Difference: FramesInfrastructure (5 vs. 6)

Revision 62018-06-04 - BlakeLeverington

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Frames and Infrastructure

Line: 31 to 31
 
    • 6 cooling blocks for vertical modules mounted on top mounting plate.
    • 6 cooling blocks for tilted modules mounted on top mounting plate.
Deleted:
<
<

Status Board (last update 16/02/2017)

C-frame mechanics rails/carriages Novec lines water cooling cables integration other
CERN: FEM calculations Test bed assembled, adapt to new I-beams Rob? CERN: new cooling block design. Problem mismatch of pitch with novec manifold, Cl.Fd: work towards exp. verification of Cu cooling blocks Ard ? HD: prepare complete model. Expect from CERN absolute coordinates model of beam pipe, bridge and platform ...

Design specifications for the Readout Box

Issues

 

Contributing institutes

  • Heidelberg
Line: 54 to 39
 
  • Tomsk
  • Nikhef
Deleted:
<
<

Next milestones and reviews

Presentations

 -- ChristianJoram - 18 Sep 2014 \ No newline at end of file
 