10 Neg-7 4-09 2-2 2    
 
DWC0 Fixed beam monitor looking downstream - -
DWC0-U       P-01 1-0      
DWC0-D       P-02 1-1      

Revision 352015-09-02 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Changed:
<
<
2.9, 15:40 TB Set BGO HV to 480V - started run 1441205369 Trigger threshold still 500mA
2.9, 15:40 TB Set BGO HV to 550V - started run 1441201195 Trigger threshold still 500mA
2.9, 12:45 TB Set BGO amp back to x100 and taken run 1441190945 BGO trigger threshold increased to 500mA
2.9, 12:30 TB Set BGO amp from x100->x200 and taken run 1441189955 BGO trigger threshold increased to 130mA
>
>
2.9, 19:02 TB BGO HV to 445V - started run 1441213330 Monitoring shows a little gain over 410V
Best range may be ~460-470V
2.9, 15:40 TB Set BGO HV back to 410V - started run 1441212547 Re-checking results obtained in 1441190945
Amplifier at x100, BGO trigger threshold at 500mV
Monitoring looks as before - BGO has rapid turn on from 410V -> 480V
2.9, 15:40 TB Set BGO HV to 480V - started run 1441205369 Trigger threshold still 500mV
2.9, 15:40 TB Set BGO HV to 550V - started run 1441201195 Trigger threshold still 500mV
2.9, 12:45 TB Set BGO amp back to x100 and taken run 1441190945 BGO HV at 410V, trigger threshold increased to 500mV
2.9, 12:30 TB Set BGO amp from x100->x200 and taken run 1441189955 BGO trigger threshold increased to 130mV
 
2.9, 11:43 TB Set BGO amp from x50->x100 and taken run 1441189261  
Changed:
<
<
2.9, 11:43 TB Set BGO amp from x5->x50 and taken run 1441187265 BGO trigger threshold increased to 50mA
>
>
2.9, 11:43 TB Set BGO amp from x5->x50 and taken run 1441187265 BGO trigger threshold increased to 50mV
 
2.9, 11:30 TB Taken run 1441185871 for BGO noise/cosmic data Triggering from BGO edge. BGO signal in ADC_0, attenuated copy in ADC_1
1.9, 18:00 TB, JP Connected up BGO Should take run of BGO pulses for cosmic/noise calibration
1.9, 18:00 TB, JP Covered LG3 to test light leak measured normal pedestal

Revision 342015-09-02 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
2.9, 15:40 TB Set BGO HV to 480V - started run 1441205369 Trigger threshold still 500mA
 
2.9, 15:40 TB Set BGO HV to 550V - started run 1441201195 Trigger threshold still 500mA
2.9, 12:45 TB Set BGO amp back to x100 and taken run 1441190945 BGO trigger threshold increased to 500mA
2.9, 12:30 TB Set BGO amp from x100->x200 and taken run 1441189955 BGO trigger threshold increased to 130mA

Revision 332015-09-02 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
2.9, 15:40 TB Set BGO HV to 550V - started run 1441201195 Trigger threshold still 500mA
 
2.9, 12:45 TB Set BGO amp back to x100 and taken run 1441190945 BGO trigger threshold increased to 500mA
2.9, 12:30 TB Set BGO amp from x100->x200 and taken run 1441189955 BGO trigger threshold increased to 130mA
2.9, 11:43 TB Set BGO amp from x50->x100 and taken run 1441189261  

Revision 322015-09-02 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
2.9, 12:45 TB Set BGO amp back to x100 and taken run 1441190945 BGO trigger threshold increased to 500mA
2.9, 12:30 TB Set BGO amp from x100->x200 and taken run 1441189955 BGO trigger threshold increased to 130mA
2.9, 11:43 TB Set BGO amp from x50->x100 and taken run 1441189261  
2.9, 11:43 TB Set BGO amp from x5->x50 and taken run 1441187265 BGO trigger threshold increased to 50mA
2.9, 11:30 TB Taken run 1441185871 for BGO noise/cosmic data Triggering from BGO edge. BGO signal in ADC_0, attenuated copy in ADC_1
 
1.9, 18:00 TB, JP Connected up BGO Should take run of BGO pulses for cosmic/noise calibration
1.9, 18:00 TB, JP Covered LG3 to test light leak measured normal pedestal
1.9, 18:00 TB, JP Found LG4 connected to faulty patch panel connection (ch0) Switched to high patch panel - normal pedestal values read

