META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Revision 1372009-11-05 - StevenPavis

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Revision 1362009-10-06 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 100 to 100
 
ECAL MAINTENANCE OF ECAL VOLTAGE DISTRIBUTION/LED TRIGGER SYSTEMS Irina Machikhiliyan 2009-09-29 2009-09-30 CE0022   roll eyes (sarcastic) in preparation
RICH 2 Replacement of HPD side A C. Frei 2009-10-07 2009-10-09   M1 & Calo closed on that side. roll eyes (sarcastic) in preparation
RICH 2 Replacement of HPD side C C. Frei 2009-10-14 2009-10-19   M1 & Calo closed on that side. roll eyes (sarcastic) in preparation
Added:
>
>
ECAL Repair the ECAL HV_control Anatoly Konoplyannikov 2009-10-05 2009-10-05 CE0023   big grin done
 
<!--edittable1-->

Revision 1352009-10-05 - unknown

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 98 to 98
 
MOEDAL Put up a few test panels and drill holes on top of VELO Richard SOLUK 2009-09-14 2009-09-16 DD0002   big grin done
ECAL Replacement of one fuse in LV chain (A-side) and two cable connectors (C and A side) Irina Machikhiliyan 2009-09-04 2009-09-04 CE0021   big grin done
ECAL MAINTENANCE OF ECAL VOLTAGE DISTRIBUTION/LED TRIGGER SYSTEMS Irina Machikhiliyan 2009-09-29 2009-09-30 CE0022   roll eyes (sarcastic) in preparation
Added:
>
>
RICH 2 Replacement of HPD side A C. Frei 2009-10-07 2009-10-09   M1 & Calo closed on that side. roll eyes (sarcastic) in preparation
RICH 2 Replacement of HPD side C C. Frei 2009-10-14 2009-10-19   M1 & Calo closed on that side. roll eyes (sarcastic) in preparation
 
<!--edittable1-->

Revision 1342009-10-01 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<
  • 28 Sep 2009 - 28 Sep 2009 - 08:00-24:00 UXB85 closed due to transfer line test
  • 29 Sep 2009 - 29 Sep 2009 - 08:00-22:00 removing BP protection and closing IT/OT
  • 30 Sep 2009 - 01 Oct 2009 - 08:00-17:00 Pump down of beam pipe
>
>
  • 09 Oct 2009 - 09 Oct 2009 - 15:00-24:00 Closing of the cavern for the TED run (UX85B)
  • 12 Oct 2009 - 13 Oct 2009 - 00:00-24:00 TED run, cavern closed (UX85B)
  • 19 Oct 2009 - 19 Oct 2009 - 15:00-24:00 DSO test, cavern closed (UX85B)
  • 20 Oct 2009 - 21 Oct 2009 - 00:00-24:00 DSO test, cavern closed (UX85B)
  • 23 Oct 2009 - 23 Oct 2009 - 15:00-24:00 Closing of the cavern for Injection test (UX85B)
  • 24 Oct 2009 - 26 Oct 2009 - 00:00-24:00 Closing of the cavern for Injection test (UX85B)
  • 07 Oct 2009 - 08 Oct 2009 - 08:00-24:00 RICH HPD exchange, side A
  • 09 Oct 2009 - 09 Oct 2009 - 08:00-15:00 RICH HPD exchange, side A, Survey
  • 14 Oct 2009 - 14 Oct 2009 - 14:00-18:00 RICH HPD exchange, side C
  • 15 Oct 2009 - 18 Oct 2009 - 08:00-18:00 RICH HPD exchange, side C
  • 19 Oct 2009 - 19 Oct 2009 - 08:00-15:00 RICH HPD exchange, side C, Survey
 

<!-- /editTable -->

Revision 1332009-09-29 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 86 to 86
 
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   big grin done
RICH 2 CLOSURE OF THE GAS ENCLOSURE C. Frei 14 August 2009 14 August 2009     big grin done
ECAL Replacement of malfunctioning PMT/C-W doublets Irina Machikhiliyan 2009-08-18 2009-08-19 CE0020   big grin done
Changed:
<
<
MOEDAL Put up a few test panels and drill holes on top of VELO Richard SOLUK 2009-09-14 2009-09-16 DD0002   roll eyes (sarcastic) in preparation
>
>
MOEDAL Put up a few test panels and drill holes on top of VELO Richard SOLUK 2009-09-14 2009-09-16 DD0002   big grin done
 
ECAL Replacement of one fuse in LV chain (A-side) and two cable connectors (C and A side) Irina Machikhiliyan 2009-09-04 2009-09-04 CE0021   big grin done
Added:
>
>
ECAL MAINTENANCE OF ECAL VOLTAGE DISTRIBUTION/LED TRIGGER SYSTEMS Irina Machikhiliyan 2009-09-29 2009-09-30 CE0022   roll eyes (sarcastic) in preparation
 
<!--edittable1-->

Revision 1322009-09-28 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<

  • 11 Sep 2009 - 14 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side A
  • 4 Sep 2009 - 9 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side C
  • 14 Sep 2009 - 14 Sep 2009 - 08:00-10:00 Removing RICH 1 scintillator
  • 14 Sep 2009 - 14 Sep 2009 - 10:00-12:39 Installation of scaffolding for Moedal
  • 14 Sep 2009 - 16 Sep 2009 - 09:00-17:00 Moedal installation
  • 9 Sep 2009 - 15 Sep 2009 - 08:00-17:00 Closing Muon, Calorimeter
  • 28 Sep 2009 - 29 Sep 2009 - 08:00-22:00 removing BP protection and closing IT/OT
  • 17 Sep 2009 - 18 Sep 2009 - 08:00-17:00 Powering of the magnet + survey
>
>
  • 28 Sep 2009 - 28 Sep 2009 - 08:00-24:00 UXB85 closed due to transfer line test
  • 29 Sep 2009 - 29 Sep 2009 - 08:00-22:00 removing BP protection and closing IT/OT
 
  • 30 Sep 2009 - 01 Oct 2009 - 08:00-17:00 Pump down of beam pipe

Revision 1312009-09-08 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 93 to 93
 
Infrastructure High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009 IX004 No work between magnet and RICH2 big grin done
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   big grin done
RICH 2 CLOSURE OF THE GAS ENCLOSURE C. Frei 14 August 2009 14 August 2009     big grin done
Changed:
<
<
ECAL Replacement of malfunctioning PMT/C-W doublets Irina Machikhiliyan 2009-08-18 2009-08-19 CE0020   smile started
>
>
ECAL Replacement of malfunctioning PMT/C-W doublets Irina Machikhiliyan 2009-08-18 2009-08-19 CE0020   big grin done
 
MOEDAL Put up a few test panels and drill holes on top of VELO Richard SOLUK 2009-09-14 2009-09-16 DD0002   roll eyes (sarcastic) in preparation
Added:
>
>
ECAL Replacement of one fuse in LV chain (A-side) and two cable connectors (C and A side) Irina Machikhiliyan 2009-09-04 2009-09-04 CE0021   big grin done
 
<!--edittable1-->

Revision 1302009-09-08 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 6 to 6
 
Changed:
<
<
  • 31 Aug 2009 - 14 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side A
>
>
  • 11 Sep 2009 - 14 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side A
 
  • 4 Sep 2009 - 9 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side C
  • 14 Sep 2009 - 14 Sep 2009 - 08:00-10:00 Removing RICH 1 scintillator
Changed:
<
<
  • 14 Sep 2009 - 14 Sep 2009 - 10:00-24:00 Installation of scaffolding for Moedal
>
>
  • 14 Sep 2009 - 14 Sep 2009 - 10:00-12:39 Installation of scaffolding for Moedal
  • 14 Sep 2009 - 16 Sep 2009 - 09:00-17:00 Moedal installation
 
  • 9 Sep 2009 - 15 Sep 2009 - 08:00-17:00 Closing Muon, Calorimeter
Changed:
<
<
  • 15 Sep 2009 - 16 Sep 2009 - 08:00-17:00 removing BP protection and closing IT/OT
>
>
  • 28 Sep 2009 - 29 Sep 2009 - 08:00-22:00 removing BP protection and closing IT/OT
 
  • 17 Sep 2009 - 18 Sep 2009 - 08:00-17:00 Powering of the magnet + survey
  • 30 Sep 2009 - 01 Oct 2009 - 08:00-17:00 Pump down of beam pipe

Revision 1292009-09-07 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 93 to 93
 
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   big grin done
RICH 2 CLOSURE OF THE GAS ENCLOSURE C. Frei 14 August 2009 14 August 2009     big grin done
ECAL Replacement of malfunctioning PMT/C-W doublets Irina Machikhiliyan 2009-08-18 2009-08-19 CE0020   smile started
Added:
>
>
MOEDAL Put up a few test panels and drill holes on top of VELO Richard SOLUK 2009-09-14 2009-09-16 DD0002   roll eyes (sarcastic) in preparation
 
<!--edittable1-->

Revision 1282009-09-07 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<
  • 28 Aug 2009 - 28 Aug 2009 - 15:00-24:00 Closing cavern - POWER CUT, general services.
  • 29 Aug 2009 - 30 Aug 2009 - 00:00-24:00 Closing cavern - POWER CUT, general services.
  • 31 Aug 2009 - 3 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side A
>
>
  • 31 Aug 2009 - 14 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side A
 
  • 4 Sep 2009 - 9 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side C
Added:
>
>
  • 14 Sep 2009 - 14 Sep 2009 - 08:00-10:00 Removing RICH 1 scintillator
  • 14 Sep 2009 - 14 Sep 2009 - 10:00-24:00 Installation of scaffolding for Moedal
 
  • 9 Sep 2009 - 15 Sep 2009 - 08:00-17:00 Closing Muon, Calorimeter
  • 15 Sep 2009 - 16 Sep 2009 - 08:00-17:00 removing BP protection and closing IT/OT
Changed:
<
<
  • 18 Sep 2009 - 18 Sep 2009 - 08:00-17:00 Powering of the magnet + survey
  • 21 Sep 2009 - 24 Sep 2009 - 08:00-17:00 Pump down of beam pipe
>
>
  • 17 Sep 2009 - 18 Sep 2009 - 08:00-17:00 Powering of the magnet + survey
  • 30 Sep 2009 - 01 Oct 2009 - 08:00-17:00 Pump down of beam pipe
 

<!-- /editTable -->

Revision 1272009-08-25 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 87 to 87
 
ECAL Install modified integrators on ECAL A-side Irina Machikhiliyan 19 June 2009 22 June 2009 CE0018   big grin done
PS Change of the PS VFE LV patch panels Pascal PERRET 26 June 2009 6 July 2009 CP0012   big grin done
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   big grin done
Changed:
<
<
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   roll eyes (sarcastic) in preparation
>
>
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   big grin done
 
Infrastructure High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009 IX004 No work between magnet and RICH2 big grin done
Changed:
<
<
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   roll eyes (sarcastic) in preparation
RICH 2 CLOSURE OF THE GAS ENCLOSURE C. Frei 14 August 2009 14 August 2009     roll eyes (sarcastic) in preparation
>
>
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   big grin done
RICH 2 CLOSURE OF THE GAS ENCLOSURE C. Frei 14 August 2009 14 August 2009     big grin done
 
ECAL Replacement of malfunctioning PMT/C-W doublets Irina Machikhiliyan 2009-08-18 2009-08-19 CE0020   smile started
<!--edittable1-->

Revision 1262009-08-25 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<
>
>
  • 28 Aug 2009 - 28 Aug 2009 - 15:00-24:00 Closing cavern - POWER CUT, general services.
  • 29 Aug 2009 - 30 Aug 2009 - 00:00-24:00 Closing cavern - POWER CUT, general services.
 
