META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 362 to 362
 
META FILEATTACHMENT attachment="TriggerLabels.xls" attr="" comment="List of ethernet L0Calo trigger cables" date="1185802456" name="TriggerLabels.xls" path="TriggerLabels.xls" size="419328" stream="TriggerLabels.xls" user="Main.PatrickRobbe" version="1"
META FILEATTACHMENT attachment="cabling_ECAL2PS.xls" attr="" comment="" date="1204133081" name="cabling_ECAL2PS.xls" path="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_ECAL2PS.xls" size="71680" stream="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_ECAL2PS.xls" user="Main.EricConte" version="2"
META FILEATTACHMENT attachment="cabling_PS2PS.xls" attr="" comment="" date="1203967468" name="cabling_PS2PS.xls" path="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_PS2PS.xls" size="45568" stream="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_PS2PS.xls" user="Main.EricConte" version="1"
Added:
>
>
META FILEATTACHMENT attachment="backplane6u_proto1.pdf" attr="" comment="" date="1233756968" name="backplane6u_proto1.pdf" path="backplane6u_proto1.pdf" size="3309105" stream="backplane6u_proto1.pdf" user="Main.PatrickRobbe" version="1"

Revision 482008-04-29 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 48 to 48
 
ECAL18 ECAL17 DONE 11 Feb 2008 OK
ECAL18 ECAL18 DONE 11 Feb 2008 OK
ECAL21 ECAL20 DONE 12 Feb 2008 OK
Changed:
<
<
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 20/10/0->19/12/2 (4CCLALTS100412)
>
>
ECAL20 ECAL19 DONE 12 Feb 2008 OK (Cable 4CCLALTS100412 replaced by new cable)
 
ECAL19 ECAL19 DONE 12 Feb 2008 OK
HCAL24 HCAL24 DONE 21 Feb 2008 OK
HCAL25 HCAL25 DONE 21 Feb 2008 OK (4CCLALTS100751 replugged at the correct place)

Revision 472008-04-28 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 48 to 48
 
ECAL18 ECAL17 DONE 11 Feb 2008 OK
ECAL18 ECAL18 DONE 11 Feb 2008 OK
ECAL21 ECAL20 DONE 12 Feb 2008 OK
Changed:
<
<
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 20/10/1->19/12/3 (4CCLALTS100413) [problem located in emitting board, connector 1] and 20/13/0 -> 19/15/2 (4CCLALTS100406) [problem located in receiving board, connector 2]
>
>
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 20/10/0->19/12/2 (4CCLALTS100412)
 
ECAL19 ECAL19 DONE 12 Feb 2008 OK
HCAL24 HCAL24 DONE 21 Feb 2008 OK
HCAL25 HCAL25 DONE 21 Feb 2008 OK (4CCLALTS100751 replugged at the correct place)

Revision 462008-03-24 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 266 to 266
 
Changed:
<
<
Time alignment of the Trigger path:
>
>
Internal Time alignment of the Trigger path:

Crate Board FEPGA PIPELINE - PS SPD LOLAT TRIGPGA PS/SPD TALAT TRIGPGA TOP TALAT TRIGPGA RIGHT TALAT
PRS2 ALL += 2 3 0 1
PRS3 ALL += 2 3 0 1
PRS4 ALL += 2 3 0 1
PRS5 ALL += 2 3 0 1
PRS6 FEB04 +=1 4 1 2
PRS6 FEB05 +=1 4 0 2
PRS6 FEB06 +=1 4 1 2
PRS6 FEB07 +=1 4 0 2
PRS6 FEB08 +=1 4 0 1
PRS6 FEB09 +=2 3 0 2
PRS6 FEB10 +=1 4 0 1
PRS6 FEB11 +=2 3 0 0
PRS7 FEB01 +=1 4 1 2
PRS7 FEB02 +=1 4 0 2
PRS7 FEB03 +=1 4 0 2
PRS7 FEB04 +=1 4 0 2
PRS7 FEB05 +=1 4 0 2
PRS7 FEB06 +=1 4 0 2
PRS7 FEB07 +=1 4 0 0
PRS7 FEB08 +=1 4 0 1
PRS7 FEB09 +=2 3 0 1
PRS7 FEB10 +=2 3 0 0
PRS7 FEB11 +=3 2 0 1
PRS7 FEB12 +=2 3 0 1
PRS7 FEB13 +=2 3 0 1
PRS7 FEB14 +=2 3 0 0

Remaining : PRS0 & PRS1

Time alignment of the Trigger path {PRS/SPD - ECAL} :

 

Work in progress ...

Revision 452008-03-13 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 48 to 48
 
ECAL18 ECAL17 DONE 11 Feb 2008 OK
ECAL18 ECAL18 DONE 11 Feb 2008 OK
ECAL21 ECAL20 DONE 12 Feb 2008 OK
Changed:
<
<
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100406
>
>
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 20/10/1->19/12/3 (4CCLALTS100413) [problem located in emitting board, connector 1] and 20/13/0 -> 19/15/2 (4CCLALTS100406) [problem located in receiving board, connector 2]
 
ECAL19 ECAL19 DONE 12 Feb 2008 OK
HCAL24 HCAL24 DONE 21 Feb 2008 OK
HCAL25 HCAL25 DONE 21 Feb 2008 OK (4CCLALTS100751 replugged at the correct place)

Revision 442008-03-12 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 49 to 49
 
ECAL18 ECAL18 DONE 11 Feb 2008 OK
ECAL21 ECAL20 DONE 12 Feb 2008 OK
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100406
Changed:
<
<
ECAL19 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100498
>
>
ECAL19 ECAL19 DONE 12 Feb 2008 OK
 
HCAL24 HCAL24 DONE 21 Feb 2008 OK
HCAL25 HCAL25 DONE 21 Feb 2008 OK (4CCLALTS100751 replugged at the correct place)
PRS0 PRS0 DONE 21 Feb 2008 OK

Revision 432008-03-11 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 236 to 236
 
HCAL23 1
HCAL23 7
HCAL23 12
Added:
>
>
HCAL24 1
HCAL24 14
 

PS/SPD Front-End Board

Revision 422008-02-27 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 32 to 32
 
HCAL23 ECAL12 DONE 24 Oct 2007 OK
HCAL23 ECAL13 DONE 24 Oct 2007 OK
HCAL23 ECAL14 DONE 24 Oct 2007 OK
Changed:
<
<
PRS3 ECAL14 DONE 19 Dec 2007 OK (fixed error in the cabling of the cable 301)
>
>
PRS3 ECAL14 DONE 19 Dec 2007 OK (4CCLALTS100301 replugged at the correct place)
 
PRS0 PRS0 DONE 29 Jan 2008 OK
Changed:
<
<
PRS1 PRS1 30 Jan 2008 a backplane RJ45 connector is disabled (cable 326)
>
>
PRS1 PRS1 30 Jan 2008 a backplane RJ45 connector is disabled (cable 4CCLALTS100326)
 
PRS2 PRS2 DONE 29 Jan 2008 OK
PRS3 PRS3 DONE 29 Jan 2008 OK
PRS1 PRS0 DONE 30 Jan 2008 OK (TTCrq clock issue fixed)
Line: 58 to 58
 