Revision 312015-09-01 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
1.9, 18:00 TB, JP Connected up BGO Should take run of BGO pulses for cosmic/noise calibration
1.9, 18:00 TB, JP Covered LG3 to test light leak measured normal pedestal
1.9, 18:00 TB, JP Found LG4 connected to faulty patch panel connection (ch0) Switched to high patch panel - normal pedestal values read
1.9, 18:00 TB, JP Pedestal program for v785 pinned to 16 channels for v785N module Note channel bits offset by 1 to 'plain' v785
1.9, 18:00 TB, JP Covered LG3 to test light leak measured normal pedestal
 
29.8, 21:40 TB Taken runs 1440876475 - 1440877156 with pulser to calibrate DWC1 & 2
29.8, 19:50 TB, JP Taken runs 1440866379 for LG4 and 1440868586 for LG3 Blocks were moved behind veto SC1 in theoretical beam center
LG3 seems to have some activity over the pedestal charge - evident in the 1440866298.ped file
29.8, 15:30 TB, JP Taken run 1440856097 with veto infront of BGO calo

Revision 302015-08-31 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
29.8, 21:40 TB Taken runs 1440876475 - 1440877156 with pulser to calibrate DWC1 & 2
Changed:
<
<
29.8, 19:50 TB, JP Taken runs 1440866379 for LG4 and 1440868586 for LG3 Blocks were moved behind veto SC1 in theoretical beam center
>
>
29.8, 19:50 TB, JP Taken runs 1440866379 for LG4 and 1440868586 for LG3 Blocks were moved behind veto SC1 in theoretical beam center
LG3 seems to have some activity over the pedestal charge - evident in the 1440866298.ped file
 
29.8, 15:30 TB, JP Taken run 1440856097 with veto infront of BGO calo
29.8, 15:20 TB, JP Adjusted beam focus to 4.5m(run 1440853570) - then 7m(run 1440854958) Calo off - no veto scintillator
29.8, 11:00 TB, JP Fixed DWC0 & 1 DWC0-R was disconnected from the fixed descriminator
DWC1-R was attenuated due to a break in the cable (4-08) - borrowed cable 4-10 for now.

Revision 292015-08-31 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
29.8, 21:40 TB Taken runs 1440876475 - 1440877156 with pulser to calibrate DWC1 & 2
29.8, 19:50 TB, JP Taken runs 1440866379 for LG4 and 1440868586 for LG3 Blocks were moved behind veto SC1 in theoretical beam center
29.8, 15:30 TB, JP Taken run 1440856097 with veto infront of BGO calo
29.8, 15:20 TB, JP Adjusted beam focus to 4.5m(run 1440853570) - then 7m(run 1440854958) Calo off - no veto scintillator
29.8, 11:00 TB, JP Fixed DWC0 & 1 DWC0-R was disconnected from the fixed descriminator
DWC1-R was attenuated due to a break in the cable (4-08) - borrowed cable 4-10 for now.
 
28.8, 20:50 TB, JP Taken run 1440783291 Trigger SC0&!SC1&SC2&CH0
28.8, 19:16 TB, JP Taken runs 144078{1966,0173} Trigger SC0&SC2&CH0
28.8, 14:00 TB, JP Received magnet MNP17 Michael Lazzeroni supervised install, Lau Gattinon and Michael Jeckel visited installation later

Revision 282015-08-28 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
28.8, 20:50 TB, JP Taken run 1440783291 Trigger SC0&!SC1&SC2&CH0
28.8, 19:16 TB, JP Taken runs 144078{1966,0173} Trigger SC0&SC2&CH0
28.8, 14:00 TB, JP Received magnet MNP17 Michael Lazzeroni supervised install, Lau Gattinon and Michael Jeckel visited installation later
28.8, 11:00 TB, JP Visited cable service to get 2 more 20m cables Should be complete monday
28.8, 10:00 TB, CD, JP Continued re-cabling detectors after relocation TODO: update cable map
27.9, 16:00 TB, CD, JP Received stands for magnet, re-located DESY table Relocated calorimeters onto DESY table
Started re-cabling towards final configuration
 
27.8, 14:00 TB Measuring detector rates with beam Rates per spill:
SC0 ~22k
SC1 ~20k
SC2 ~13k
CH0
CH1
26.8, 6:30 TB Put DWC2 into gas supply in serial with DWC1
Cabled DWC2 to 'P' loom
Cabled up new discriminators
Need to check timing on new scintillators
26.8, Afternoon TB,JP Switched faulty discriminator for 2 working ones. Debugged problem with timer pulser not triggering discriminator - used another pulser - works

Revision 272015-08-27 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 31 to 31
 
Michael Jeckel 164710 T9 operation
Lau Gatignon 163554 Everything
Andre Henriques 169774 Safety
Changed:
<
<
Michael Lazzaroni 162497 MNP17 magnet
>
>
Michael Lazzaroni 162407 MNP17 magnet
 
Jens Spanggaard 163629 gas components?