  • 31 Aug 2009 - 3 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side A
  • 4 Sep 2009 - 9 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side C
  • 9 Sep 2009 - 15 Sep 2009 - 08:00-17:00 Closing Muon, Calorimeter

Revision 1252009-08-25 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 6 to 6
 

Changed:
<
<
  • 19 Aug 2009 - 19 Aug 2009 - 18:00-24:00 Cavern closed, LHC evacuation system
  • 20 Aug 2009 - 20 Aug 2009 - 00:00-02:00 Cavern closed, LHC evacuation system
>
>
  • 31 Aug 2009 - 3 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side A
  • 4 Sep 2009 - 9 Sep 2009 - 08:00-17:00 Installation RICH 2 tower side C
  • 9 Sep 2009 - 15 Sep 2009 - 08:00-17:00 Closing Muon, Calorimeter
  • 15 Sep 2009 - 16 Sep 2009 - 08:00-17:00 removing BP protection and closing IT/OT
  • 18 Sep 2009 - 18 Sep 2009 - 08:00-17:00 Powering of the magnet + survey
  • 21 Sep 2009 - 24 Sep 2009 - 08:00-17:00 Pump down of beam pipe
 

<!-- /editTable -->
Line: 83 to 87
 
PS Change of the PS VFE LV patch panels Pascal PERRET 26 June 2009 6 July 2009 CP0012   big grin done
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   big grin done
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   roll eyes (sarcastic) in preparation
Changed:
<
<
Infrastructure High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009 IX004 No work between magnet and RICH2 smile started
>
>
Infrastructure High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009 IX004 No work between magnet and RICH2 big grin done
 
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   roll eyes (sarcastic) in preparation
RICH 2 CLOSURE OF THE GAS ENCLOSURE C. Frei 14 August 2009 14 August 2009     roll eyes (sarcastic) in preparation
ECAL Replacement of malfunctioning PMT/C-W doublets Irina Machikhiliyan 2009-08-18 2009-08-19 CE0020   smile started

Revision 1242009-08-19 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 10 to 10
 
  • 20 Aug 2009 - 20 Aug 2009 - 00:00-02:00 Cavern closed, LHC evacuation system
Changed:
<
<
<!-- /editTable -->
<!--edittable1-->
>
>
<!-- /editTable -->
 
Sub detector Task Responsible start_DATE end_DATE Reference COMMENTS STATUS
  template       TEMPLATE   roll eyes (sarcastic) in preparation
Magnet checking position of coils on supports R. Lindner 12 January 2009 16 January 2009 MX0001   big grin done
Line: 87 to 86
 
Infrastructure High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009 IX004 No work between magnet and RICH2 smile started
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   roll eyes (sarcastic) in preparation
RICH 2 CLOSURE OF THE GAS ENCLOSURE C. Frei 14 August 2009 14 August 2009     roll eyes (sarcastic) in preparation
Changed:
<
<
>
>
ECAL Replacement of malfunctioning PMT/C-W doublets Irina Machikhiliyan 2009-08-18 2009-08-19 CE0020   smile started
<!--edittable1-->
 

Revision 1232009-08-18 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Deleted:
<
<
  • 22 Jun 2009 - 06 Jul 2009 - 09:00-18:00 Outer Tracker: Heating
  • 06 Jul 2009 - 06 Jul 2009 - 09:00-12:00 Beam pipe Remove protection behind RICH 2
  • 06 Jul 2009 - 07 Jul 2009 - 09:15-18:00 M1:closing M1 and survey
  • 27 Jul 2009 - 28 Jul 2009 - 08:00-18:00 Magnet powering, survey RICH 1 & TT
  • 07 Jul 2009 - 10 Jul 2009 - 09:00-17:00 Inner Tracker: Survey
  • 29 Jun 2009 - 30 Jun 2009 - 00:00-24:00 Others: ABSOLUTE GRAVITY MEASUREMENTS
  • 22 Jul 2009 - 22 Jul 2009 - 08:00-18:00 FB exercise in PZ85 shaft
 
Added:
>
>
  • 19 Aug 2009 - 19 Aug 2009 - 18:00-24:00 Cavern closed, LHC evacuation system
  • 20 Aug 2009 - 20 Aug 2009 - 00:00-02:00 Cavern closed, LHC evacuation system
 

<!-- /editTable -->

Revision 1222009-08-12 - ChristophFrei

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 91 to 91
 
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   roll eyes (sarcastic) in preparation
Infrastructure High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009 IX004 No work between magnet and RICH2 smile started
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   roll eyes (sarcastic) in preparation
Added:
>
>
RICH 2 CLOSURE OF THE GAS ENCLOSURE C. Frei 14 August 2009 14 August 2009     roll eyes (sarcastic) in preparation
 

Revision 1212009-08-11 - EricThomas

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 89 to 89
 
PS Change of the PS VFE LV patch panels Pascal PERRET 26 June 2009 6 July 2009 CP0012   big grin done
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   big grin done
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   roll eyes (sarcastic) in preparation
Changed:
<
<
Safety High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009   No work between magnet and RICH2 roll eyes (sarcastic) in preparation
>
>
Infrastructure High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009 IX004 No work between magnet and RICH2 smile started
 
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   roll eyes (sarcastic) in preparation
Line: 104 to 104
 
META FILEATTACHMENT attachment="UX0005.doc" attr="" comment="" date="1238437830" name="UX0005.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Desktop\UX0005.doc" size="112640" stream="\\cern.ch\dfs\Users\s\schmidtb\Desktop\UX0005.doc" user="Main.BurkhardSchmidt" version="1"
META FILEATTACHMENT attachment="CE0015.doc" attr="" comment="" date="1239041139" name="CE0015.doc" path="CE0015.doc" size="45056" stream="CE0015.doc" user="Main.RolfLindner" version="1"
META FILEATTACHMENT attachment="IT0007.doc" attr="" comment="Inner Tracker work week 32-33" date="1249646248" name="IT0007.doc" path="IT0007.doc" size="111104" stream="IT0007.doc" user="Main.EricThomas" version="1"
Added:
>
>
META FILEATTACHMENT attachment="High-Fog-OT-work_statement.docx" attr="" comment="High Fog installation over OT bridge" date="1249973243" name="High-Fog-OT-work_statement.docx" path="High-Fog-OT-work statement.docx" size="37936" stream="High-Fog-OT-work statement.docx" user="Main.EricThomas" version="1"

Revision 1202009-08-07 - EricThomas

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 90 to 90
 
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   big grin done
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   roll eyes (sarcastic) in preparation
Safety High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009   No work between magnet and RICH2 roll eyes (sarcastic) in preparation
Changed:
<
<
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009     roll eyes (sarcastic) in preparation
>
>
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009 IT0007   roll eyes (sarcastic) in preparation
 
Line: 103 to 103
 
META FILEATTACHMENT attachment="UX0004.doc" attr="" comment="" date="1234861409" name="UX0004.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0004.doc" size="113664" stream="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0004.doc" user="Main.BurkhardSchmidt" version="1"
META FILEATTACHMENT attachment="UX0005.doc" attr="" comment="" date="1238437830" name="UX0005.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Desktop\UX0005.doc" size="112640" stream="\\cern.ch\dfs\Users\s\schmidtb\Desktop\UX0005.doc" user="Main.BurkhardSchmidt" version="1"
META FILEATTACHMENT attachment="CE0015.doc" attr="" comment="" date="1239041139" name="CE0015.doc" path="CE0015.doc" size="45056" stream="CE0015.doc" user="Main.RolfLindner" version="1"
Added:
>
>
META FILEATTACHMENT attachment="IT0007.doc" attr="" comment="Inner Tracker work week 32-33" date="1249646248" name="IT0007.doc" path="IT0007.doc" size="111104" stream="IT0007.doc" user="Main.EricThomas" version="1"

Revision 1192009-08-05 - FredericBlanc

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 90 to 90
 
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   big grin done
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   roll eyes (sarcastic) in preparation
Safety High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009   No work between magnet and RICH2 roll eyes (sarcastic) in preparation
Added:
>
>
Inner Tracker Repair cables in RMS patch panel F. Blanc 6 August 2009 13 August 2009     roll eyes (sarcastic) in preparation
 

Revision 1182009-08-04 - EricThomas

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 89 to 89
 
PS Change of the PS VFE LV patch panels Pascal PERRET 26 June 2009 6 July 2009 CP0012   big grin done
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   big grin done
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   roll eyes (sarcastic) in preparation
Added:
>
>
Safety High Fog OT phase 1 E. Thomas 10 August 2009 14 August 2009   No work between magnet and RICH2 roll eyes (sarcastic) in preparation
 

Revision 1172009-08-03 - EricThomas

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 82 to 82
 
Infrastructure Installation of access under balcony C. Fournier 28 April 2009 29 May 2009 IX0005   big grin done
HCAL REPLACEMENT RADSOURCE CASSETTE R. Dzhelyadin 22 May 2009 22 May 2009 HC0004 ~ 3h big grin done
Magnet EPDM insertion between upstream coil support and coil C. Fournier 25 May 2009 29 May 2009 MX0002   big grin done
Changed:
<
<
Infrastructure ABSOLUTE GRAVITY MEASUREMENTS S. Guillaume 29 June 2009 30 June 2009 IX0006 UX85A, close to PZ roll eyes (sarcastic) in preparation
>
>
Infrastructure ABSOLUTE GRAVITY MEASUREMENTS S. Guillaume 29 June 2009 30 June 2009 IX0006 UX85A, close to PZ big grin done
 
SPD CALO SPD CONTROL CABLE REPARATION P. Perret 3 June 2009 4 June 2009 CP0011 needed vertical nacelle big grin done
ECAL Opening ECAL A-side Robert Kristic 19 June 2009 19 June 2009 CE0017   big grin done
ECAL Install modified integrators on ECAL A-side Irina Machikhiliyan 19 June 2009 22 June 2009 CE0018   big grin done