PRS7 PRS7 DONE 21 Feb 2008 OK
PRS4 PRS4 DONE 22 Feb 2008 OK
PRS5 PRS5 DONE 22 Feb 2008 OK
Changed:
<
<
ECAL19 PRS6 DONE 20 Feb 2008 faulty FEB 102 (cable 556) & cable 571 to replace
>
>
ECAL19 PRS6 DONE 20 Feb 2008 faulty FEB 102 replaced by FEB 029, cable 4CCLALTS100571 to replace
 
PRS6 ECAL19 DONE 21 Feb 2008 OK
PRS7 ECAL20 DONE 21 Feb 2008 OK
PRS7 ECAL21 DONE 21 Feb 2008 OK
Line: 79 to 79
 
ECAL14 PRS3 DONE 24 Feb 2008 OK
ECAL15 PRS4 DONE 24 Feb 2008 OK
ECAL16 PRS4 DONE 24 Feb 2008 OK
Changed:
<
<
ECAL17 PRS5 DONE 25 Feb 2008 cable 580 & 581 ?
>
>
ECAL17 PRS5 DONE 25 Feb 2008 OK (4CCLALTS100580 & 4CCLALTS100581 replugged at the correct place)
 
ECAL18 PRS5 DONE 25 Feb 2008 OK
Added:
>
>
ECAL13 PRS3 DONE 28 Feb 2008 OK
PRS3 ECAL13 DONE 28 Feb 2008 OK
 

Optical Cables

Line: 247 to 249
 Crate synchronisation :
Changed:
<
<
CROC boards allow to align in time the clocks (and the calibration signals) of the diffrents crates by two options : "fine delay" option (phase shift from 0 to 23,9ns) and "coarse delay" (latency from 0 to 16 clock cycles). For each CROC board, "Fine delay" option has been set for synchronising clocks (channel A) and synchronising L0 trigger signal (channel B). No difference in clock cycles has been observed.
>
>
CROC boards allow to align in time the clocks (and the calibration signals) of the different crates by two options : "fine delay" option (phase shift from 0 to 23,9ns) and "coarse delay" (latency from 0 to 16 clock cycles). For each CROC board, "Fine delay" option has been set for synchronising clocks (channel A) and synchronising L0 trigger signals (channel B). No difference in clock cycles has been observed.
 
Crate "Fine delay" value Comment
PRS7 value = 30 the reference
Line: 323 to 325
 
META FILEATTACHMENT attachment="D3B01.jpg" attr="" comment="Picture of D3B01 rack" date="1185805081" name="D3B01.jpg" path="D3B01.jpg" size="72264" stream="D3B01.jpg" user="Main.PatrickRobbe" version="4"
META FILEATTACHMENT attachment="OpticalTriggerL0CaloCables-Children.xls" attr="" comment="List of L0Calo optical cables in the barrack and connections in the patch panel" date="1185802810" name="OpticalTriggerL0CaloCables-Children.xls" path="OpticalTriggerL0CaloCables-Children.xls" size="246272" stream="OpticalTriggerL0CaloCables-Children.xls" user="Main.PatrickRobbe" version="1"
META FILEATTACHMENT attachment="TriggerLabels.xls" attr="" comment="List of ethernet L0Calo trigger cables" date="1185802456" name="TriggerLabels.xls" path="TriggerLabels.xls" size="419328" stream="TriggerLabels.xls" user="Main.PatrickRobbe" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="cabling_ECAL2PS.xls" attr="" comment="" date="1203967310" name="cabling_ECAL2PS.xls" path="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_ECAL2PS.xls" size="71680" stream="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_ECAL2PS.xls" user="Main.EricConte" version="1"
>
>
META FILEATTACHMENT attachment="cabling_ECAL2PS.xls" attr="" comment="" date="1204133081" name="cabling_ECAL2PS.xls" path="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_ECAL2PS.xls" size="71680" stream="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_ECAL2PS.xls" user="Main.EricConte" version="2"
 
META FILEATTACHMENT attachment="cabling_PS2PS.xls" attr="" comment="" date="1203967468" name="cabling_PS2PS.xls" path="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_PS2PS.xls" size="45568" stream="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_PS2PS.xls" user="Main.EricConte" version="1"

Revision 412008-02-27 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 244 to 244
 
  • ECAL address inputs : the allowed phase ranges, for both C-side and A-side, can be found here: cabling_ECAL2PS.xls.
  • PS/SPD - TVB link : the phase ranges allowed for inputs of the TVB can be found in TVB section.
Added:
>
>
Crate synchronisation :

CROC boards allow to align in time the clocks (and the calibration signals) of the diffrents crates by two options : "fine delay" option (phase shift from 0 to 23,9ns) and "coarse delay" (latency from 0 to 16 clock cycles). For each CROC board, "Fine delay" option has been set for synchronising clocks (channel A) and synchronising L0 trigger signal (channel B). No difference in clock cycles has been observed.

Crate "Fine delay" value Comment
PRS7 value = 30 the reference
PRS6 value = 35  
PRS5 value = 20  
PRS4 value = 30  
PRS0 value = 30 CROC "ClkFeb" output is disabled. So "ClkDiv" output has been used.
PRS1 value = ? all CROC outputs are disabled
PRS2 value = 55  
PRS3 value = 45  

 Time alignment of the Trigger path:

Revision 402008-02-25 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 32 to 32
 
HCAL23 ECAL12 DONE 24 Oct 2007 OK
HCAL23 ECAL13 DONE 24 Oct 2007 OK
HCAL23 ECAL14 DONE 24 Oct 2007 OK
Changed:
<
<
PRS3 ECAL14 DONE 19 Dec 2007 OK
>
>
PRS3 ECAL14 DONE 19 Dec 2007 OK (fixed error in the cabling of the cable 301)
 
PRS0 PRS0 DONE 29 Jan 2008 OK
Changed:
<
<
PRS1 PRS1 30 Jan 2008 a backplane RJ45 connector is disabled.
>
>
PRS1 PRS1 30 Jan 2008 a backplane RJ45 connector is disabled (cable 326)
 
PRS2 PRS2 DONE 29 Jan 2008 OK
PRS3 PRS3 DONE 29 Jan 2008 OK
Changed:
<
<
PRS1 PRS0 30 Jan 2008 phase problems to settle for some boards.
>
>
PRS1 PRS0 DONE 30 Jan 2008 OK (TTCrq clock issue fixed)
 
PRS2 ECAL11 DONE 31 Jan 2008 OK
PRS2 ECAL12 DONE 01 Feb 2008 OK
ECAL15 ECAL16 DONE 11 Feb 2008 OK
Line: 52 to 52
 