Cable table

Revision 262015-08-27 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
27.8, 14:00 TB Measuring detector rates with beam Rates per spill:
SC0 ~22k
SC1 ~20k
SC2 ~13k
CH0
CH1
 
26.8, 6:30 TB Put DWC2 into gas supply in serial with DWC1
Cabled DWC2 to 'P' loom
Cabled up new discriminators
Need to check timing on new scintillators
26.8, Afternoon TB,JP Switched faulty discriminator for 2 working ones. Debugged problem with timer pulser not triggering discriminator - used another pulser - works
25.8, Afternoon TB,JP,MJ Mounted DWC2 in beamline

Revision 252015-08-26 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
26.8, 6:30 TB Put DWC2 into gas supply in serial with DWC1
Cabled DWC2 to 'P' loom
Cabled up new discriminators
Need to check timing on new scintillators
26.8, Afternoon TB,JP Switched faulty discriminator for 2 working ones. Debugged problem with timer pulser not triggering discriminator - used another pulser - works
25.8, Afternoon TB,JP,MJ Mounted DWC2 in beamline
 
24.8, 8:00 TB, JP, PA Taken run 1440436068 with no LGs but all BGO, SC, CH BGO amp at 5x, voltage at 410V
Only CH1 in trigger due to faulty discriminator
24.8, Morning MJ, PA Ran RS232 cable from control room to zone Later, tested communication to controller unit
21.8, 20:00 TB, JP Taken run 1440179961 with V785 (BGO was in the beam)
Line: 30 to 33
 
Michael Lazzaroni 162497 MNP17 magnet
Jens Spanggaard 163629 gas components?
Changed:
<
<

Cable map

DelayWireChamber DWC0

Fixed beam monitor looking downstream
DWC output Cable ID TDC channel
U P-01 1
D P-02 2
L P-03 3
R P-04 4

DelayWireChamber DWC1

Installed looking upstream
DWC output Cable ID TDC channel
U 4-01 5
D 4-02 6
L 4-03 7
R 4-04 8

HV Positive (for DWC1)

Output number Cable ID HV PSU port
0 5 0, POS

BGO

Cable ID signal Cable ID H/V HV PSU port
P-11 8 2, POS

LeadGlassCalorimeter

LG Block number Cable ID signal Cable ID H/V HV PSU port QDC channel
0 4-05 HV6 0, NEG 0 (do not forget to add a delay module)
8 4-06 HV7 1, NEG 1
3 4-07 HV9 2, NEG TBD
4 4-08 HV11 3, NEG TBD

Scintilators

Name of scintillator Description Cable ID signal Cable ID H/V HV PSU port TDC channel Scalar channel
SC0 Fixed beam scintillator P-12 (last meter is patch-cable B-02) T9 PSU n/a 2-0 0
SC1 9mm Veto scintillator 4-10 HV4 7, NEG 2-1 1
SC2 200x300mm plate scintillator 4-09 HV10 4, NEG 2-2 2

Cherenkov

Position Cable ID signal Cable ID H/V HV PSU port TDC channel Scaler channel
Upstream (C0) 91 LG3 6, NEG 2-3 3
Downstream (C1) P-05 LG0 5, NEG 2-4 4

Coincidence units

Logic Scaler channel
SC0+SC2 6
CH0+CH1 7
>
>

Cable table

ID Description H/V cable HV PSU port Signal cable TDC channel Scalar channel QDC channel ADC channel
CH0 Upstream (BCA) LG3 Neg-6 91 2-3 3    
CH1 Downstream (BCB) LG0 Neg-5 P-05 2-4 4    
SC0 Fixed beam scintillator - - P-12 (last meter is patch-cable B-02) 2-0 0    
SC1 9mm Veto scintillator LG4 Neg-7 4-10 2-1 1    
SC2 200x300mm plate scintillator LG10 Neg-4 4-09 2-2 2    
DWC0 Fixed beam monitor looking downstream - -
DWC0-U       P-01 1-0      
DWC0-D       P-02 1-1      
DWC0-L       P-03 1-2      
DWC0-R       P-04 1-3      
DWC1 Installed in front of BGO looking upstream LG5 Pos-0
DWC1-U       4-01 1-4      
DWC1-D       4-02 1-5      
DWC1-L       4-03 1-6      
DWC1-R       4-04 1-7      
DWC2 Installed in front of BGO looking upstream LG1 Pos-1
DWC2-U       P-07 1-8      
DWC2-D       P-08 1-9      
DWC2-L       P-09 1-10      
DWC2-R       P-10 1-11      
BGO On DESY table next to Lead Glass LG8 Pos-2 P-11       0
LG0   LG6 Neg-0 4-05     0  
LG8   LG7 Neg-1 4-06     1  
LG3   LG9 Neg-2 4-07     2  
LG4   LG11 Neg-3 4-08     3  
CoDet SC0+SC2+CoCH       2-5 5
CoCH CH0+CH1       2-6 6
Timer 100us pulser         8
Spill CPS spill signal         9
 