Revision 1162009-07-08 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 55 to 55
 
ECAL INSTALLATION OF HV-BOXES ON A-SIDE Irina Machikhiliyan 16 February 2009 20 February 2009 CE0011   big grin done
Muon PERPARATION/MODIFICATION OF CALBING FOR CHAMBERS OF REGION R1 AND R2 B. Schmidt, A. Cardini 26 January 2009 24 Mars 2009 UX0003   big grin done
Muon INSTALLATION OF LONG ALIGNMENT BARS FOR STATION M1 B. Schmidt, Th. Schneider 17 February 2009 02 Mars 2009 UX0004 yellow nacelle big grin done
Changed:
<
<
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   big grin done
>
>
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation http://lhcb-tech-coor.web.cern.ch/lhcb-tech-coor/Task_description/M1_closing.wmv big grin done
 
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   big grin done
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center big grin done
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0004   big grin done
Line: 86 to 86
 
SPD CALO SPD CONTROL CABLE REPARATION P. Perret 3 June 2009 4 June 2009 CP0011 needed vertical nacelle big grin done
ECAL Opening ECAL A-side Robert Kristic 19 June 2009 19 June 2009 CE0017   big grin done
ECAL Install modified integrators on ECAL A-side Irina Machikhiliyan 19 June 2009 22 June 2009 CE0018   big grin done
Changed:
<
<
PS Change of the PS VFE LV patch panels Pascal PERRET 26 June 2009 6 July 2009 CP0012   roll eyes (sarcastic) in preparation
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   roll eyes (sarcastic) in preparation
>
>
PS Change of the PS VFE LV patch panels Pascal PERRET 26 June 2009 6 July 2009 CP0012   big grin done
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   big grin done
 
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   roll eyes (sarcastic) in preparation

Revision 1152009-07-03 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 27 to 27
 
Calorimeter Change of Turbine HCAL side A R. Kristic 13 January 2009 13 January 2009 CE0001   big grin done
Infrastructure Scaffolding for RMS measurements B. Corajod 12 January 2009 14 January 2009 IX0001 scaffolding big grin done
Muon PERPARATION FOR/AND INSTALLATION OF CHAMBER SUPPORTS, MODIFICATION TO FLEXIBLE GAS PIPES B. Schmidt, A. Cardini 13 January 2009 20 February 2009 UX0001 yellow resp. white nacelle big grin done
Changed:
<
<
Muon FINALIZATION OF AIR COOLING STATIONS M2-M5 B. Schmdt 13 January 2009 20 February 2009 UX0002   smile started
>
>
Muon FINALIZATION OF AIR COOLING STATIONS M2-M5 B. Schmdt 13 January 2009 20 February 2009 UX0002   big grin done
 
RICH 2 Check of the gas tighness of the gas enclosure of the RCH2 C. Frei 06 January 2009 26 February 2009 RD0001   big grin done
RICH 1 Installation of the Lower Photon Funnel on the RICH1 detector C. Frei 02 February 2009 06 February 2009 RU0003   big grin done
Outer Tracker Installation of a new access platform close to the magnet which will replace the existing one C. Fournier 12 January 2009 06 March 2009 TO0001 green nacelle big grin done
Line: 88 to 88
 
ECAL Install modified integrators on ECAL A-side Irina Machikhiliyan 19 June 2009 22 June 2009 CE0018   big grin done
PS Change of the PS VFE LV patch panels Pascal PERRET 26 June 2009 6 July 2009 CP0012   roll eyes (sarcastic) in preparation
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   roll eyes (sarcastic) in preparation
Added:
>
>
VELO - Changing pressure and temperature sensors Eddy Jans 6 July 2009 10 July 2009 TV0003   roll eyes (sarcastic) in preparation
 

Revision 1142009-06-30 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
>
>
 
  • 22 Jun 2009 - 06 Jul 2009 - 09:00-18:00 Outer Tracker: Heating
Deleted:
<
<
  • 19 Jun 2009 - 22 Jun 2009 - 09:15-18:00 ECAL: Install integrators
 
  • 06 Jul 2009 - 06 Jul 2009 - 09:00-12:00 Beam pipe Remove protection behind RICH 2
  • 06 Jul 2009 - 07 Jul 2009 - 09:15-18:00 M1:closing M1 and survey
  • 27 Jul 2009 - 28 Jul 2009 - 08:00-18:00 Magnet powering, survey RICH 1 & TT
Deleted:
<
<
  • 22 Jun 2009 - 23 Jun 2009 - 09:00-17:00 RICH 1 : Survey
 
  • 07 Jul 2009 - 10 Jul 2009 - 09:00-17:00 Inner Tracker: Survey
  • 29 Jun 2009 - 30 Jun 2009 - 00:00-24:00 Others: ABSOLUTE GRAVITY MEASUREMENTS
  • 22 Jul 2009 - 22 Jul 2009 - 08:00-18:00 FB exercise in PZ85 shaft

Revision 1132009-06-25 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 32 to 32
 
Muon FINALIZATION OF AIR COOLING STATIONS M2-M5 B. Schmdt 13 January 2009 20 February 2009 UX0002   smile started
RICH 2 Check of the gas tighness of the gas enclosure of the RCH2 C. Frei 06 January 2009 26 February 2009 RD0001   big grin done
RICH 1 Installation of the Lower Photon Funnel on the RICH1 detector C. Frei 02 February 2009 06 February 2009 RU0003   big grin done
Changed:
<
<
Outer Tracker Installation of a new access platform close to the magnet which will replace the existing one C. Fournier 12 January 2009 06 March 2009 TO0001 green nacelle smile started
>
>
Outer Tracker Installation of a new access platform close to the magnet which will replace the existing one C. Fournier 12 January 2009 06 March 2009 TO0001 green nacelle big grin done
 
Inner Tracker TEST SERVICE BOXES ON IT-1C AND IT-3C F. Blanc 16 January 2009 20 January 2009 TI0001   big grin done
VELO Work on the cooling system close to the VELO E. Jans 05 January 2009 16 January 2009 TV0001 scaffolding big grin done
Calorimeter Access to HCAL/C to commission CW/PMT Iouri Guz 16 January 2009 20 January 2009 CE0002 yello nacelle big grin done
Line: 55 to 55
 
RICH 1 Installation of the Upper Photon Funnel Christoph Frei 16 February 2009 25 February 2009 RU0005 Green Nacelle big grin done
PS Tuning of LED light pulse hight on PS Evgeny GUSHCHIN 10 February 2009 17 February 2009 CP0006 Green nacelle big grin done
ECAL INSTALLATION OF HV-BOXES ON A-SIDE Irina Machikhiliyan 16 February 2009 20 February 2009 CE0011   big grin done
Changed:
<
<
Muon PERPARATION/MODIFICATION OF CALBING FOR CHAMBERS OF REGION R1 AND R2 B. Schmidt, A. Cardini 26 January 2009 24 Mars 2009 UX0003   smile started
>
>
Muon PERPARATION/MODIFICATION OF CALBING FOR CHAMBERS OF REGION R1 AND R2 B. Schmidt, A. Cardini 26 January 2009 24 Mars 2009 UX0003   big grin done
 
Muon INSTALLATION OF LONG ALIGNMENT BARS FOR STATION M1 B. Schmidt, Th. Schneider 17 February 2009 02 Mars 2009 UX0004 yellow nacelle big grin done
Changed:
<
<
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   smile started
>
>
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   big grin done
 
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   big grin done
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center big grin done
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0004   big grin done
Line: 86 to 86
 
Magnet EPDM insertion between upstream coil support and coil C. Fournier 25 May 2009 29 May 2009 MX0002   big grin done
Infrastructure ABSOLUTE GRAVITY MEASUREMENTS S. Guillaume 29 June 2009 30 June 2009 IX0006 UX85A, close to PZ roll eyes (sarcastic) in preparation
SPD CALO SPD CONTROL CABLE REPARATION P. Perret 3 June 2009 4 June 2009 CP0011 needed vertical nacelle big grin done
Changed:
<
<
Calorimeter Opening ECAL A-side Robert Kristic 19 June 2009 19 June 2009 CE0017   big grin done
Calorimeter Install modified integrators on ECAL A-side Irina Machikhiliyan 19 June 2009 22 June 2009 CE0018   smile started
>
>
ECAL Opening ECAL A-side Robert Kristic 19 June 2009 19 June 2009 CE0017   big grin done
ECAL Install modified integrators on ECAL A-side Irina Machikhiliyan 19 June 2009 22 June 2009 CE0018   big grin done
PS Change of the PS VFE LV patch panels Pascal PERRET 26 June 2009 6 July 2009 CP0012   roll eyes (sarcastic) in preparation
ECAL INSTALLATION OF INTEGRATORS, ECAL C-SIDE Irina Machikhiliyan 2 July 2009 6 July 2009 CE0019   roll eyes (sarcastic) in preparation
 

Revision 1122009-06-23 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Changed:
<
<
  • 23 Jun 2009 - 05 Jul 2009 - 08:00-18:00 Outer Tracker: heating
>
>
  • 22 Jun 2009 - 06 Jul 2009 - 09:00-18:00 Outer Tracker: Heating
  • 19 Jun 2009 - 22 Jun 2009 - 09:15-18:00 ECAL: Install integrators
 
  • 06 Jul 2009 - 06 Jul 2009 - 09:00-12:00 Beam pipe Remove protection behind RICH 2
  • 06 Jul 2009 - 07 Jul 2009 - 09:15-18:00 M1:closing M1 and survey
  • 27 Jul 2009 - 28 Jul 2009 - 08:00-18:00 Magnet powering, survey RICH 1 & TT
Line: 85 to 86
 
Magnet EPDM insertion between upstream coil support and coil C. Fournier 25 May 2009 29 May 2009 MX0002   big grin done
Infrastructure ABSOLUTE GRAVITY MEASUREMENTS S. Guillaume 29 June 2009 30 June 2009 IX0006 UX85A, close to PZ roll eyes (sarcastic) in preparation
SPD CALO SPD CONTROL CABLE REPARATION P. Perret 3 June 2009 4 June 2009 CP0011 needed vertical nacelle big grin done
Added:
>
>
Calorimeter Opening ECAL A-side Robert Kristic 19 June 2009 19 June 2009 CE0017   big grin done
Calorimeter Install modified integrators on ECAL A-side Irina Machikhiliyan 19 June 2009 22 June 2009 CE0018   smile started
 

Revision 1112009-06-22 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Deleted:
<
<
  • 06 Jul 2009 - 07 Jul 2009 - 09:15-18:00 M1:closing M1 and survey
  • 06 Jul 2009 - 06 Jul 2009 - 09:00-12:00 Beam pipe: Remove protection behind RICH 2
 