ECAL19 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100498
HCAL24 HCAL24 DONE 21 Feb 2008 OK
HCAL25 HCAL25 DONE 21 Feb 2008 OK (4CCLALTS100751 replugged at the correct place)
Added:
>
>
PRS0 PRS0 DONE 21 Feb 2008 OK
PRS6 PRS6 DONE 21 Feb 2008 OK
PRS7 PRS6 DONE 21 Feb 2008 OK
PRS7 PRS7 DONE 21 Feb 2008 OK
PRS4 PRS4 DONE 22 Feb 2008 OK
PRS5 PRS5 DONE 22 Feb 2008 OK
ECAL19 PRS6 DONE 20 Feb 2008 faulty FEB 102 (cable 556) & cable 571 to replace
PRS6 ECAL19 DONE 21 Feb 2008 OK
PRS7 ECAL20 DONE 21 Feb 2008 OK
PRS7 ECAL21 DONE 21 Feb 2008 OK
PRS0 ECAL8 DONE 21 Feb 2008 OK
PRS0 ECAL9 DONE 21 Feb 2008 OK
ECAL20 PRS7 DONE 21 Feb 2008 OK
ECAL21 PRS7 DONE 21 Feb 2008 OK
ECAL8 PRS0 DONE 21 Feb 2008 OK
ECAL9 PRS0 DONE 21 Feb 2008 OK
ECAL10 PRS1 DONE 22 Feb 2008 OK
PRS1 ECAL10 DONE 22 Feb 2008 OK
PRS4 ECAL15 DONE 22 Feb 2008 OK
PRS4 ECAL16 DONE 22 Feb 2008 OK
PRS5 ECAL17 DONE 22 Feb 2008 OK
PRS5 ECAL18 DONE 22 Feb 2008 OK
ECAL11 PRS2 DONE 23 Feb 2008 OK
ECAL12 PRS2 DONE 23 Feb 2008 OK
ECAL14 PRS3 DONE 24 Feb 2008 OK
ECAL15 PRS4 DONE 24 Feb 2008 OK
ECAL16 PRS4 DONE 24 Feb 2008 OK
ECAL17 PRS5 DONE 25 Feb 2008 cable 580 & 581 ?
ECAL18 PRS5 DONE 25 Feb 2008 OK
 

Optical Cables

Line: 208 to 237
 

PS/SPD Front-End Board

Changed:
<
<
  • PS/SPD TOP neighbours exchange : the allowed phase ranges (for C-side) can be found here: PSneighbours.xls.
  • PS/SPD - Validation link : the cable test is in progress.
  • ECAL - PS/SPD : in progress.

Sum up of the cabling test progression :

PS/SPD crate PS/SPD neighbour cable ECAL LEFT address cable ECAL RIGHT address cable TVB LEFT pattern cable TVB RIGHT pattern cable
PRS 0 DONE DONE DONE DONE DONE
PRS 1 DONE DONE DONE DONE DONE
PRS 2 DONE DONE DONE DONE DONE
PRS 3 DONE ECAL13 to test ECAL13 to test ECAL13 to test ECAL13 to test
PRS 4 DONE DONE DONE DONE DONE
PRS 5 DONE     DONE DONE
PRS 6 DONE cable 558 disable cable 571 disable DONE DONE
PRS 7 DONE DONE DONE DONE DONE
>
>
Trigger Cables test :
 
Added:
>
>
  • PS/SPD TOP neighbours input : the allowed phase ranges, for both C-side and A-side, can be found here: cabling_PS2PS.xls.
  • ECAL address inputs : the allowed phase ranges, for both C-side and A-side, can be found here: cabling_ECAL2PS.xls.
  • PS/SPD - TVB link : the phase ranges allowed for inputs of the TVB can be found in TVB section.

Time alignment of the Trigger path:


Work in progress ...

 

Validation Board

Validation board installed on cryo side
Line: 281 to 305
 
META FILEATTACHMENT attachment="D3B01.jpg" attr="" comment="Picture of D3B01 rack" date="1185805081" name="D3B01.jpg" path="D3B01.jpg" size="72264" stream="D3B01.jpg" user="Main.PatrickRobbe" version="4"
META FILEATTACHMENT attachment="OpticalTriggerL0CaloCables-Children.xls" attr="" comment="List of L0Calo optical cables in the barrack and connections in the patch panel" date="1185802810" name="OpticalTriggerL0CaloCables-Children.xls" path="OpticalTriggerL0CaloCables-Children.xls" size="246272" stream="OpticalTriggerL0CaloCables-Children.xls" user="Main.PatrickRobbe" version="1"
META FILEATTACHMENT attachment="TriggerLabels.xls" attr="" comment="List of ethernet L0Calo trigger cables" date="1185802456" name="TriggerLabels.xls" path="TriggerLabels.xls" size="419328" stream="TriggerLabels.xls" user="Main.PatrickRobbe" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="PSneighbours.xls" attr="" comment="" date="1201801368" name="PSneighbours.xls" path="C:\Documents and Settings\lhcb\Bureau\Docs\PSneighbours.xls" size="30720" stream="C:\Documents and Settings\lhcb\Bureau\Docs\PSneighbours.xls" user="Main.EricConte" version="1"
>
>
META FILEATTACHMENT attachment="cabling_ECAL2PS.xls" attr="" comment="" date="1203967310" name="cabling_ECAL2PS.xls" path="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_ECAL2PS.xls" size="71680" stream="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_ECAL2PS.xls" user="Main.EricConte" version="1"
META FILEATTACHMENT attachment="cabling_PS2PS.xls" attr="" comment="" date="1203967468" name="cabling_PS2PS.xls" path="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_PS2PS.xls" size="45568" stream="C:\Documents and Settings\econte\Bureau\PRESHOWER DOCUMENTS\Phaser\cabling_PS2PS.xls" user="Main.EricConte" version="1"

Revision 392008-02-24 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 219 to 219
 
PRS 1 DONE DONE DONE DONE DONE
PRS 2 DONE DONE DONE DONE DONE
PRS 3 DONE ECAL13 to test ECAL13 to test ECAL13 to test ECAL13 to test
Changed:
<
<
PRS 4 DONE     DONE DONE
>
>
PRS 4 DONE DONE DONE DONE DONE
 
PRS 5 DONE     DONE DONE
PRS 6 DONE cable 558 disable cable 571 disable DONE DONE
PRS 7 DONE DONE DONE DONE DONE

Revision 382008-02-24 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 217 to 217
 
PS/SPD crate PS/SPD neighbour cable ECAL LEFT address cable ECAL RIGHT address cable TVB LEFT pattern cable TVB RIGHT pattern cable
PRS 0 DONE DONE DONE DONE DONE
PRS 1 DONE DONE DONE DONE DONE
Changed:
<
<
PRS 2 DONE     DONE DONE
PRS 3 DONE     ECAL13 to test ECAL13 to test
>
>
PRS 2 DONE DONE DONE DONE DONE
PRS 3 DONE ECAL13 to test ECAL13 to test ECAL13 to test ECAL13 to test
 
PRS 4 DONE     DONE DONE
PRS 5 DONE     DONE DONE
PRS 6 DONE cable 558 disable cable 571 disable DONE DONE

Revision 372008-02-22 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 219 to 219
 
PRS 1 DONE DONE DONE DONE DONE
PRS 2 DONE     DONE DONE
PRS 3 DONE     ECAL13 to test ECAL13 to test
Changed:
<
<
PRS 4       DONE DONE
PRS 5       DONE DONE
PRS 6 DONE 1 disable cable 1 disable cable DONE DONE
>
>
PRS 4 DONE     DONE DONE
PRS 5 DONE     DONE DONE
PRS 6 DONE cable 558 disable cable 571 disable DONE DONE
 
PRS 7 DONE DONE DONE DONE DONE

Revision 362008-02-22 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 216 to 216
 
PS/SPD crate PS/SPD neighbour cable ECAL LEFT address cable ECAL RIGHT address cable TVB LEFT pattern cable TVB RIGHT pattern cable
PRS 0 DONE DONE DONE DONE DONE
Changed:
<
<
PRS 1 DONE        
PRS 2 DONE        
PRS 3 DONE        
>
>
PRS 1 DONE DONE DONE DONE DONE
PRS 2 DONE     DONE DONE
PRS 3 DONE     ECAL13 to test ECAL13 to test
 