VME Address map

Module Address Address type

Revision 242015-08-25 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 20 to 20
 
17.8, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled
14.8., all day MJ, TB, CD H/W installed in the T9 zone CD: Timepix not working
Added:
>
>

phone numbers

Name Phone Function
Philippe Carriere 162545 Beam instrumentation
Adrian Fabich 160345 PS control (if you need beam...)
Michael Jeckel 164710 T9 operation
Lau Gatignon 163554 Everything
Andre Henriques 169774 Safety
Michael Lazzaroni 162497 MNP17 magnet
Jens Spanggaard 163629 gas components?
 

Cable map

DelayWireChamber DWC0

Fixed beam monitor looking downstream

Revision 232015-08-24 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
24.8, 8:00 TB, JP, PA Taken run 1440436068 with no LGs but all BGO, SC, CH BGO amp at 5x, voltage at 410V
Only CH1 in trigger due to faulty discriminator
24.8, Morning MJ, PA Ran RS232 cable from control room to zone Later, tested communication to controller unit
 
21.8, 20:00 TB, JP Taken run 1440179961 with V785 (BGO was in the beam)
21.8, 17:59 TB, JP Taken run 1440172747 with SC0 + SC3 trigger Same conditions otherwise
21.8, 17:30 TB, JP, PA Set up trigger logic (CH0 + CH1) + SC0 + SC3
Recorded run 1440170076
SC0 signal (TDC0-08) seems missing - may be too early for TDC window

Revision 222015-08-24 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 51 to 51
 
4 4-08 HV11 3, NEG TBD

Scintilators

Changed:
<
<
Name of scintillator Description Cable ID signal Cable ID H/V HV PSU port TDC channel
SC0 Fixed beam scintillator P-12 (last meter is patch-cable B-02) T9 PSU n/a 8
SC2 9mm Veto scintillator 4-10 HV4 7, NEG
SC3 200x300mm plate scintillator 4-09 HV10 4, NEG 9
>
>
Name of scintillator Description Cable ID signal Cable ID H/V HV PSU port TDC channel Scalar channel
SC0 Fixed beam scintillator P-12 (last meter is patch-cable B-02) T9 PSU n/a 2-0 0
SC1 9mm Veto scintillator 4-10 HV4 7, NEG 2-1 1
SC2 200x300mm plate scintillator 4-09 HV10 4, NEG 2-2 2
 

Cherenkov

Position Cable ID signal Cable ID H/V HV PSU port TDC channel Scaler channel
Changed:
<
<
Upstream (C0) 91 LG3 6, NEG 10 2
Downstream (C1) P-05 LG0 5, NEG 11 3
>
>
Upstream (C0) 91 LG3 6, NEG 2-3 3
Downstream (C1) P-05 LG0 5, NEG 2-4 4

Coincidence units

Logic Scaler channel
SC0+SC2 6
CH0+CH1 7
 

VME Address map

Module Address Address type

Revision 212015-08-21 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
21.8, 20:00 TB, JP Taken run 1440179961 with V785 (BGO was in the beam)
 
21.8, 17:59 TB, JP Taken run 1440172747 with SC0 + SC3 trigger Same conditions otherwise
21.8, 17:30 TB, JP, PA Set up trigger logic (CH0 + CH1) + SC0 + SC3
Recorded run 1440170076
SC0 signal (TDC0-08) seems missing - may be too early for TDC window
21.8, 10:52 TB, PA Installed BGO and support crate, veto scintillator

Revision 202015-08-21 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
21.8, 17:59 TB, JP Taken run 1440172747 with SC0 + SC3 trigger Same conditions otherwise
21.8, 17:30 TB, JP, PA Set up trigger logic (CH0 + CH1) + SC0 + SC3
Recorded run 1440170076
SC0 signal (TDC0-08) seems missing - may be too early for TDC window
 
21.8, 10:52 TB, PA Installed BGO and support crate, veto scintillator
20.8, 19:07 MJ, CD Have seen the beam with the D05 TimePix Problems
If pixman creates a png file the file does not contain the raw data
Currently the png file is not created because pixman tries to write /afs/cern.png. We have to discuss this with the experts
20.8, 17:07 TB, JP, PA Recorded run 1440082502 25k events at 3GeV negative beam.
Cherenkov pressures at 2 atm. LG0 in beam center, LG4 disconnected.
Line: 49 to 51
 