  • 23 Jun 2009 - 05 Jul 2009 - 08:00-18:00 Outer Tracker: heating
Added:
>
>
  • 06 Jul 2009 - 06 Jul 2009 - 09:00-12:00 Beam pipe Remove protection behind RICH 2
  • 06 Jul 2009 - 07 Jul 2009 - 09:15-18:00 M1:closing M1 and survey
  • 27 Jul 2009 - 28 Jul 2009 - 08:00-18:00 Magnet powering, survey RICH 1 & TT
  • 22 Jun 2009 - 23 Jun 2009 - 09:00-17:00 RICH 1 : Survey
  • 07 Jul 2009 - 10 Jul 2009 - 09:00-17:00 Inner Tracker: Survey
 
  • 29 Jun 2009 - 30 Jun 2009 - 00:00-24:00 Others: ABSOLUTE GRAVITY MEASUREMENTS
  • 22 Jul 2009 - 22 Jul 2009 - 08:00-18:00 FB exercise in PZ85 shaft

Revision 1102009-06-19 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Changed:
<
<
  • 25 May 2009 - 09 Jun 2009 - 08:00-17:00 RICH 1: lower shielding fixation
  • 20 May 2009 - 05 Jun 2009 - 08:00-18:00 Outer Tracker: heating
  • 05 Jun 2009 - 07 Jun 2009 - 17:00-24:00 UX85B closed, prepare TED run
  • 06 Jun 2009 - 07 Jun 2009 - 00:00-24:00 TED run, UX85B closed
  • 08 Jun 2009 - 08 Jun 2009 - 00:00-21:00 radiation survey, UX85B closed
>
>
  • 06 Jul 2009 - 07 Jul 2009 - 09:15-18:00 M1:closing M1 and survey
  • 06 Jul 2009 - 06 Jul 2009 - 09:00-12:00 Beam pipe: Remove protection behind RICH 2
  • 23 Jun 2009 - 05 Jul 2009 - 08:00-18:00 Outer Tracker: heating
 
  • 29 Jun 2009 - 30 Jun 2009 - 00:00-24:00 Others: ABSOLUTE GRAVITY MEASUREMENTS
  • 22 Jul 2009 - 22 Jul 2009 - 08:00-18:00 FB exercise in PZ85 shaft

Revision 1092009-06-11 - EricThomas

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 11 to 11
 
  • 06 Jun 2009 - 07 Jun 2009 - 00:00-24:00 TED run, UX85B closed
  • 08 Jun 2009 - 08 Jun 2009 - 00:00-21:00 radiation survey, UX85B closed
  • 29 Jun 2009 - 30 Jun 2009 - 00:00-24:00 Others: ABSOLUTE GRAVITY MEASUREMENTS
Added:
>
>
  • 22 Jul 2009 - 22 Jul 2009 - 08:00-18:00 FB exercise in PZ85 shaft
 

<!-- /editTable -->

Revision 1082009-06-05 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Changed:
<
<
  • 29 May 2009 - 03 Jun 2009 - 08:00-17:00 Magnet: EPDM between coil and support
  • 25 May 2009 - 04 Jun 2009 - 08:00-17:00 RICH 1: lower shielding fixation
>
>
  • 25 May 2009 - 09 Jun 2009 - 08:00-17:00 RICH 1: lower shielding fixation
 
  • 20 May 2009 - 05 Jun 2009 - 08:00-18:00 Outer Tracker: heating
Changed:
<
<
  • 29 May 2009 - 29 May 2009 - 12:00-24:00 DSO test, UX85B closed
  • 30 May 2009 - 01 Jun 2009 - 05:00-24:00 DSO test UX85B closed
  • 05 Jun 2009 - 07 Jun 2009 - 18:00-24:00 UX85B closed, prepare TED run
>
>
  • 05 Jun 2009 - 07 Jun 2009 - 17:00-24:00 UX85B closed, prepare TED run
 
  • 06 Jun 2009 - 07 Jun 2009 - 00:00-24:00 TED run, UX85B closed
Changed:
<
<
  • 08 Jun 2009 - 08 Jun 2009 - 00:00-12:00 radiation survey, UX85B closed
>
>
  • 08 Jun 2009 - 08 Jun 2009 - 00:00-21:00 radiation survey, UX85B closed
  • 29 Jun 2009 - 30 Jun 2009 - 00:00-24:00 Others: ABSOLUTE GRAVITY MEASUREMENTS
 

<!-- /editTable -->
<!--edittable1-->
Line: 77 to 76
 
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     big grin done
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 big grin done
Tracker Turicensis Exchange TT modules and work on service boxes Jeroen van Tilburg 29 June 2015 03 July 2009 TT0002   roll eyes (sarcastic) in preparation
Changed:
<
<
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009 DD0001   roll eyes (sarcastic) in preparation
Infrastructure Installation of access under balcony C. Fournier 28 April 2009 29 May 2009 IX0005   smile started
HCAL REPLACEMENT RADSOURCE CASSETTE R. Dzhelyadin 22 May 2009 22 May 2009 HC0004 ~ 3h roll eyes (sarcastic) in preparation
Magnet EPDM insertion between upstream coil support and coil C. Fournier 25 May 2009 29 May 2009 MX0002   roll eyes (sarcastic) in preparation
>
>
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009 DD0001   big grin done
Infrastructure Installation of access under balcony C. Fournier 28 April 2009 29 May 2009 IX0005   big grin done
HCAL REPLACEMENT RADSOURCE CASSETTE R. Dzhelyadin 22 May 2009 22 May 2009 HC0004 ~ 3h big grin done
Magnet EPDM insertion between upstream coil support and coil C. Fournier 25 May 2009 29 May 2009 MX0002   big grin done
Infrastructure ABSOLUTE GRAVITY MEASUREMENTS S. Guillaume 29 June 2009 30 June 2009 IX0006 UX85A, close to PZ roll eyes (sarcastic) in preparation
SPD CALO SPD CONTROL CABLE REPARATION P. Perret 3 June 2009 4 June 2009 CP0011 needed vertical nacelle big grin done
 

Revision 1072009-06-02 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Changed:
<
<
  • 25 May 2009 - 28 May 2009 - 09:00-19:00 Magnet: EPDM between coil and support
  • 29 May 2009 - 29 May 2009 - 08:00-12:00 Magnet: EPDM between coil and support
  • 25 May 2009 - 28 May 2009 - 08:00-17:00 RICH 1: lower shielding fixation
  • 29 May 2009 - 29 May 2009 - 08:00-12:00 RICH 1: lower shielding fixation
>
>
  • 29 May 2009 - 03 Jun 2009 - 08:00-17:00 Magnet: EPDM between coil and support
  • 25 May 2009 - 04 Jun 2009 - 08:00-17:00 RICH 1: lower shielding fixation
 
  • 20 May 2009 - 05 Jun 2009 - 08:00-18:00 Outer Tracker: heating
  • 29 May 2009 - 29 May 2009 - 12:00-24:00 DSO test, UX85B closed
  • 30 May 2009 - 01 Jun 2009 - 05:00-24:00 DSO test UX85B closed
Changed:
<
<
  • 05 Jun 2009 - 07 Jun 2009 - 18:00-24:00 DSO test UX85B closed
  • 06 Jun 2009 - 07 Jun 2009 - 00:00-24:00 TED run UX85B closed
  • 08 Jun 2009 - 08 Jun 2009 - 00:00-12:00 TED run UX85B closed
>
>
  • 05 Jun 2009 - 07 Jun 2009 - 18:00-24:00 UX85B closed, prepare TED run
  • 06 Jun 2009 - 07 Jun 2009 - 00:00-24:00 TED run, UX85B closed
  • 08 Jun 2009 - 08 Jun 2009 - 00:00-12:00 radiation survey, UX85B closed
 

<!-- /editTable -->
<!--edittable1-->

Revision 1062009-05-25 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Changed:
<
<
  • 28 Apr 2009 - 08 May 2009 - 09:00-19:00 OT: Scanning T2 side A.
  • 07 May 2009 - 07 May 2009 - 08:00-18:00 Infrastructure: TEST AUG & DSS, no work in the cavern.
  • 08 May 2009 - 08 May 2009 - 08:00-18:00 Infrastructure: Maintenance of transformer, no electricity for the experiment
  • 13 May 2009 - 15 May 2009 - 08:00-18:00 MOEDAL: Preparation work
  • 13 May 2009 - 15 May 2009 - 08:00-18:00 RICH 1: lower shielding fixation
  • 29 April 2009 - 20 May 2009 - 08:00-18:00 Infrastructure: Access to Balcony racks from below
>
>
  • 25 May 2009 - 28 May 2009 - 09:00-19:00 Magnet: EPDM between coil and support
  • 29 May 2009 - 29 May 2009 - 08:00-12:00 Magnet: EPDM between coil and support
  • 25 May 2009 - 28 May 2009 - 08:00-17:00 RICH 1: lower shielding fixation
  • 29 May 2009 - 29 May 2009 - 08:00-12:00 RICH 1: lower shielding fixation
  • 20 May 2009 - 05 Jun 2009 - 08:00-18:00 Outer Tracker: heating
  • 29 May 2009 - 29 May 2009 - 12:00-24:00 DSO test, UX85B closed
  • 30 May 2009 - 01 Jun 2009 - 05:00-24:00 DSO test UX85B closed
  • 05 Jun 2009 - 07 Jun 2009 - 18:00-24:00 DSO test UX85B closed
  • 06 Jun 2009 - 07 Jun 2009 - 00:00-24:00 TED run UX85B closed
  • 08 Jun 2009 - 08 Jun 2009 - 00:00-12:00 TED run UX85B closed
 

<!-- /editTable -->
<!--edittable1-->
Line: 78 to 82
 
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009 DD0001   roll eyes (sarcastic) in preparation
Infrastructure Installation of access under balcony C. Fournier 28 April 2009 29 May 2009 IX0005   smile started
HCAL REPLACEMENT RADSOURCE CASSETTE R. Dzhelyadin 22 May 2009 22 May 2009 HC0004 ~ 3h roll eyes (sarcastic) in preparation
Added:
>
>
Magnet EPDM insertion between upstream coil support and coil C. Fournier 25 May 2009 29 May 2009 MX0002   roll eyes (sarcastic) in preparation
 

Revision 1052009-05-18 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 77 to 77
 
Tracker Turicensis Exchange TT modules and work on service boxes Jeroen van Tilburg 29 June 2015 03 July 2009 TT0002   roll eyes (sarcastic) in preparation
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009 DD0001   roll eyes (sarcastic) in preparation
Infrastructure Installation of access under balcony C. Fournier 28 April 2009 29 May 2009 IX0005   smile started
Added:
>
>
HCAL REPLACEMENT RADSOURCE CASSETTE R. Dzhelyadin 22 May 2009 22 May 2009 HC0004 ~ 3h roll eyes (sarcastic) in preparation
 

Revision 1042009-05-08 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 9 to 9
 