PRS 4       DONE DONE
PRS 5       DONE DONE
PRS 6 DONE 1 disable cable 1 disable cable DONE DONE

Revision 352008-02-21 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 47 to 47
 
ECAL17 ECAL18 DONE 11 Feb 2008 OK
ECAL18 ECAL17 DONE 11 Feb 2008 OK
ECAL18 ECAL18 DONE 11 Feb 2008 OK
Changed:
<
<
ECAL21 ECAL20 DONE 12 Feb 2008  
>
>
ECAL21 ECAL20 DONE 12 Feb 2008 OK
 
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100406
ECAL19 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100498
HCAL24 HCAL24 DONE 21 Feb 2008 OK

Revision 342008-02-21 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 215 to 215
 Sum up of the cabling test progression :

PS/SPD crate PS/SPD neighbour cable ECAL LEFT address cable ECAL RIGHT address cable TVB LEFT pattern cable TVB RIGHT pattern cable
Changed:
<
<
PRS 0 Problem with Long cable DONE DONE DONE DONE
>
>
PRS 0 DONE DONE DONE DONE DONE
 
PRS 1 DONE        
PRS 2 DONE        
PRS 3 DONE        
PRS 4       DONE DONE
PRS 5       DONE DONE
Changed:
<
<
PRS 6 DONE     DONE DONE
PRS 7 DONE     DONE DONE
>
>
PRS 6 DONE 1 disable cable 1 disable cable DONE DONE
PRS 7 DONE DONE DONE DONE DONE
 

Validation Board

Revision 332008-02-21 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 50 to 50
 
ECAL21 ECAL20 DONE 12 Feb 2008  
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100406
ECAL19 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100498
Changed:
<
<
HCAL25 HCAL25 12 Feb 2008 Pb with 4CCLALTS100751
>
>
HCAL24 HCAL24 DONE 21 Feb 2008 OK
HCAL25 HCAL25 DONE 21 Feb 2008 OK (4CCLALTS100751 replugged at the correct place)
 

Optical Cables

Test of cables:

Deleted:
<
<
From To Tested Comments
ECAL10.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL10.1 TCASBELE   Redo test
ECAL9.0 TCASBELE   Redo test
ECAL9.1 TCASBELE   Redo test
ECAL8.0 TCASBELE   Redo test
ECAL8.1 TCASBELE   Redo test
ECAL11.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL11.1 TCASBELE DONE 15 Dec 2007 OK BER
ECAL12.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL12.1 TCASBELE DONE 15 Dec 2007 OK BER
ECAL13.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL13.1 TCASBELE DONE 15 Dec 2007 OK BER
ECAL14.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL14.1 TCASBELE DONE 15 Dec 2007 OK BER
 
Changed:
<
<
From To Tested Comments
ECAL10.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL10.1 TCASBPHO   Redo test
ECAL9.0 TCASBPHO   Redo test
ECAL9.1 TCASBPHO   Redo test
ECAL8.0 TCASBPHO   Redo test
ECAL8.1 TCASBPHO   Redo test
ECAL11.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL11.1 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL12.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL12.1 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL13.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL13.1 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL14.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL14.1 TCASBPHO DONE 15 Dec 2007 OK BER
>
>

Electron Selection Board

Link From Connectivity BER 0dB BER 9dB Comments
1 ECAL8.0 DONE 15 Dec 2007      
2 ECAL9.0 DONE 15 Dec 2007      
3 ECAL13.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
4 ECAL14.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
5 ECAL13.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
6 ECAL14.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
7 ECAL8.1 DONE 15 Dec 2007      
8 ECAL9.1 DONE 15 Dec 2007      
9 ECAL11.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
10 ECAL12.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
11 ECAL11.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
12 ECAL12.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
13 ECAL20.0        
14 ECAL21.0        
15 ECAL15.0        
16 ECAL16.0        
17 ECAL15.1        
18 ECAL16.1        
19 ECAL20.1        
20 ECAL21.1        
21 ECAL17.1        
22 ECAL18.1        
23 ECAL17.0        
24 ECAL18.0        
25 ECAL10.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
26 ECAL10.1 DONE 15 Dec 2007      
27 ECAL19.0        
28 ECAL19.1        

Photon Selection Board

Link From Connectivity BER 0dB BER 9dB Comments
1 ECAL8.0 DONE 15 Dec 2007      
2 ECAL9.0 DONE 15 Dec 2007      
3 ECAL13.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
4 ECAL14.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
5 ECAL13.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
6 ECAL14.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
7 ECAL8.1 DONE 15 Dec 2007      
8 ECAL9.1 DONE 15 Dec 2007      
9 ECAL11.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
10 ECAL12.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
11 ECAL11.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
12 ECAL12.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
13 ECAL20.0        
14 ECAL21.0        
15 ECAL15.0        
16 ECAL16.0        
17 ECAL15.1        
18 ECAL16.1        
19 ECAL20.1        
20 ECAL21.1        
21 ECAL17.1        
22 ECAL18.1        
23 ECAL17.0        
24 ECAL18.0        
25 ECAL10.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
26 ECAL10.1 DONE 15 Dec 2007      
27 ECAL19.0        
28 ECAL19.1        

Local pi0 Selection Board

Link From Connectivity BER 0dB BER 9dB Comments
1 ECAL8.0 DONE 15 Dec 2007      
2 ECAL9.0 DONE 15 Dec 2007      
3 ECAL13.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
4 ECAL14.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
5 ECAL13.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
6 ECAL14.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
7 ECAL8.1 DONE 15 Dec 2007      
8 ECAL9.1 DONE 15 Dec 2007      
9 ECAL11.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
10 ECAL12.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
11 ECAL11.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
12 ECAL12.1 DONE 15 Dec 2007   DONE 15 Dec 2007  
13 ECAL20.0        
14 ECAL21.0        
15 ECAL15.0        
16 ECAL16.0        
17 ECAL15.1        
18 ECAL16.1        
19 ECAL20.1        
20 ECAL21.1        
21 ECAL17.1        
22 ECAL18.1        
23 ECAL17.0        
24 ECAL18.0        
25 ECAL10.0 DONE 15 Dec 2007   DONE 15 Dec 2007  
26 ECAL10.1 DONE 15 Dec 2007      
27 ECAL19.0        
28 ECAL19.1        

Global pi0 Selection Board

Link From Connectivity BER 0dB BER 9dB Comments
1 ECAL8.0        
2 ECAL9.0        
3 ECAL13.0        
4 ECAL14.0        
5 ECAL13.1        
6 ECAL14.1        
7 ECAL8.1        
8 ECAL9.1        
9 ECAL11.0        
10 ECAL12.0        
11 ECAL11.1        
12 ECAL12.1        
13 ECAL20.0        
14 ECAL21.0        
15 ECAL15.0        
16 ECAL16.0        
17 ECAL15.1        
18 ECAL16.1        
19 ECAL20.1        
20 ECAL21.1        
21 ECAL17.1        
22 ECAL18.1        
23 ECAL17.0        
24 ECAL18.0        
25 ECAL10.0        
26 ECAL10.1        
27 ECAL19.0        
28 ECAL19.1        
 