Scintilators

Name of scintillator Description Cable ID signal Cable ID H/V HV PSU port TDC channel
Changed:
<
<
SC0 Fixed beam scintillator P-12 (last meter is patch-cable B-02) T9 PSU n/a TBD
>
>
SC0 Fixed beam scintillator P-12 (last meter is patch-cable B-02) T9 PSU n/a 8
 
SC2 9mm Veto scintillator 4-10 HV4 7, NEG
Changed:
<
<
SC3 200x300mm plate scintillator 4-09 HV10 4, NEG TBD
>
>
SC3 200x300mm plate scintillator 4-09 HV10 4, NEG 9
 

Cherenkov

Position Cable ID signal Cable ID H/V HV PSU port TDC channel Scaler channel
Changed:
<
<
Upstream (C0) 91 LG3 6, NEG TBD 2
Downstream (C1) P-05 LG0 5, NEG TBD 3
>
>
Upstream (C0) 91 LG3 6, NEG 10 2
Downstream (C1) P-05 LG0 5, NEG 11 3
 

VME Address map

Module Address Address type

Revision 192015-08-21 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 65 to 65
 
v560 0x800000 A32
v1290 #1 0x4000000 A32
v1290 #2 0x5000000 A32
Added:
>
>
v785 0x6000000 A32
 

-- TimBrooks - 2015-08-17

Revision 182015-08-21 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
21.8, 10:52 TB, PA Installed BGO and support crate, veto scintillator
 
20.8, 19:07 MJ, CD Have seen the beam with the D05 TimePix Problems
If pixman creates a png file the file does not contain the raw data
Currently the png file is not created because pixman tries to write /afs/cern.png. We have to discuss this with the experts
20.8, 17:07 TB, JP, PA Recorded run 1440082502 25k events at 3GeV negative beam.
Cherenkov pressures at 2 atm. LG0 in beam center, LG4 disconnected.
20.8., 14:30 TB, JP Recorded pedestal file 1440073816
Line: 15 to 16
 
14.8., all day MJ, TB, CD H/W installed in the T9 zone CD: Timepix not working

Cable map

Changed:
<
<

DWC0 cables

>
>

DelayWireChamber DWC0

Fixed beam monitor looking downstream
 
DWC output Cable ID TDC channel
U P-01 1
D P-02 2
L P-03 3
R P-04 4
Changed:
<
<

DWC1 cables

>
>

DelayWireChamber DWC1

Installed looking upstream
 
DWC output Cable ID TDC channel
U 4-01 5
D 4-02 6
L 4-03 7
R 4-04 8
Changed:
<
<

HV Positive (for DWC)

Output number Cable ID
0 5
>
>

HV Positive (for DWC1)

Output number Cable ID HV PSU port
0 5 0, POS

BGO

Cable ID signal Cable ID H/V HV PSU port
P-11 8 2, POS
 
Changed:
<
<

LG Signal cables

>
>

LeadGlassCalorimeter

 
LG Block number Cable ID signal Cable ID H/V HV PSU port QDC channel
0 4-05 HV6 0, NEG 0 (do not forget to add a delay module)
8 4-06 HV7 1, NEG 1
Line: 41 to 48
 
4 4-08 HV11 3, NEG TBD

Scintilators

Changed:
<
<
Name of scintillator Cable ID signal Cable ID H/V HV PSU port TDC channel
SC0 P-12 (last meter is patch-cable B-02) T9 PSU n/a TBD
SC3 4-09 HV10 4, NEG TBD
>
>
Name of scintillator Description Cable ID signal Cable ID H/V HV PSU port TDC channel
SC0 Fixed beam scintillator P-12 (last meter is patch-cable B-02) T9 PSU n/a TBD
SC2 9mm Veto scintillator 4-10 HV4 7, NEG
SC3 200x300mm plate scintillator 4-09 HV10 4, NEG TBD
 

Cherenkov

Position Cable ID signal Cable ID H/V HV PSU port TDC channel Scaler channel

Revision 172015-08-20 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
20.8, 19:07 MJ, CD Have seen the beam with the D05 TimePix Problems
If pixman creates a png file the file does not contain the raw data
Currently the png file is not created because pixman tries to write /afs/cern.png. We have to discuss this with the experts
 
20.8, 17:07 TB, JP, PA Recorded run 1440082502 25k events at 3GeV negative beam.
Cherenkov pressures at 2 atm. LG0 in beam center, LG4 disconnected.
20.8., 14:30 TB, JP Recorded pedestal file 1440073816
20.8., 15:00 MJ, CD Add daquser to the sudoers file on pcbl4sleo4g -

Revision 162015-08-20 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
20.8, 17:07 TB, JP, PA Recorded run 1440082502 25k events at 3GeV negative beam.
Cherenkov pressures at 2 atm. LG0 in beam center, LG4 disconnected.
 