  • 07 May 2009 - 07 May 2009 - 08:00-18:00 Infrastructure: TEST AUG & DSS, no work in the cavern.
  • 08 May 2009 - 08 May 2009 - 08:00-18:00 Infrastructure: Maintenance of transformer, no electricity for the experiment
  • 13 May 2009 - 15 May 2009 - 08:00-18:00 MOEDAL: Preparation work
Added:
>
>
  • 13 May 2009 - 15 May 2009 - 08:00-18:00 RICH 1: lower shielding fixation
  • 29 April 2009 - 20 May 2009 - 08:00-18:00 Infrastructure: Access to Balcony racks from below
 

<!-- /editTable -->
<!--edittable1-->

Revision 1032009-05-04 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 73 to 73
 
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     big grin done
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 big grin done
Tracker Turicensis Exchange TT modules and work on service boxes Jeroen van Tilburg 29 June 2015 03 July 2009 TT0002   roll eyes (sarcastic) in preparation
Changed:
<
<
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009     roll eyes (sarcastic) in preparation
>
>
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009 DD0001   roll eyes (sarcastic) in preparation
 
Infrastructure Installation of access under balcony C. Fournier 28 April 2009 29 May 2009 IX0005   smile started

Revision 1022009-04-29 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Deleted:
<
<
  • 23 Apr 2009 - 24 Apr 2009 - 09:00-19:00 OT: Installtion of heating blankets.
  • 15 Apr 2009 - 24 Apr 2009 - 09:00-19:00 IT: Repair VCSELs on digitizer boards.
  • 22 Apr 2009 - 22 Apr 2009 - 13:00-16:00 Calorimeter:closing CALO side a for M1 intervention
 
  • 28 Apr 2009 - 08 May 2009 - 09:00-19:00 OT: Scanning T2 side A.
  • 07 May 2009 - 07 May 2009 - 08:00-18:00 Infrastructure: TEST AUG & DSS, no work in the cavern.
  • 08 May 2009 - 08 May 2009 - 08:00-18:00 Infrastructure: Maintenance of transformer, no electricity for the experiment

Revision 1012009-04-28 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 73 to 73
 
ECAL ECAL HV CONTROL BOARD REPLACEMENT A. Konoplyannikov 25 March 2009 25 March 2009 CE0014   big grin done
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access big grin done
Changed:
<
<
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     smile started
>
>
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     big grin done
 
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 big grin done
Tracker Turicensis Exchange TT modules and work on service boxes Jeroen van Tilburg 29 June 2015 03 July 2009 TT0002   roll eyes (sarcastic) in preparation
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009     roll eyes (sarcastic) in preparation
Added:
>
>
Infrastructure Installation of access under balcony C. Fournier 28 April 2009 29 May 2009 IX0005   smile started
 

Revision 1002009-04-27 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 74 to 74
 
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access big grin done
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     smile started
Changed:
<
<
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 big grin done
Tracker Turicensis Exchange TT modules and work on service boxes Jeroen van Tilburg 29 June 2015 3 July 2009     roll eyes (sarcastic) in preparation
>
>
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 big grin done
Tracker Turicensis Exchange TT modules and work on service boxes Jeroen van Tilburg 29 June 2015 03 July 2009 TT0002   roll eyes (sarcastic) in preparation
 
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009     roll eyes (sarcastic) in preparation

Revision 992009-04-27 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 16 to 16
 
<!-- /editTable -->
<!--edittable1-->
Changed:
<
<
  template       TEMPLATE   smile started
>
>
  template       TEMPLATE   roll eyes (sarcastic) in preparation
 
Magnet checking position of coils on supports R. Lindner 12 January 2009 16 January 2009 MX0001   big grin done
Beam Pipe Beam pipe protection removal/installation for M1 survey P. Lepeule 08 January 2009 09 September 2009 VX0001 Protection back on 9.01 at 17:00 big grin done
RICH 1 Photon Funnel, dismount C. Frei 20 January 2009 30 January 2009 RU0001   big grin done
Line: 75 to 75
 
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access big grin done
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     smile started
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 big grin done
Added:
>
>
Tracker Turicensis Exchange TT modules and work on service boxes Jeroen van Tilburg 29 June 2015 3 July 2009     roll eyes (sarcastic) in preparation
 
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009     roll eyes (sarcastic) in preparation

Revision 982009-04-24 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 74 to 74
 
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access big grin done
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     smile started
Changed:
<
<
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 roll eyes (sarcastic) in preparation
>
>
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 big grin done
 
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009     roll eyes (sarcastic) in preparation

Revision 972009-04-22 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 11 to 11
 
  • 28 Apr 2009 - 08 May 2009 - 09:00-19:00 OT: Scanning T2 side A.
  • 07 May 2009 - 07 May 2009 - 08:00-18:00 Infrastructure: TEST AUG & DSS, no work in the cavern.
  • 08 May 2009 - 08 May 2009 - 08:00-18:00 Infrastructure: Maintenance of transformer, no electricity for the experiment
Changed:
<
<
  • 13 May 2009 - 15 May 2009 - 08:00-18:00 MODEAL: Preparation work
>
>
  • 13 May 2009 - 15 May 2009 - 08:00-18:00 MOEDAL: Preparation work
 

<!-- /editTable -->
Changed:
<
<
<!-- /editTable -->
>
>
<!-- /editTable -->
 
Sub detector Task Responsible start_DATE end_DATE Reference COMMENTS STATUS
  template       TEMPLATE   smile started
Magnet checking position of coils on supports R. Lindner 12 January 2009 16 January 2009 MX0001   big grin done
Line: 75 to 75
 
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access big grin done
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     smile started
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 roll eyes (sarcastic) in preparation
Changed:
<
<
MODEAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009     roll eyes (sarcastic) in preparation
>
>
MOEDAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009     roll eyes (sarcastic) in preparation
 

Revision 962009-04-22 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 11 to 11
 
  • 28 Apr 2009 - 08 May 2009 - 09:00-19:00 OT: Scanning T2 side A.
  • 07 May 2009 - 07 May 2009 - 08:00-18:00 Infrastructure: TEST AUG & DSS, no work in the cavern.
  • 08 May 2009 - 08 May 2009 - 08:00-18:00 Infrastructure: Maintenance of transformer, no electricity for the experiment
Added:
>
>
  • 13 May 2009 - 15 May 2009 - 08:00-18:00 MODEAL: Preparation work
 

<!-- /editTable -->
Changed:
<
<
<!-- /editTable -->
>
>
<!-- /editTable -->
 
Sub detector Task Responsible start_DATE end_DATE Reference COMMENTS STATUS
  template       TEMPLATE   smile started
Magnet checking position of coils on supports R. Lindner 12 January 2009 16 January 2009 MX0001   big grin done
Line: 73 to 74
 
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access big grin done
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     smile started
Changed:
<
<
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00  
>
>
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00 roll eyes (sarcastic) in preparation
MODEAL Preparation work D. Lacarrere, R. Soluk 13 May 2009 15 May 2009     roll eyes (sarcastic) in preparation
 

Revision 952009-04-22 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Deleted:
<
<
  • 28 Apr 2009 - 08 May 2009 - 09:00-19:00 OT: Scanning T2 side A.
 
  • 23 Apr 2009 - 24 Apr 2009 - 09:00-19:00 OT: Installtion of heating blankets.
  • 15 Apr 2009 - 24 Apr 2009 - 09:00-19:00 IT: Repair VCSELs on digitizer boards.
Added:
>
>
  • 22 Apr 2009 - 22 Apr 2009 - 13:00-16:00 Calorimeter:closing CALO side a for M1 intervention
  • 28 Apr 2009 - 08 May 2009 - 09:00-19:00 OT: Scanning T2 side A.
 
  • 07 May 2009 - 07 May 2009 - 08:00-18:00 Infrastructure: TEST AUG & DSS, no work in the cavern.
  • 08 May 2009 - 08 May 2009 - 08:00-18:00 Infrastructure: Maintenance of transformer, no electricity for the experiment
Line: 72 to 73
 
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access big grin done
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     smile started
Added:
>
>
Calorimeter Closing of CALO A-side for M1 R. Kristic 22 April 2009 22 April 2009 CE00016 at 13:00  
 

Revision 942009-04-21 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Deleted:
<
<
  • 24 Mar 2009 - 26 Mar 2009 - 09:00-18:00 VELO: Maintenance of the three turbo pumps
  • 26 Mar 2009 - 01 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side C
  • 01 Apr 2009 - 07 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side A
  • 30 Apr 2009 - 04 May 2009 - 08:15-18:00 Infrastructure: Assemble RICH 2 tower (lower part)side C
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2
 
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Changed:
<
<
  • 11 Mar 2009 - 27 Mar 2009 - 09:00-19:00 IT: Tilting mechanism
  • 18 Mar 2009 - 25 Mar 2009 - 09:00-19:00 RICH 2: Exchange of HPDs side C
  • 25 Mar 2009 - 01 Apr 2009 - 09:00-19:00 RICH 2: Exchange of HPDs side A
>
>
  • 28 Apr 2009 - 08 May 2009 - 09:00-19:00 OT: Scanning T2 side A.
  • 23 Apr 2009 - 24 Apr 2009 - 09:00-19:00 OT: Installtion of heating blankets.
  • 15 Apr 2009 - 24 Apr 2009 - 09:00-19:00 IT: Repair VCSELs on digitizer boards.
  • 07 May 2009 - 07 May 2009 - 08:00-18:00 Infrastructure: TEST AUG & DSS, no work in the cavern.
  • 08 May 2009 - 08 May 2009 - 08:00-18:00 Infrastructure: Maintenance of transformer, no electricity for the experiment
 

<!-- /editTable -->
<!--edittable1-->
Changed:
<
<
Inner Tracker Service Box, repair digitizer and add cooling blocks F. Blanc 15 April 2009 24 April 2009 IT006   smile started
>
>
  template       TEMPLATE   smile started
 
Magnet checking position of coils on supports R. Lindner 12 January 2009 16 January 2009 MX0001   big grin done
Beam Pipe Beam pipe protection removal/installation for M1 survey P. Lepeule 08 January 2009 09 September 2009 VX0001 Protection back on 9.01 at 17:00 big grin done
RICH 1 Photon Funnel, dismount C. Frei 20 January 2009 30 January 2009 RU0001   big grin done

Revision 932009-04-15 - FredericBlanc

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 74 to 74
 
ECAL ECAL HV CONTROL BOARD REPLACEMENT A. Konoplyannikov 25 March 2009 25 March 2009 CE0014   big grin done
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access big grin done
Changed:
<
<
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     roll eyes (sarcastic) in preparation
>
>
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     smile started
 