Deleted:
<
<
From To Tested Comments
ECAL10.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL10.1 TCASBPIL   Redo test
ECAL9.0 TCASBPIL   Redo test
ECAL9.1 TCASBPIL   Redo test
ECAL8.0 TCASBPIL   Redo test
ECAL8.1 TCASBPIL   Redo test
ECAL11.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL11.1 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL12.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL12.1 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL13.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL13.1 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL14.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL14.1 TCASBPIL DONE 15 Dec 2007 OK BER
 
From To Tested Comments
ECAL C-side TCASBHMA 1->12 DONE 15 Dec 2007 OK BER, redo input 2 (ECAL13)

Revision 322008-02-21 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 131 to 131
 Sum up of the cabling test progression :

PS/SPD crate PS/SPD neighbour cable ECAL LEFT address cable ECAL RIGHT address cable TVB LEFT pattern cable TVB RIGHT pattern cable
Changed:
<
<
PRS 0 Problem with Long cable      
>
>
PRS 0 Problem with Long cable DONE DONE DONE DONE
 
PRS 1 DONE        
PRS 2 DONE        
PRS 3 DONE        

Revision 312008-02-20 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 126 to 126
 
  • PS/SPD TOP neighbours exchange : the allowed phase ranges (for C-side) can be found here: PSneighbours.xls.
  • PS/SPD - Validation link : the cable test is in progress.
Added:
>
>
  • ECAL - PS/SPD : in progress.

Sum up of the cabling test progression :

PS/SPD crate PS/SPD neighbour cable ECAL LEFT address cable ECAL RIGHT address cable TVB LEFT pattern cable TVB RIGHT pattern cable
PRS 0 Problem with Long cable      
PRS 1 DONE        
PRS 2 DONE        
PRS 3 DONE        
PRS 4       DONE DONE
PRS 5       DONE DONE
PRS 6 DONE     DONE DONE
PRS 7 DONE     DONE DONE
 

Validation Board

Validation board installed on cryo side

Revision 302008-02-12 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 50 to 50
 
ECAL21 ECAL20 DONE 12 Feb 2008  
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100406
ECAL19 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100498
Added:
>
>
HCAL25 HCAL25 12 Feb 2008 Pb with 4CCLALTS100751
 

Optical Cables

Revision 292008-02-12 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"
Changed:
<
<
<!-- /ActionTrackerPlugin -->
---+!! Documentation for L0 Calorimeter hardware
>
>

Documentation for L0 Calorimeter hardware

 
Line: 47 to 47
 
ECAL17 ECAL18 DONE 11 Feb 2008 OK
ECAL18 ECAL17 DONE 11 Feb 2008 OK
ECAL18 ECAL18 DONE 11 Feb 2008 OK
Added:
>
>
ECAL21 ECAL20 DONE 12 Feb 2008  
ECAL20 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100406
ECAL19 ECAL19 DONE 12 Feb 2008 Pb with 4CCLALTS100498
 

Optical Cables

Revision 282008-02-11 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"
<!-- /ActionTrackerPlugin -->
---+!! Documentation for L0 Calorimeter hardware
Line: 33 to 33
 
HCAL23 ECAL13 DONE 24 Oct 2007 OK
HCAL23 ECAL14 DONE 24 Oct 2007 OK
PRS3 ECAL14 DONE 19 Dec 2007 OK
Deleted:
<
<
ECAL18 ECAL18 DONE 30 Jan 2008 OK
 
PRS0 PRS0 DONE 29 Jan 2008 OK
PRS1 PRS1 30 Jan 2008 a backplane RJ45 connector is disabled.
PRS2 PRS2 DONE 29 Jan 2008 OK
Line: 41 to 40
 
PRS1 PRS0 30 Jan 2008 phase problems to settle for some boards.
PRS2 ECAL11 DONE 31 Jan 2008 OK
PRS2 ECAL12 DONE 01 Feb 2008 OK
Added:
>
>
ECAL15 ECAL16 DONE 11 Feb 2008 OK
ECAL16 ECAL16 DONE 11 Feb 2008 OK
ECAL16 ECAL15 DONE 11 Feb 2008 OK
ECAL17 ECAL17 DONE 11 Feb 2008 OK
ECAL17 ECAL18 DONE 11 Feb 2008 OK
ECAL18 ECAL17 DONE 11 Feb 2008 OK
ECAL18 ECAL18 DONE 11 Feb 2008 OK
 

Optical Cables

Revision 272008-02-01 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"
<!-- /ActionTrackerPlugin -->
---+!! Documentation for L0 Calorimeter hardware
Line: 39 to 39
 
PRS2 PRS2 DONE 29 Jan 2008 OK
PRS3 PRS3 DONE 29 Jan 2008 OK
PRS1 PRS0 30 Jan 2008 phase problems to settle for some boards.
Added:
>
>
PRS2 ECAL11 DONE 31 Jan 2008 OK
PRS2 ECAL12 DONE 01 Feb 2008 OK
 

Optical Cables

Revision 262008-01-31 - EricConte

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"
Changed:
<
<

Documentation for L0 Calorimeter hardware

>
>
<!-- /ActionTrackerPlugin -->
---+!! Documentation for L0 Calorimeter hardware
 
Line: 8 to 8
 

Ethernet Cables

Changed:
<
<
These cables are used to exchange trigger information between boards located on the calorimeter platform. The list of all cables is here: TriggerLabels.xls.
>
>
These cables are used to exchange trigger information between boards located on the calorimeter platform. The list of all cables is here: TriggerLabels.xls.
  Test of cables:
From To Tested Comments
Line: 35 to 34
 
HCAL23 ECAL14 DONE 24 Oct 2007 OK
PRS3 ECAL14 DONE 19 Dec 2007 OK
ECAL18 ECAL18 DONE 30 Jan 2008 OK
Added:
>
>
PRS0 PRS0 DONE 29 Jan 2008 OK
PRS1 PRS1 30 Jan 2008 a backplane RJ45 connector is disabled.
PRS2 PRS2 DONE 29 Jan 2008 OK
PRS3 PRS3 DONE 29 Jan 2008 OK
PRS1 PRS0 30 Jan 2008 phase problems to settle for some boards.
 

Optical Cables

Line: 88 to 92
 
ECAL14.1 TCASBPIL DONE 15 Dec 2007 OK BER

From To Tested Comments
Changed:
<
<
ECAL C-side TCASBHMA 1->12 DONE 15 Dec 2007 OK BER, redo input 2 (ECAL13)
>
>
ECAL C-side TCASBHMA 1->12 DONE 15 Dec 2007 OK BER, redo input 2 (ECAL13)
 

HCAL Front-End Board

Line: 106 to 110
 
HCAL23 7
HCAL23 12
Added:
>
>

PS/SPD Front-End Board

  • PS/SPD TOP neighbours exchange : the allowed phase ranges (for C-side) can be found here: PSneighbours.xls.
  • PS/SPD - Validation link : the cable test is in progress.
 