20.8., 14:30 TB, JP Recorded pedestal file 1440073816
20.8., 15:00 MJ, CD Add daquser to the sudoers file on pcbl4sleo4g -
19.8., 15:00 MJ, JP The fixed scintillator of T9 (SC0) is now connected to the control room -
Line: 44 to 45
 
SC3 4-09 HV10 4, NEG TBD

Cherenkov

Changed:
<
<
Position Cable ID signal Cable ID H/V HV PSU port TDC channel
Upstream (C0) 91 LG3 6, NEG TBD
Downstream (C1) P-05 LG0 5, NEG TBD
>
>
Position Cable ID signal Cable ID H/V HV PSU port TDC channel Scaler channel
Upstream (C0) 91 LG3 6, NEG TBD 2
Downstream (C1) P-05 LG0 5, NEG TBD 3
 

VME Address map

Changed:
<
<
Module Address
v792 0x0
CORBO 0x700000
v560 0x800000
v1290 0x4000000
>
>
Module Address Address type
v792 0x0 A32
CORBO 0x700000 A24
v560 0x800000 A32
v1290 #1 0x4000000 A32
v1290 #2 0x5000000 A32
  -- TimBrooks - 2015-08-17

Revision 152015-08-20 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
20.8., 14:30 TB, JP Recorded pedestal file 1440073816
20.8., 15:00 MJ, CD Add daquser to the sudoers file on pcbl4sleo4g -
 
19.8., 15:00 MJ, JP The fixed scintillator of T9 (SC0) is now connected to the control room -
Deleted:
<
<
 
18.8., 14:00 MJ V560 installed, VMEbus A32 base address = 0x800000 -
18.8. Morning TB, CD, MJ, JP Cabling control room, testing detectors Cherenkov volumes down to 0.01 bar using vacuum pumps
17.8., 18:00 MJ, CD, TB To be discussed tomorrow with BI expert:
cable routing
Cherenkov set-up
DWC gas connector
DWC signals (why do we see some in the control room?)
Can we use the scintillators next to the first DWC?
Philippe Carriere will:
* Check the meter of the Cherenkov pump
* Provide us with a connector for the DWC gas supply
* He explained that it is normal to get ~10 Hz signal rate on the DWC

Revision 142015-08-19 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
19.8., 15:00 MJ, JP The fixed scintillator of T9 (SC0) is now connected to the control room -
 
18.8., 14:00 MJ V560 installed, VMEbus A32 base address = 0x800000 -
18.8. Morning TB, CD, MJ, JP Cabling control room, testing detectors Cherenkov volumes down to 0.01 bar using vacuum pumps
17.8., 18:00 MJ, CD, TB To be discussed tomorrow with BI expert:
cable routing
Cherenkov set-up
DWC gas connector
DWC signals (why do we see some in the control room?)
Can we use the scintillators next to the first DWC?
Philippe Carriere will:
* Check the meter of the Cherenkov pump
* Provide us with a connector for the DWC gas supply
* He explained that it is normal to get ~10 Hz signal rate on the DWC
Line: 35 to 37
 
3 4-07 HV9 2, NEG TBD
4 4-08 HV11 3, NEG TBD
Changed:
<
<

Scintilator

Cable ID signall Cable ID H/V HV PSU port TDC channel
4-09 HV10 4, NEG TBD
>
>

Scintilators

Name of scintillator Cable ID signal Cable ID H/V HV PSU port TDC channel
SC0 P-12 (last meter is patch-cable B-02) T9 PSU n/a TBD
SC3 4-09 HV10 4, NEG TBD
 

Cherenkov

Position Cable ID signal Cable ID H/V HV PSU port TDC channel
Changed:
<
<
Upstream TBD HV0 5, NEG TBD
Downstream P-05 HV3 6, NEG TBD
>
>
Upstream (C0) 91 LG3 6, NEG TBD
Downstream (C1) P-05 LG0 5, NEG TBD
 

VME Address map

Module Address

Revision 132015-08-18 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 46 to 46
 

VME Address map

Module Address
Added:
>
>
v792 0x0
 
CORBO 0x700000
Added:
>
>
v560 0x800000
v1290 0x4000000
  -- TimBrooks - 2015-08-17 \ No newline at end of file

Revision 122015-08-18 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 44 to 44
 
Upstream TBD HV0 5, NEG TBD
Downstream P-05 HV3 6, NEG TBD
Added:
>
>

VME Address map

Module Address
CORBO 0x700000
  -- TimBrooks - 2015-08-17 \ No newline at end of file