Revision 922009-04-14 - EricThomas

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 17 to 17
 
<!-- /editTable -->
<!--edittable1-->
Changed:
<
<
  TEMPLATE       TEMPLATE    
>
>
Inner Tracker Service Box, repair digitizer and add cooling blocks F. Blanc 15 April 2009 24 April 2009 IT006   smile started
 
Magnet checking position of coils on supports R. Lindner 12 January 2009 16 January 2009 MX0001   big grin done
Beam Pipe Beam pipe protection removal/installation for M1 survey P. Lepeule 08 January 2009 09 September 2009 VX0001 Protection back on 9.01 at 17:00 big grin done
RICH 1 Photon Funnel, dismount C. Frei 20 January 2009 30 January 2009 RU0001   big grin done

Revision 912009-04-14 - PerretPascal

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 73 to 73
 
RICH 1 OPENING THE GAS ENCLOSURE FOR SURVEY AND REPAIRS. B. Cameron 26 March 2009 27 March 2009 RU0007   big grin done
ECAL ECAL HV CONTROL BOARD REPLACEMENT A. Konoplyannikov 25 March 2009 25 March 2009 CE0014   big grin done
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
Changed:
<
<
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access roll eyes (sarcastic) in preparation
>
>
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access big grin done
 
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     roll eyes (sarcastic) in preparation

Revision 902009-04-14 - FredericBlanc

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 64 to 64
 
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   big grin done
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   big grin done
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   big grin done
Changed:
<
<
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   smile started
>
>
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   big grin done
 
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed big grin done
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side big grin done
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side big grin done
Line: 74 to 74
 
ECAL ECAL HV CONTROL BOARD REPLACEMENT A. Konoplyannikov 25 March 2009 25 March 2009 CE0014   big grin done
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access roll eyes (sarcastic) in preparation
Added:
>
>
Inner Tracker Repair VCSELs on digitizer boards F. Blanc 15 April 2009 24 April 2009     roll eyes (sarcastic) in preparation
 

Revision 892009-04-06 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 56 to 56
 
Muon INSTALLATION OF LONG ALIGNMENT BARS FOR STATION M1 B. Schmidt, Th. Schneider 17 February 2009 02 Mars 2009 UX0004 yellow nacelle big grin done
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   smile started
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   big grin done
Changed:
<
<
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center  
>
>
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center big grin done
 
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0004   big grin done
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   big grin done
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   big grin done
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   big grin done
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   big grin done
Changed:
<
<
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
>
>
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   big grin done
 
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   smile started
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed big grin done
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side big grin done
Changed:
<
<
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side smile started
>
>
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side big grin done
 
VELO Maintenance of the three turbo pumps E. Jans 24 March 2009 26 March 2009 TV0002   big grin done
SPD CALO BROKEN CONTROL/CLOCK CABLE Eduardo Picatoste Olloqui 17 March 2009 20 March 2009 CP0010   big grin done
RICH 1 OPENING THE GAS ENCLOSURE FOR SURVEY AND REPAIRS. B. Cameron 26 March 2009 27 March 2009 RU0007   big grin done
ECAL ECAL HV CONTROL BOARD REPLACEMENT A. Konoplyannikov 25 March 2009 25 March 2009 CE0014   big grin done
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
Added:
>
>
ECAL DISMOUNTING OF INTEGRATORS, ECAL C-SIDE I. Machikhiliyan 6 April 2009 20 April 2009 CE00015 2h access roll eyes (sarcastic) in preparation
 
Line: 84 to 85
 
META FILEATTACHMENT attachment="UX0003.doc" attr="" comment="UX0003" date="1234860909" name="UX0003.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0003.doc" size="114176" stream="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0003.doc" user="Main.BurkhardSchmidt" version="1"
META FILEATTACHMENT attachment="UX0004.doc" attr="" comment="" date="1234861409" name="UX0004.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0004.doc" size="113664" stream="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0004.doc" user="Main.BurkhardSchmidt" version="1"
META FILEATTACHMENT attachment="UX0005.doc" attr="" comment="" date="1238437830" name="UX0005.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Desktop\UX0005.doc" size="112640" stream="\\cern.ch\dfs\Users\s\schmidtb\Desktop\UX0005.doc" user="Main.BurkhardSchmidt" version="1"
Added:
>
>
META FILEATTACHMENT attachment="CE0015.doc" attr="" comment="" date="1239041139" name="CE0015.doc" path="CE0015.doc" size="45056" stream="CE0015.doc" user="Main.RolfLindner" version="1"

Revision 882009-03-31 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 66 to 66
 
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   smile started
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed big grin done
Changed:
<
<
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side smile started
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
VELO Maintenance of the three turbo pumps E. Jans 24 March 2009 26 March 2009 TV0002   smile started
>
>
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side big grin done
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side smile started
VELO Maintenance of the three turbo pumps E. Jans 24 March 2009 26 March 2009 TV0002   big grin done
 
SPD CALO BROKEN CONTROL/CLOCK CABLE Eduardo Picatoste Olloqui 17 March 2009 20 March 2009 CP0010   big grin done
Changed:
<
<
RICH 1 OPENING THE GAS ENCLOSURE FOR SURVEY AND REPAIRS. B. Cameron 26 March 2009 27 March 2009 RU0007   roll eyes (sarcastic) in preparation
ECAL ECAL HV CONTROL BOARD REPLACEMENT A. Konoplyannikov 25 March 2009 25 March 2009 CE0014   smile started
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005    
>
>
RICH 1 OPENING THE GAS ENCLOSURE FOR SURVEY AND REPAIRS. B. Cameron 26 March 2009 27 March 2009 RU0007   big grin done
ECAL ECAL HV CONTROL BOARD REPLACEMENT A. Konoplyannikov 25 March 2009 25 March 2009 CE0014   big grin done
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005   smile started
 

Revision 872009-03-30 - BurkhardSchmidt

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 72 to 72
 
SPD CALO BROKEN CONTROL/CLOCK CABLE Eduardo Picatoste Olloqui 17 March 2009 20 March 2009 CP0010   big grin done
RICH 1 OPENING THE GAS ENCLOSURE FOR SURVEY AND REPAIRS. B. Cameron 26 March 2009 27 March 2009 RU0007   roll eyes (sarcastic) in preparation
ECAL ECAL HV CONTROL BOARD REPLACEMENT A. Konoplyannikov 25 March 2009 25 March 2009 CE0014   smile started
Added:
>
>
Muon Replacement of some chambers of Muon stations M2-M5 B. Schmidt 23 March 2009 30 April 2009 UX0005    
 
Line: 82 to 83
 
META FILEATTACHMENT attachment="PPSPS-M1-ChamberInstallation.doc" attr="" comment="PPSPS M1 Chamber Installation" date="1234859770" name="PPSPS-M1-ChamberInstallation.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Documents\PPSPS-M1-ChamberInstallation.doc" size="238080" stream="\\cern.ch\dfs\Users\s\schmidtb\Documents\PPSPS-M1-ChamberInstallation.doc" user="Main.BurkhardSchmidt" version="1"
META FILEATTACHMENT attachment="UX0003.doc" attr="" comment="UX0003" date="1234860909" name="UX0003.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0003.doc" size="114176" stream="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0003.doc" user="Main.BurkhardSchmidt" version="1"
META FILEATTACHMENT attachment="UX0004.doc" attr="" comment="" date="1234861409" name="UX0004.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0004.doc" size="113664" stream="\\cern.ch\dfs\Users\s\schmidtb\Documents\UX0004.doc" user="Main.BurkhardSchmidt" version="1"
Added:
>
>
META FILEATTACHMENT attachment="UX0005.doc" attr="" comment="" date="1238437830" name="UX0005.doc" path="\\cern.ch\dfs\Users\s\schmidtb\Desktop\UX0005.doc" size="112640" stream="\\cern.ch\dfs\Users\s\schmidtb\Desktop\UX0005.doc" user="Main.BurkhardSchmidt" version="1"

Revision 862009-03-25 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 71 to 71
 
VELO Maintenance of the three turbo pumps E. Jans 24 March 2009 26 March 2009 TV0002   smile started
SPD CALO BROKEN CONTROL/CLOCK CABLE Eduardo Picatoste Olloqui 17 March 2009 20 March 2009 CP0010   big grin done
RICH 1 OPENING THE GAS ENCLOSURE FOR SURVEY AND REPAIRS. B. Cameron 26 March 2009 27 March 2009 RU0007   roll eyes (sarcastic) in preparation
Added:
>
>
ECAL ECAL HV CONTROL BOARD REPLACEMENT A. Konoplyannikov 25 March 2009 25 March 2009 CE0014   smile started
 

Revision 852009-03-24 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 66 to 66
 
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   smile started
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed big grin done
Changed:
<
<
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
>
>
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side smile started
 
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
VELO Maintenance of the three turbo pumps E. Jans 24 March 2009 26 March 2009 TV0002   smile started
SPD CALO BROKEN CONTROL/CLOCK CABLE Eduardo Picatoste Olloqui 17 March 2009 20 March 2009 CP0010   big grin done
Added:
>
>
RICH 1 OPENING THE GAS ENCLOSURE FOR SURVEY AND REPAIRS. B. Cameron 26 March 2009 27 March 2009 RU0007   roll eyes (sarcastic) in preparation
 

Revision 842009-03-24 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 65 to 65
 
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   big grin done
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   smile started
Changed:
<
<
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed roll eyes (sarcastic) in preparation
>
>
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed big grin done
 
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
Changed:
<
<
VELO Maintenance of the three turbo pumps E. Jans 24 March 2009 26 March 2009 TV0002   roll eyes (sarcastic) in preparation
SPD CALO BROKEN CONTROL/CLOCK CABLE Eduardo Picatoste Olloqui 17 March 2009 20 March 2009 CP0010   smile started
>
>
VELO Maintenance of the three turbo pumps E. Jans 24 March 2009 26 March 2009 TV0002   smile started
SPD CALO BROKEN CONTROL/CLOCK CABLE Eduardo Picatoste Olloqui 17 March 2009 20 March 2009 CP0010   big grin done
 

Revision 832009-03-23 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 24 Mar 2009 - 26 Mar 2009 - 09:00-18:00 VELO: Maintenance of the three turbo pumps
Deleted:
<
<
  • 17 Mar 2009 - 18 Mar 2009 - 08:00-18:00 Infrastructure: Dismount RICH 2 tower (top part)side A
 
  • 26 Mar 2009 - 01 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side C
  • 01 Apr 2009 - 07 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side A
  • 30 Apr 2009 - 04 May 2009 - 08:15-18:00 Infrastructure: Assemble RICH 2 tower (lower part)side C
Deleted:
<
<
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
 
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
  • 11 Mar 2009 - 27 Mar 2009 - 09:00-19:00 IT: Tilting mechanism
Deleted:
<
<
  • 26 Feb 2009 - 15 Mar 2009 - 09:00-19:00 SPS/PS: TUNING OF LED SYSTEM
 