Validation Board

Validation board installed on cryo side
Crate TVB number Tested
Line: 129 to 138
 

D3 Barrack

Changed:
<
<
All L0Calo hardware are in rack D3B01 (Selection Boards and patch panels) except the TELL1s which are in rack D3B02.
>
>
All L0Calo hardware are in rack D3B01 (Selection Boards and patch panels) except the TELL1s which are in rack D3B02.
  D3B01.jpg

Selection Boards

Things to fix in the firmware:

Changed:
<
<
  • Send IDLEs to the L0DU when the local BCID >= N, where N is a 12 bit register accessible via ECS FIXED
>
>
  • Send IDLEs to the L0DU when the local BCID >= N, where N is a 12 bit register accessible via ECS FIXED
 
  • Align input and result in the buffer sent to the TELL1
  • Remove "jitter" in L0Accept
  • Put the channel at 0 when it is masked
Line: 146 to 154
 
  • BCId Delay: Address=0xn103000, Value=0x00000030 (Delay in L0DU: 7)
  • Master Hadron: Address=0x6101000, Value=0x70000000, Address=0x6103000, Value=0x80000000
  • Slave1 Hadron: Address=0x6101000, Value=0x000C0000, Address=0x6103000, Value=0x00000000
Changed:
<
<
  • IDLES for L0DU: Address = 0x6104000, Value=0x00DE9000 (==> 3 IDLES)
>
>
  • IDLES for L0DU: Address = 0x6104000, Value=0x00DE9000 (==> 3 IDLES)
 
  • Type for TELL1: Address = 0x6108000, Value = 0x00000001
  • Latency: Address = 0x6109000, Value=0x00000050
Line: 154 to 162
 

Optical Cables

Changed:
<
<
These cables are used to connect the output of the optical patch panels in the D3B01 rack (that is to say the output of the Trigger Validation Boards and of the SPD Multiplicity Boards) to the input of the Selection Boards, and to connect the Selection Boards to the L0DU and the TELL1s. The list of optical cables and the map of connections in the patch panels are here: OpticalL0CaloCablesD3.xls.
>
>
These cables are used to connect the output of the optical patch panels in the D3B01 rack (that is to say the output of the Trigger Validation Boards and of the SPD Multiplicity Boards) to the input of the Selection Boards, and to connect the Selection Boards to the L0DU and the TELL1s. The list of optical cables and the map of connections in the patch panels are here: OpticalL0CaloCablesD3.xls.
 

Network Cables

Line: 162 to 166
 

Network Cables

Deleted:
<
<
 -- PatrickRobbe - 30 Jul 2007

Deleted:
<
<
META FILEATTACHMENT attachment="TriggerLabels.xls" attr="" comment="List of ethernet L0Calo trigger cables" date="1185802456" name="TriggerLabels.xls" path="TriggerLabels.xls" size="419328" stream="TriggerLabels.xls" user="Main.PatrickRobbe" version="1"
META FILEATTACHMENT attachment="OpticalTriggerL0CaloCables-Children.xls" attr="" comment="List of L0Calo optical cables in the barrack and connections in the patch panel" date="1185802810" name="OpticalTriggerL0CaloCables-Children.xls" path="OpticalTriggerL0CaloCables-Children.xls" size="246272" stream="OpticalTriggerL0CaloCables-Children.xls" user="Main.PatrickRobbe" version="1"
 
META FILEATTACHMENT attachment="D3B01.jpg" attr="" comment="Picture of D3B01 rack" date="1185805081" name="D3B01.jpg" path="D3B01.jpg" size="72264" stream="D3B01.jpg" user="Main.PatrickRobbe" version="4"
Added:
>
>
META FILEATTACHMENT attachment="OpticalTriggerL0CaloCables-Children.xls" attr="" comment="List of L0Calo optical cables in the barrack and connections in the patch panel" date="1185802810" name="OpticalTriggerL0CaloCables-Children.xls" path="OpticalTriggerL0CaloCables-Children.xls" size="246272" stream="OpticalTriggerL0CaloCables-Children.xls" user="Main.PatrickRobbe" version="1"
META FILEATTACHMENT attachment="TriggerLabels.xls" attr="" comment="List of ethernet L0Calo trigger cables" date="1185802456" name="TriggerLabels.xls" path="TriggerLabels.xls" size="419328" stream="TriggerLabels.xls" user="Main.PatrickRobbe" version="1"
META FILEATTACHMENT attachment="PSneighbours.xls" attr="" comment="" date="1201801368" name="PSneighbours.xls" path="C:\Documents and Settings\lhcb\Bureau\Docs\PSneighbours.xls" size="30720" stream="C:\Documents and Settings\lhcb\Bureau\Docs\PSneighbours.xls" user="Main.EricConte" version="1"

Revision 252008-01-30 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 34 to 34
 
HCAL23 ECAL13 DONE 24 Oct 2007 OK
HCAL23 ECAL14 DONE 24 Oct 2007 OK
PRS3 ECAL14 DONE 19 Dec 2007 OK
Added:
>
>
ECAL18 ECAL18 DONE 30 Jan 2008 OK
 

Optical Cables

Revision 242007-12-19 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 33 to 33
 
HCAL23 ECAL12 DONE 24 Oct 2007 OK
HCAL23 ECAL13 DONE 24 Oct 2007 OK
HCAL23 ECAL14 DONE 24 Oct 2007 OK
Added:
>
>
PRS3 ECAL14 DONE 19 Dec 2007 OK
 

Optical Cables

Revision 232007-12-16 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 70 to 70
 
ECAL14.1 TCASBPHO DONE 15 Dec 2007 OK BER

From To Tested Comments
Changed:
<
<
ECAL10.0 TCASBPIL NOT OK 15 Dec 2007  
>
>
ECAL10.0 TCASBPIL DONE 15 Dec 2007 OK BER
 
ECAL10.1 TCASBPIL   Redo test
ECAL9.0 TCASBPIL   Redo test
ECAL9.1 TCASBPIL   Redo test

Revision 222007-12-16 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 85 to 85
 
ECAL14.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL14.1 TCASBPIL DONE 15 Dec 2007 OK BER
Added:
>
>
From To Tested Comments
ECAL C-side TCASBHMA 1->12 DONE 15 Dec 2007 OK BER, redo input 2 (ECAL13)
 

HCAL Front-End Board

List of boards with old trigger FPGA version:

Revision 212007-12-16 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 69 to 69
 
ECAL14.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL14.1 TCASBPHO DONE 15 Dec 2007 OK BER
Changed:
<
<
>
>
From To Tested Comments
ECAL10.0 TCASBPIL NOT OK 15 Dec 2007  
ECAL10.1 TCASBPIL   Redo test
ECAL9.0 TCASBPIL   Redo test
ECAL9.1 TCASBPIL   Redo test
ECAL8.0 TCASBPIL   Redo test
ECAL8.1 TCASBPIL   Redo test
ECAL11.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL11.1 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL12.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL12.1 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL13.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL13.1 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL14.0 TCASBPIL DONE 15 Dec 2007 OK BER
ECAL14.1 TCASBPIL DONE 15 Dec 2007 OK BER
 

HCAL Front-End Board

Revision 202007-12-15 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 53 to 53
 
ECAL14.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL14.1 TCASBELE DONE 15 Dec 2007 OK BER
Added:
>
>
From To Tested Comments
ECAL10.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL10.1 TCASBPHO   Redo test
ECAL9.0 TCASBPHO   Redo test
ECAL9.1 TCASBPHO   Redo test
ECAL8.0 TCASBPHO   Redo test
ECAL8.1 TCASBPHO   Redo test
ECAL11.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL11.1 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL12.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL12.1 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL13.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL13.1 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL14.0 TCASBPHO DONE 15 Dec 2007 OK BER
ECAL14.1 TCASBPHO DONE 15 Dec 2007 OK BER

 

HCAL Front-End Board

List of boards with old trigger FPGA version:

Revision 192007-12-15 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 36 to 36
 