Revision 112015-08-18 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Changed:
<
<
2015-08-18 Morning TB, CD, MJ, JP Cabling control room, testing detectors Cherenkov volumes down to 0.01 bar using vacuum pumps
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with BI expert:
cable routing
Cherenkov set-up
DWC gas connector
DWC signals (why do we see some in the control room?)
Can we use the scintillators next to the first DWC?
Philippe Carriere will:
* Check the meter of the Cherenkov pump
* Provide us with a connector for the DWC gas supply
* He explained that it is normal to get ~10 Hz signal rate on the DWC
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with Adrian:
What equipment can stay in T9 & counting room during SHIP?
Installation of MNP17 magnet,
how do we control the magnet?
-
17.9, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled
14.9., all day MJ, TB, CD H/W installed in the T9 zone CD: Timepix not working
>
>
18.8., 14:00 MJ V560 installed, VMEbus A32 base address = 0x800000 -
18.8. Morning TB, CD, MJ, JP Cabling control room, testing detectors Cherenkov volumes down to 0.01 bar using vacuum pumps
17.8., 18:00 MJ, CD, TB To be discussed tomorrow with BI expert:
cable routing
Cherenkov set-up
DWC gas connector
DWC signals (why do we see some in the control room?)
Can we use the scintillators next to the first DWC?
Philippe Carriere will:
* Check the meter of the Cherenkov pump
* Provide us with a connector for the DWC gas supply
* He explained that it is normal to get ~10 Hz signal rate on the DWC
17.8., 18:00 MJ, CD, TB To be discussed tomorrow with Adrian:
What equipment can stay in T9 & counting room during SHIP?
Installation of MNP17 magnet,
how do we control the magnet?
-
17.8, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled
14.8., all day MJ, TB, CD H/W installed in the T9 zone CD: Timepix not working
 

Cable map

DWC0 cables

Revision 102015-08-18 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 9 to 9
 
14.9., all day MJ, TB, CD H/W installed in the T9 zone CD: Timepix not working

Cable map

Changed:
<
<

DWC1 Signal cables

>
>

DWC0 cables

 
DWC output Cable ID TDC channel
Changed:
<
<
U 4-01
D 4-02
L 4-03
R 4-04
>
>
U P-01 1
D P-02 2
L P-03 3
R P-04 4

DWC1 cables

DWC output Cable ID TDC channel
U 4-01 5
D 4-02 6
L 4-03 7
R 4-04 8
 

HV Positive (for DWC)

Output number Cable ID
Line: 22 to 29
 

LG Signal cables

LG Block number Cable ID signal Cable ID H/V HV PSU port QDC channel
Changed:
<
<
0 4-05 HV6 0, NEG TBD (do not forget to add a delay module)
8 4-06 HV7 1, NEG TBD
>
>
0 4-05 HV6 0, NEG 0 (do not forget to add a delay module)
8 4-06 HV7 1, NEG 1
 
3 4-07 HV9 2, NEG TBD
4 4-08 HV11 3, NEG TBD

Revision 92015-08-18 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Changed:
<
<
2015-08-18 Morning TB, CD, MJ, JP Cabling control room, testing detectors  
>
>
2015-08-18 Morning TB, CD, MJ, JP Cabling control room, testing detectors Cherenkov volumes down to 0.01 bar using vacuum pumps
 
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with BI expert:
cable routing
Cherenkov set-up
DWC gas connector
DWC signals (why do we see some in the control room?)
Can we use the scintillators next to the first DWC?
Philippe Carriere will:
* Check the meter of the Cherenkov pump
* Provide us with a connector for the DWC gas supply
* He explained that it is normal to get ~10 Hz signal rate on the DWC
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with Adrian:
What equipment can stay in T9 & counting room during SHIP?
Installation of MNP17 magnet,
how do we control the magnet?
-
17.9, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled

Revision 82015-08-18 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
2015-08-18 Morning TB, CD, MJ, JP Cabling control room, testing detectors  
 
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with BI expert:
cable routing
Cherenkov set-up
DWC gas connector
DWC signals (why do we see some in the control room?)
Can we use the scintillators next to the first DWC?
Philippe Carriere will:
* Check the meter of the Cherenkov pump
* Provide us with a connector for the DWC gas supply
* He explained that it is normal to get ~10 Hz signal rate on the DWC
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with Adrian:
What equipment can stay in T9 & counting room during SHIP?
Installation of MNP17 magnet,
how do we control the magnet?
-
17.9, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled

Revision 72015-08-18 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Changed:
<
<
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with BI expert:
cable routing
Cherenkov set-up
DWC gas connector
DWC signals (why do we see some in the control room?)
Can we use the scintillators next to the first DWC?
-
>
>
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with BI expert:
cable routing
Cherenkov set-up
DWC gas connector
DWC signals (why do we see some in the control room?)
Can we use the scintillators next to the first DWC?
Philippe Carriere will:
* Check the meter of the Cherenkov pump
* Provide us with a connector for the DWC gas supply
* He explained that it is normal to get ~10 Hz signal rate on the DWC
 
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with Adrian:
What equipment can stay in T9 & counting room during SHIP?
Installation of MNP17 magnet,
how do we control the magnet?
-
17.9, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled
14.9., all day MJ, TB, CD H/W installed in the T9 zone CD: Timepix not working

Revision 62015-08-18 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Line: 33 to 33
 

Cherenkov

Position Cable ID signal Cable ID H/V HV PSU port TDC channel
Upstream TBD HV0 5, NEG TBD
Changed:
<
<
Downstream TBD HV3 6, NEG TBD
>
>
Downstream P-05 HV3 6, NEG TBD
 

-- TimBrooks - 2015-08-17

Revision 52015-08-17 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Log

Date and time Initials Description Remarks
Added:
>
>
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with BI expert:
cable routing
Cherenkov set-up
DWC gas connector
DWC signals (why do we see some in the control room?)
Can we use the scintillators next to the first DWC?
-
17.9., 18:00 MJ, CD, TB To be discussed tomorrow with Adrian:
What equipment can stay in T9 & counting room during SHIP?
Installation of MNP17 magnet,
how do we control the magnet?
-
 
17.9, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled
14.9., all day MJ, TB, CD H/W installed in the T9 zone CD: Timepix not working
Line: 13 to 15
 
L 4-03
R 4-04
Changed:
<
<

LG Signal cables

LG Block number Cable ID QDC channel
0 4-05 HV6
8 4-06 HV7
3 4-07 HV9
4 4-08 HV11

HV Positive

>
>

HV Positive (for DWC)

 
Output number Cable ID
0 5
Changed:
<
<

HV Negative

Output number Cable ID
0 6
1 7
2 9
3 11
>
>

LG Signal cables

LG Block number Cable ID signal Cable ID H/V HV PSU port QDC channel
0 4-05 HV6 0, NEG TBD (do not forget to add a delay module)
8 4-06 HV7 1, NEG TBD
3 4-07 HV9 2, NEG TBD
4 4-08 HV11 3, NEG TBD

Scintilator

Cable ID signall Cable ID H/V HV PSU port TDC channel
4-09 HV10 4, NEG TBD

Cherenkov

Position Cable ID signal Cable ID H/V HV PSU port TDC channel
Upstream TBD HV0 5, NEG TBD
Downstream TBD HV3 6, NEG TBD
  -- TimBrooks - 2015-08-17

Revision 42015-08-17 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
Changed:
<
<
= Log =
>
>

Log

 
Date and time Initials Description Remarks
17.9, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled
14.9., all day MJ, TB, CD H/W installed in the T9 zone CD: Timepix not working

Revision 32015-08-17 - TimBrooks

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
= Log =
Date and time Initials Description Remarks
17.9, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled
Changed:
<
<
14.9., all day MJ, TB, CD H/WE installed in the T9 zone CD: Timepix not working
>
>
14.9., all day MJ, TB, CD H/W installed in the T9 zone CD: Timepix not working
 
Changed:
<
<
= Cable map = DWC1
>
>

Cable map

DWC1 Signal cables

DWC output Cable ID TDC channel
 
U 4-01
D 4-02
L 4-03
R 4-04
Changed:
<
<
LG
>
>

LG Signal cables

LG Block number Cable ID QDC channel
 
0 4-05 HV6
8 4-06 HV7
3 4-07 HV9
4 4-08 HV11
Changed:
<
<
HV P
>
>

HV Positive

Output number Cable ID
 
0 5
Changed:
<
<
HV N
>
>

HV Negative

Output number Cable ID
 
0 6
1 7
2 9

Revision 22015-08-17 - MarkusJoos

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
= Log =
Changed:
<
<
2015-08-17 Installation
>
>
Date and time Initials Description Remarks
17.9, 14:00 TB Installation continued See below how HV (Cable map) and signal are cabled
14.9., all day MJ, TB, CD H/WE installed in the T9 zone CD: Timepix not working
  = Cable map = DWC1

Revision 12015-08-17 - TimBrooks

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"
= Log =
2015-08-17 Installation

= Cable map = DWC1

U 4-01
D 4-02
L 4-03
R 4-04

LG

0 4-05 HV6
8 4-06 HV7
3 4-07 HV9
4 4-08 HV11

HV P

0 5

HV N

0 6
1 7
2 9
3 11

-- TimBrooks - 2015-08-17

 