  • 18 Mar 2009 - 25 Mar 2009 - 09:00-19:00 RICH 2: Exchange of HPDs side C
  • 25 Mar 2009 - 01 Apr 2009 - 09:00-19:00 RICH 2: Exchange of HPDs side A

Revision 822009-03-18 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 73 to 73
 
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
VELO Maintenance of the three turbo pumps E. Jans 24 March 2009 26 March 2009 TV0002   roll eyes (sarcastic) in preparation
Added:
>
>
SPD CALO BROKEN CONTROL/CLOCK CABLE Eduardo Picatoste Olloqui 17 March 2009 20 March 2009 CP0010   smile started
 

Revision 812009-03-16 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 16 to 16
 
  • 11 Mar 2009 - 27 Mar 2009 - 09:00-19:00 IT: Tilting mechanism
  • 26 Feb 2009 - 15 Mar 2009 - 09:00-19:00 SPS/PS: TUNING OF LED SYSTEM
  • 18 Mar 2009 - 25 Mar 2009 - 09:00-19:00 RICH 2: Exchange of HPDs side C
Changed:
<
<
  • 25 Mar 2009 - 01 Apr 2009 - 09:00-19:00 RICH 2: Exchange of HPDs side C
>
>
  • 25 Mar 2009 - 01 Apr 2009 - 09:00-19:00 RICH 2: Exchange of HPDs side A
 

<!-- /editTable -->
<!--edittable1-->

Revision 802009-03-16 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<
  • 16 Mar 2009 - 16 Mar 2009 - 14:00-18:00 Infrastructure: Dismount RICH 2 tower (top part)side A
>
>
  • 24 Mar 2009 - 26 Mar 2009 - 09:00-18:00 VELO: Maintenance of the three turbo pumps
 
  • 17 Mar 2009 - 18 Mar 2009 - 08:00-18:00 Infrastructure: Dismount RICH 2 tower (top part)side A
  • 26 Mar 2009 - 01 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side C
  • 01 Apr 2009 - 07 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side A
Line: 72 to 72
 
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed roll eyes (sarcastic) in preparation
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
Added:
>
>
VELO Maintenance of the three turbo pumps E. Jans 24 March 2009 26 March 2009 TV0002   roll eyes (sarcastic) in preparation
 

Revision 792009-03-13 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 62 to 62
 
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   big grin done
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center  
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0004   big grin done
Changed:
<
<
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   smile started
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   smile started
>
>
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   big grin done
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   big grin done
 
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   big grin done
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   big grin done
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   smile started
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed roll eyes (sarcastic) in preparation
Changed:
<
<
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side  
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side  
>
>
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side roll eyes (sarcastic) in preparation
 

Revision 782009-03-13 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<
  • 16 Mar 2009 - 18 Mar 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (top part)side A
>
>
  • 16 Mar 2009 - 16 Mar 2009 - 14:00-18:00 Infrastructure: Dismount RICH 2 tower (top part)side A
  • 17 Mar 2009 - 18 Mar 2009 - 08:00-18:00 Infrastructure: Dismount RICH 2 tower (top part)side A
 
  • 26 Mar 2009 - 01 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side C
  • 01 Apr 2009 - 07 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side A
  • 30 Apr 2009 - 04 May 2009 - 08:15-18:00 Infrastructure: Assemble RICH 2 tower (lower part)side C
Line: 12 to 13
 
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Added:
>
>
  • 11 Mar 2009 - 27 Mar 2009 - 09:00-19:00 IT: Tilting mechanism
 
  • 26 Feb 2009 - 15 Mar 2009 - 09:00-19:00 SPS/PS: TUNING OF LED SYSTEM
Added:
>
>
  • 18 Mar 2009 - 25 Mar 2009 - 09:00-19:00 RICH 2: Exchange of HPDs side C
  • 25 Mar 2009 - 01 Apr 2009 - 09:00-19:00 RICH 2: Exchange of HPDs side C
 

<!-- /editTable -->
<!--edittable1-->
Line: 66 to 70
 
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   smile started
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed roll eyes (sarcastic) in preparation
Added:
>
>
RICH 2 Replacement of HPD side C C. Frei 18 March 2009 25 March 2009 RD0003 M1 & Calo closed on that side  
RICH 2 Replacement of HPD side A C. Frei 25 March 2009 1 April 2009 RD0003 M1 & Calo closed on that side  
 

Revision 772009-03-13 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 62 to 62
 
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   smile started
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   big grin done
Changed:
<
<
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   smile started
>
>
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   big grin done
 
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   smile started
Added:
>
>
Infrastructure Dismount top level of RICH 2 tower side A C. Fournier 16 March 2009 18 March 2009 IX0004 During operation, OT/IT/M1/PS/SPD closed roll eyes (sarcastic) in preparation
 

Revision 762009-03-12 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<
  • 09 Mar 2009 - 11 Mar 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower side C
>
>
  • 16 Mar 2009 - 18 Mar 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (top part)side A
  • 26 Mar 2009 - 01 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side C
  • 01 Apr 2009 - 07 Apr 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower (lower part)side A
  • 30 Apr 2009 - 04 May 2009 - 08:15-18:00 Infrastructure: Assemble RICH 2 tower (lower part)side C
 
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2

Revision 752009-03-11 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 54 to 54
 
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   smile started
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   big grin done
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center  
Changed:
<
<
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0005   big grin done
>
>
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0004   big grin done
 
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   smile started
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   smile started
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   big grin done
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   smile started
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
Changed:
<
<
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009     roll eyes (sarcastic) in preparation
>
>
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009 TI0005   smile started
 

Revision 742009-03-10 - FredericBlanc

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 61 to 61
 
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   big grin done
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   smile started
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
Added:
>
>
Inner Tracker Install Service Box tilting F Blanc 11 March 2009 27 March 2009     roll eyes (sarcastic) in preparation
 

Revision 732009-03-10 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 9 to 9
 
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Changed:
<
<
>
>
  • 26 Feb 2009 - 15 Mar 2009 - 09:00-19:00 SPS/PS: TUNING OF LED SYSTEM
 

<!-- /editTable -->
<!--edittable1-->
Line: 60 to 60
 
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   big grin done
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   smile started
Added:
>
>
PS/SPD TUNING OF PS/SPD LED SYSTEM E. GUSHCHIN 26 February 2009 15 March 2009 CP0009   smile started
 

Revision 722009-03-10 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 59 to 59
 
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   smile started
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   big grin done
Changed:
<
<
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   roll eyes (sarcastic) in preparation
>
>
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   smile started
 

Revision 712009-03-09 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Added:
>
>
Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 09 Mar 2009 - 11 Mar 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower side C
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
 

<!-- /editTable -->
<!--edittable1-->
Line: 50 to 58
 
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   smile started
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   smile started
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
Changed:
<
<
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   smile started
>
>
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   big grin done
 
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   roll eyes (sarcastic) in preparation
Deleted:
<
<
Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
 
Deleted:
<
<
  • 26 Feb 2009 - 04 Mar 2009 - 00:00-24:00 No PZ lift
  • 03 Mar 2009 - 04 Mar 2009 - 08:15-18:00 Access Control Maintenance UX85 PAD & MAD
  • 04 Mar 2009 - 06 Mar 2009 - 08:15-18:00 Access Control Maintenance PZ85 PAD & MAD
  • 09 Mar 2009 - 11 Mar 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower side C
  • 27 Feb 2009 - 06 Mar 2009 - 08:15-18:00 RICH: Installation of the LAMS
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
  -- RolfLindner - 05 Jan 2009

Revision 702009-03-06 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 51 to 51
 
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   smile started
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   smile started
Added:
>
>
Infrastructure Dismount 2nd level of RICH 2 tower side C C. Fournier 9 March 2009 11 March 2009 IX0003   roll eyes (sarcastic) in preparation
 

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

Revision 692009-03-05 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 55 to 55
 
Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<
  • 26 Feb 2009 - 08 Mar 2009 - 00:00-24:00 No PZ lift
>
>
  • 26 Feb 2009 - 04 Mar 2009 - 00:00-24:00 No PZ lift
 
  • 03 Mar 2009 - 04 Mar 2009 - 08:15-18:00 Access Control Maintenance UX85 PAD & MAD
  • 04 Mar 2009 - 06 Mar 2009 - 08:15-18:00 Access Control Maintenance PZ85 PAD & MAD
  • 09 Mar 2009 - 11 Mar 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower side C

Revision 682009-03-04 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 58 to 58
 
  • 26 Feb 2009 - 08 Mar 2009 - 00:00-24:00 No PZ lift
  • 03 Mar 2009 - 04 Mar 2009 - 08:15-18:00 Access Control Maintenance UX85 PAD & MAD
  • 04 Mar 2009 - 06 Mar 2009 - 08:15-18:00 Access Control Maintenance PZ85 PAD & MAD
Added:
>
>
  • 09 Mar 2009 - 11 Mar 2009 - 08:15-18:00 Infrastructure: Dismount RICH 2 tower side C
 
  • 27 Feb 2009 - 06 Mar 2009 - 08:15-18:00 RICH: Installation of the LAMS
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W

Revision 672009-03-04 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 55 to 55
 
Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
Changed:
<
<
  • 26 Feb 2009 - 08 Mar 2009 - 00:00-24:00 Nn PZ lift
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2
>
>
  • 26 Feb 2009 - 08 Mar 2009 - 00:00-24:00 No PZ lift
  • 03 Mar 2009 - 04 Mar 2009 - 08:15-18:00 Access Control Maintenance UX85 PAD & MAD
  • 04 Mar 2009 - 06 Mar 2009 - 08:15-18:00 Access Control Maintenance PZ85 PAD & MAD
 
  • 27 Feb 2009 - 06 Mar 2009 - 08:15-18:00 RICH: Installation of the LAMS
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
Added:
>
>
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2
 
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Changed:
<
<
  • 03 Mar 2009 - 06 Mar 2009 - 08:15-18:00 Access Control Maintenance
>
>
 -- RolfLindner - 05 Jan 2009

Revision 662009-03-03 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 50 to 50
 
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   smile started
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   smile started
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
Changed:
<
<
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RU0002   smile started
>
>
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RD0002   smile started
 

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

Revision 652009-03-03 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 53 to 53
 
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RU0002   smile started
Changed:
<
<
Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
>
>
Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
 
Changed:
<
<
  • 26 Feb 2009 - 08 Mar 2009 - 00:00-24:00 NO PZ lift
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation/Modification of cabling region 1 and 2
>
>
  • 26 Feb 2009 - 08 Mar 2009 - 00:00-24:00 Nn PZ lift
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation & Modification of cabling region 1 and 2
 
  • 27 Feb 2009 - 06 Mar 2009 - 08:15-18:00 RICH: Installation of the LAMS
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W