Optical Cables

Added:
>
>
Test of cables:
From To Tested Comments
ECAL10.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL10.1 TCASBELE   Redo test
ECAL9.0 TCASBELE   Redo test
ECAL9.1 TCASBELE   Redo test
ECAL8.0 TCASBELE   Redo test
ECAL8.1 TCASBELE   Redo test
ECAL11.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL11.1 TCASBELE DONE 15 Dec 2007 OK BER
ECAL12.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL12.1 TCASBELE DONE 15 Dec 2007 OK BER
ECAL13.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL13.1 TCASBELE DONE 15 Dec 2007 OK BER
ECAL14.0 TCASBELE DONE 15 Dec 2007 OK BER
ECAL14.1 TCASBELE DONE 15 Dec 2007 OK BER
 

HCAL Front-End Board

List of boards with old trigger FPGA version:

Revision 182007-12-05 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 86 to 86
 
  • Send IDLEs to the L0DU when the local BCID >= N, where N is a 12 bit register accessible via ECS FIXED
  • Align input and result in the buffer sent to the TELL1
  • Remove "jitter" in L0Accept
Added:
>
>
  • Put the channel at 0 when it is masked
 

Settings for SB:

  • BCId Delay: Address=0xn103000, Value=0x00000030 (Delay in L0DU: 7)

Revision 172007-12-05 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 83 to 83
 

Selection Boards

Things to fix in the firmware:

Changed:
<
<
  • Send IDLEs to the L0DU when the local BCID >= N, where N is a 12 bit register accessible via ECS
>
>
  • Send IDLEs to the L0DU when the local BCID >= N, where N is a 12 bit register accessible via ECS FIXED
  • Align input and result in the buffer sent to the TELL1
  • Remove "jitter" in L0Accept
 

Settings for SB:

Changed:
<
<
  • BCId Delay: Address=0x1103000, Value=0x00000030 (Delay in L0DU: 7)
>
>
  • BCId Delay: Address=0xn103000, Value=0x00000030 (Delay in L0DU: 7)
 
  • Master Hadron: Address=0x6101000, Value=0x70000000, Address=0x6103000, Value=0x80000000
  • Slave1 Hadron: Address=0x6101000, Value=0x000C0000, Address=0x6103000, Value=0x00000000
Added:
>
>
  • IDLES for L0DU: Address = 0x6104000, Value=0x00DE9000 (==> 3 IDLES)
  • Type for TELL1: Address = 0x6108000, Value = 0x00000001
  • Latency: Address = 0x6109000, Value=0x00000050
 

TELL1s

Revision 162007-11-26 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 86 to 86
 
  • Send IDLEs to the L0DU when the local BCID >= N, where N is a 12 bit register accessible via ECS

Settings for SB:

Changed:
<
<
  • BCId Delay: Address=0x1103000, Value=0x0000000A
>
>
  • BCId Delay: Address=0x1103000, Value=0x00000030 (Delay in L0DU: 7)
 
  • Master Hadron: Address=0x6101000, Value=0x70000000, Address=0x6103000, Value=0x80000000
  • Slave1 Hadron: Address=0x6101000, Value=0x000C0000, Address=0x6103000, Value=0x00000000

Revision 152007-11-20 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 87 to 87
 

Settings for SB:

  • BCId Delay: Address=0x1103000, Value=0x0000000A
Changed:
<
<
  • Master Hadron: Address=0x6101000, Value=0x00000000, Address=0x6103000, Value=0x80000000
>
>
  • Master Hadron: Address=0x6101000, Value=0x70000000, Address=0x6103000, Value=0x80000000
 
  • Slave1 Hadron: Address=0x6101000, Value=0x000C0000, Address=0x6103000, Value=0x00000000

TELL1s

Revision 142007-11-16 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 85 to 85
 

Things to fix in the firmware:

* Send IDLEs to the L0DU when the local BCID >= N, where N is a 12 bit register accessible via ECS
Added:
>
>

Settings for SB:

  • BCId Delay: Address=0x1103000, Value=0x0000000A
  • Master Hadron: Address=0x6101000, Value=0x00000000, Address=0x6103000, Value=0x80000000
  • Slave1 Hadron: Address=0x6101000, Value=0x000C0000, Address=0x6103000, Value=0x00000000
 

TELL1s

Optical Cables

Revision 132007-11-12 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 40 to 40
  List of boards with old trigger FPGA version:
Crate Slot (trigger slot from 0 to 15)
Added:
>
>
HCAL22 3
HCAL22 4
HCAL22 5
HCAL22 7
HCAL22 8
HCAL22 9
HCAL22 10
HCAL22 12
 
HCAL23 1
HCAL23 7
HCAL23 12

Revision 122007-11-07 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 21 to 21
 
ECAL14 ECAL13 DONE 24 Oct 2007 OK
ECAL9 ECAL8 DONE 25 Oct 2007 OK
ECAL10 ECAL9 DONE 31 Oct 2007 Cable 4CCLALTS100001 was bad: OK after replugging
Changed:
<
<
ECAL10 ECAL10 No 31 Oct 2007 Connector corresponding to cable 4CCLALTS100092 is bad
>
>
ECAL10 ECAL10 DONE 31 Oct 2007 Connector corresponding to cable 4CCLALTS100092 is bad: problem identified in FE Board, board now replaced: OK
 
ECAL11 ECAL11 DONE 25 Oct 2007 OK
ECAL11 ECAL12 DONE 25 Oct 2007 OK
ECAL12 ECAL11 DONE 31 Oct 2007 OK
Line: 74 to 74
 

Selection Boards

Added:
>
>

Things to fix in the firmware:

* Send IDLEs to the L0DU when the local BCID >= N, where N is a 12 bit register accessible via ECS
 

TELL1s

Optical Cables

Revision 112007-11-05 - MarieNoelleMINARD

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 45 to 45
 
HCAL23 12

Validation Board

Changed:
<
<
Scan validation board:
>
>
Validation board installed on cryo side
Crate TVB number Tested
8 0 DONE27 Oct 2007
  1 DONE27 Oct 2007
9 2 DONE27 Oct 2007
  3 DONE27 Oct 2007
10 4 DONE27 Oct 2007
  5 DONE27 Oct 2007
11 6 DONE27 Oct 2007
  7 DONE27 Oct 2007
12 8 DONE27 Oct 2007
  9 DONE27 Oct 2007
13 10 DONE27 Oct 2007
  11 DONE27 Oct 2007
14 12 DONE27 Oct 2007
  13 DONE27 Oct 2007
 

D2 Barrack

Control PC

Revision 102007-11-05 - MarieNoelleMINARD

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 44 to 44
 
HCAL23 7
HCAL23 12
Added:
>
>

Validation Board

Scan validation board:
 

D2 Barrack

Control PC

Revision 92007-10-31 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 20 to 20
 
ECAL13 ECAL14 DONE24 Oct 2007 OK
ECAL14 ECAL13 DONE 24 Oct 2007 OK
ECAL9 ECAL8 DONE 25 Oct 2007 OK
Changed:
<
<
ECAL10 ECAL9 No 25 Oct 2007 Cable 4CCLALTS100001 is bad: bad values are sent to chanel Up1
ECAL10 ECAL10 No 25 Oct 2007 Cable 4CCLALTS100092 is not plugged or cut
Cable 4CCLALTS100101 and cable 4CCLALTS100102 cannot be tested because board in slot 13 ECAL10 is missing
>
>
ECAL10 ECAL9 DONE 31 Oct 2007 Cable 4CCLALTS100001 was bad: OK after replugging
ECAL10 ECAL10 No 31 Oct 2007 Connector corresponding to cable 4CCLALTS100092 is bad
 
ECAL11 ECAL11 DONE 25 Oct 2007 OK
ECAL11 ECAL12 DONE 25 Oct 2007 OK
Changed:
<
<
ECAL12 ECAL11 No 25 Oct 2007 Cable 4CCLALTS100047 and cable 4CCLALTS100048 cannot be tested because board in slot 2 ECAL11 is missing
>
>
ECAL12 ECAL11 DONE 31 Oct 2007 OK
 
HCAL22 ECAL8 DONE 24 Oct 2007 OK
HCAL22 ECAL9 DONE 24 Oct 2007 OK
HCAL22 ECAL10 DONE24 Oct 2007 OK

Revision 82007-10-29 - StephenWotton

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Revision 72007-10-25 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 23 to 23
 
ECAL10 ECAL9 No 25 Oct 2007 Cable 4CCLALTS100001 is bad: bad values are sent to chanel Up1
ECAL10 ECAL10 No 25 Oct 2007 Cable 4CCLALTS100092 is not plugged or cut
Cable 4CCLALTS100101 and cable 4CCLALTS100102 cannot be tested because board in slot 13 ECAL10 is missing
Added:
>
>
ECAL11 ECAL11 DONE 25 Oct 2007 OK
ECAL11 ECAL12 DONE 25 Oct 2007 OK
ECAL12 ECAL11 No 25 Oct 2007 Cable 4CCLALTS100047 and cable 4CCLALTS100048 cannot be tested because board in slot 2 ECAL11 is missing
 
HCAL22 ECAL8 DONE 24 Oct 2007 OK
HCAL22 ECAL9 DONE 24 Oct 2007 OK
HCAL22 ECAL10 DONE24 Oct 2007 OK

Revision 62007-10-25 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 20 to 20
 
ECAL13 ECAL14 DONE24 Oct 2007 OK
ECAL14 ECAL13 DONE 24 Oct 2007 OK
ECAL9 ECAL8 DONE 25 Oct 2007 OK
Added:
>
>
ECAL10 ECAL9 No 25 Oct 2007 Cable 4CCLALTS100001 is bad: bad values are sent to chanel Up1
ECAL10 ECAL10 No 25 Oct 2007 Cable 4CCLALTS100092 is not plugged or cut
Cable 4CCLALTS100101 and cable 4CCLALTS100102 cannot be tested because board in slot 13 ECAL10 is missing
 
HCAL22 ECAL8 DONE 24 Oct 2007 OK
HCAL22 ECAL9 DONE 24 Oct 2007 OK
HCAL22 ECAL10 DONE24 Oct 2007 OK

Revision 52007-10-25 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 16 to 16
 
HCAL22 HCAL22 DONE 3 Sep 2007 OK
HCAL23 HCAL23 DONE 4 Sep 2007 OK
ECAL12 ECAL12 DONE 25 Sep 2007 OK
Added:
>
>
ECAL14 ECAL14 DONE 24 Oct 2007 OK
ECAL13 ECAL14 DONE24 Oct 2007 OK
ECAL14 ECAL13 DONE 24 Oct 2007 OK
ECAL9 ECAL8 DONE 25 Oct 2007 OK
 
HCAL22 ECAL8 DONE 24 Oct 2007 OK
HCAL22 ECAL9 DONE 24 Oct 2007 OK
HCAL22 ECAL10 DONE24 Oct 2007 OK

Revision 42007-10-24 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 16 to 16
 
HCAL22 HCAL22 DONE 3 Sep 2007 OK
HCAL23 HCAL23 DONE 4 Sep 2007 OK
ECAL12 ECAL12 DONE 25 Sep 2007 OK
Added:
>
>
HCAL22 ECAL8 DONE 24 Oct 2007 OK
HCAL22 ECAL9 DONE 24 Oct 2007 OK
HCAL22 ECAL10 DONE24 Oct 2007 OK
HCAL23 ECAL10 DONE 24 Oct 2007 OK
HCAL23 ECAL11 DONE 24 Oct 2007 OK
HCAL23 ECAL12 DONE 24 Oct 2007 OK
HCAL23 ECAL13 DONE 24 Oct 2007 OK
HCAL23 ECAL14 DONE 24 Oct 2007 OK
 

Optical Cables

Revision 32007-09-25 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 15 to 15
 
From To Tested Comments
HCAL22 HCAL22 DONE 3 Sep 2007 OK
HCAL23 HCAL23 DONE 4 Sep 2007 OK
Added:
>
>
ECAL12 ECAL12 DONE 25 Sep 2007 OK
 

Optical Cables

Revision 22007-09-04 - PatrickRobbe

Line: 1 to 1
 
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Line: 11 to 11
 These cables are used to exchange trigger information between boards located on the calorimeter platform. The list of all cables is here: TriggerLabels.xls.
Added:
>
>
Test of cables:
From To Tested Comments
HCAL22 HCAL22 DONE 3 Sep 2007 OK
HCAL23 HCAL23 DONE 4 Sep 2007 OK
 

Optical Cables

Added:
>
>

HCAL Front-End Board

List of boards with old trigger FPGA version:

Crate Slot (trigger slot from 0 to 15)
HCAL23 1
HCAL23 7
HCAL23 12
 

D2 Barrack

Control PC

Revision 12007-07-30 - PatrickRobbe

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="LHCbL0Trigger"

Documentation for L0 Calorimeter hardware

Cavern

Ethernet Cables

These cables are used to exchange trigger information between boards located on the calorimeter platform. The list of all cables is here: TriggerLabels.xls.

Optical Cables

D2 Barrack

Control PC

D3 Barrack

All L0Calo hardware are in rack D3B01 (Selection Boards and patch panels) except the TELL1s which are in rack D3B02.

D3B01.jpg

Selection Boards

TELL1s

Optical Cables

These cables are used to connect the output of the optical patch panels in the D3B01 rack (that is to say the output of the Trigger Validation Boards and of the SPD Multiplicity Boards) to the input of the Selection Boards, and to connect the Selection Boards to the L0DU and the TELL1s. The list of optical cables and the map of connections in the patch panels are here: OpticalL0CaloCablesD3.xls.

Network Cables

-- PatrickRobbe - 30 Jul 2007

META FILEATTACHMENT attachment="TriggerLabels.xls" attr="" comment="List of ethernet L0Calo trigger cables" date="1185802456" name="TriggerLabels.xls" path="TriggerLabels.xls" size="419328" stream="TriggerLabels.xls" user="Main.PatrickRobbe" version="1"
META FILEATTACHMENT attachment="OpticalTriggerL0CaloCables-Children.xls" attr="" comment="List of L0Calo optical cables in the barrack and connections in the patch panel" date="1185802810" name="OpticalTriggerL0CaloCables-Children.xls" path="OpticalTriggerL0CaloCables-Children.xls" size="246272" stream="OpticalTriggerL0CaloCables-Children.xls" user="Main.PatrickRobbe" version="1"
META FILEATTACHMENT attachment="D3B01.jpg" attr="" comment="Picture of D3B01 rack" date="1185805081" name="D3B01.jpg" path="D3B01.jpg" size="72264" stream="D3B01.jpg" user="Main.PatrickRobbe" version="4"
 