Revision 642009-03-03 - EricThomas

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 61 to 61
 
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
Changed:
<
<
>
>
  • 03 Mar 2009 - 06 Mar 2009 - 08:15-18:00 Access Control Maintenance
 -- RolfLindner - 05 Jan 2009

Revision 632009-03-03 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 11 to 11
 
Beam Pipe Beam pipe protection removal/installation for M1 survey P. Lepeule 08 January 2009 09 September 2009 VX0001 Protection back on 9.01 at 17:00 big grin done
RICH 1 Photon Funnel, dismount C. Frei 20 January 2009 30 January 2009 RU0001   big grin done
RICH 1 REMOVAL OF THE RICH1 UPPER HPD ARRAY B. Cameron 09 January 2009 15 January 2009 RU0002 Handling big grin done
Changed:
<
<
Tracker Turicensis Work on electronics boxes and opening of TT station for film crew J. van Tilburg 09 February 2009 13 February 2009 TT0001 ongoing smile started
>
>
Tracker Turicensis Work on electronics boxes and opening of TT station for film crew J. van Tilburg 09 February 2009 13 February 2009 TT0001 ongoing big grin done
 
Calorimeter Change of Turbine HCAL side A R. Kristic 13 January 2009 13 January 2009 CE0001   big grin done
Infrastructure Scaffolding for RMS measurements B. Corajod 12 January 2009 14 January 2009 IX0001 scaffolding big grin done
Changed:
<
<
Muon PERPARATION FOR/AND INSTALLATION OF CHAMBER SUPPORTS, MODIFICATION TO FLEXIBLE GAS PIPES B. Schmidt, A. Cardini 13 January 2009 20 February 2009 UX0001 yellow resp. white nacelle smile started
>
>
Muon PERPARATION FOR/AND INSTALLATION OF CHAMBER SUPPORTS, MODIFICATION TO FLEXIBLE GAS PIPES B. Schmidt, A. Cardini 13 January 2009 20 February 2009 UX0001 yellow resp. white nacelle big grin done
 
Muon FINALIZATION OF AIR COOLING STATIONS M2-M5 B. Schmdt 13 January 2009 20 February 2009 UX0002   smile started
RICH 2 Check of the gas tighness of the gas enclosure of the RCH2 C. Frei 06 January 2009 26 February 2009 RD0001   big grin done
RICH 1 Installation of the Lower Photon Funnel on the RICH1 detector C. Frei 02 February 2009 06 February 2009 RU0003   big grin done
Line: 42 to 42
 
PS Tuning of LED light pulse hight on PS Evgeny GUSHCHIN 10 February 2009 17 February 2009 CP0006 Green nacelle big grin done
ECAL INSTALLATION OF HV-BOXES ON A-SIDE Irina Machikhiliyan 16 February 2009 20 February 2009 CE0011   big grin done
Muon PERPARATION/MODIFICATION OF CALBING FOR CHAMBERS OF REGION R1 AND R2 B. Schmidt, A. Cardini 26 January 2009 24 Mars 2009 UX0003   smile started
Changed:
<
<
Muon INSTALLATION OF LONG ALIGNMENT BARS FOR STATION M1 B. Schmidt, Th. Schneider 17 February 2009 02 Mars 2009 UX0004 yellow nacelle smile started
>
>
Muon INSTALLATION OF LONG ALIGNMENT BARS FOR STATION M1 B. Schmidt, Th. Schneider 17 February 2009 02 Mars 2009 UX0004 yellow nacelle big grin done
 
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   smile started
Changed:
<
<
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   roll eyes (sarcastic) in preparation
>
>
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   big grin done
 
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center  
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0005   big grin done
Changed:
<
<
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   roll eyes (sarcastic) in preparation
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   roll eyes (sarcastic) in preparation
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   roll eyes (sarcastic) in preparation
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009     roll eyes (sarcastic) in preparation
>
>
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   smile started
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   smile started
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   big grin done
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009 RU0002   smile started
 

Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 26 Feb 2009 - 08 Mar 2009 - 00:00-24:00 NO PZ lift
Changed:
<
<
  • 26 Feb 2009 - 02 Mar 2009 - 08:15-18:00 ECAL: Opening A-side; Beginning of CALO access A-side
>
>
  • 26 Jan 2009 - 24 Mar 2009 - 08:15-18:00 M1: Preparation/Modification of cabling region 1 and 2
 
  • 27 Feb 2009 - 06 Mar 2009 - 08:15-18:00 RICH: Installation of the LAMS
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
Changed:
<
<
  • 27 Mar 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber_installation
>
>
  • 27 Feb 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber installation
  -- RolfLindner - 05 Jan 2009

Revision 622009-02-27 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 53 to 53
 
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009     roll eyes (sarcastic) in preparation
Added:
>
>
Timetable
   <<October >>
Mo
21
Tu
22
We
23
Th
24
Fr
25
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 26 Feb 2009 - 08 Mar 2009 - 00:00-24:00 NO PZ lift
  • 26 Feb 2009 - 02 Mar 2009 - 08:15-18:00 ECAL: Opening A-side; Beginning of CALO access A-side
  • 27 Feb 2009 - 06 Mar 2009 - 08:15-18:00 RICH: Installation of the LAMS
  • 02 Mar 2009 - 13 Mar 2009 - 08:15-18:00 PS: Check of the VFE electronics
  • 27 Mar 2009 - 13 Mar 2009 - 08:15-18:00 ECAL: The installation of PMT/C-W
  • 16 Feb 2009 - 20 Jun 2009 - 09:15-18:00 M1:chamber_installation
  -- RolfLindner - 05 Jan 2009

Revision 612009-02-26 - ChristophFrei

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 16 to 16
 
Infrastructure Scaffolding for RMS measurements B. Corajod 12 January 2009 14 January 2009 IX0001 scaffolding big grin done
Muon PERPARATION FOR/AND INSTALLATION OF CHAMBER SUPPORTS, MODIFICATION TO FLEXIBLE GAS PIPES B. Schmidt, A. Cardini 13 January 2009 20 February 2009 UX0001 yellow resp. white nacelle smile started
Muon FINALIZATION OF AIR COOLING STATIONS M2-M5 B. Schmdt 13 January 2009 20 February 2009 UX0002   smile started
Changed:
<
<
RICH 2 Check of the gas tighness of the gas enclosure of the RCH2 C. Frei 06 January 2009 26 February 2009 RD0001   smile started
>
>
RICH 2 Check of the gas tighness of the gas enclosure of the RCH2 C. Frei 06 January 2009 26 February 2009 RD0001   big grin done
 
RICH 1 Installation of the Lower Photon Funnel on the RICH1 detector C. Frei 02 February 2009 06 February 2009 RU0003   big grin done
Outer Tracker Installation of a new access platform close to the magnet which will replace the existing one C. Fournier 12 January 2009 06 March 2009 TO0001 green nacelle smile started
Inner Tracker TEST SERVICE BOXES ON IT-1C AND IT-3C F. Blanc 16 January 2009 20 January 2009 TI0001   big grin done
Line: 50 to 50
 
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   roll eyes (sarcastic) in preparation
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   roll eyes (sarcastic) in preparation
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   roll eyes (sarcastic) in preparation
Added:
>
>
RICH 2 Installation of the LAMS Didier Piedigrossi 27 February 2009 6 March 2009     roll eyes (sarcastic) in preparation
 

Revision 602009-02-26 - FredericBlanc

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 46 to 46
 
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   smile started
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   roll eyes (sarcastic) in preparation
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center  
Changed:
<
<
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0005   roll eyes (sarcastic) in preparation
>
>
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0005   big grin done
 
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   roll eyes (sarcastic) in preparation
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   roll eyes (sarcastic) in preparation
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   roll eyes (sarcastic) in preparation

Revision 592009-02-26 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 49 to 49
 
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0005   roll eyes (sarcastic) in preparation
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   roll eyes (sarcastic) in preparation
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   roll eyes (sarcastic) in preparation
Added:
>
>
SPD Cable extension for a control clock cable of the SPD Eduardo Picatoste Olloqui 26 February 2009 27 February 2009 CP0008   roll eyes (sarcastic) in preparation
 

Revision 582009-02-26 - PerretPascal

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 40 to 40
 
RICH 1 Installation of trolley with the HPD array B. Cameron 11 February 2009 12 February 2009 RU0004   big grin done
RICH 1 Installation of the Upper Photon Funnel Christoph Frei 16 February 2009 25 February 2009 RU0005 Green Nacelle big grin done
PS Tuning of LED light pulse hight on PS Evgeny GUSHCHIN 10 February 2009 17 February 2009 CP0006 Green nacelle big grin done
Changed:
<
<
ECAL INSTALLATION OF HV-BOXES ON A-SIDE Irina Machikhiliyan 16 February 2009 20 February 2009 CE0011   smile started
>
>
ECAL INSTALLATION OF HV-BOXES ON A-SIDE Irina Machikhiliyan 16 February 2009 20 February 2009 CE0011   big grin done
 
Muon PERPARATION/MODIFICATION OF CALBING FOR CHAMBERS OF REGION R1 AND R2 B. Schmidt, A. Cardini 26 January 2009 24 Mars 2009 UX0003   smile started
Muon INSTALLATION OF LONG ALIGNMENT BARS FOR STATION M1 B. Schmidt, Th. Schneider 17 February 2009 02 Mars 2009 UX0004 yellow nacelle smile started
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   smile started
Line: 48 to 48
 
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center  
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0005   roll eyes (sarcastic) in preparation
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   roll eyes (sarcastic) in preparation
Changed:
<
<
PS Check of the VFE electronics I. Machikhiliyan 02 March 2009 13 March 2009 CP0007   roll eyes (sarcastic) in preparation
>
>
PS Check of the VFE electronics P.Perret 02 March 2009 13 March 2009 CP0007   roll eyes (sarcastic) in preparation
 

Revision 572009-02-25 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 47 to 47
 
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   roll eyes (sarcastic) in preparation
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center  
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0005   roll eyes (sarcastic) in preparation
Changed:
<
<
               
>
>
Calorimeter The installation of PMT/C-W Irina Machikhiliyan 27 February 2009 13 March 2009 CE0013   roll eyes (sarcastic) in preparation
PS Check of the VFE electronics I. Machikhiliyan 02 March 2009 13 March 2009 CP0007   roll eyes (sarcastic) in preparation
 

Revision 562009-02-24 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 46 to 46
 
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   smile started
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   roll eyes (sarcastic) in preparation
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center  
Changed:
<
<
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0004   roll eyes (sarcastic) in preparation
>
>
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0005   roll eyes (sarcastic) in preparation
               
 

Revision 552009-02-24 - FredericBlanc

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 46 to 46
 
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation   smile started
RICH 1 HPD array to the detector C-side B. Cameron 25 February 2009 26 February 2009 RU0006   roll eyes (sarcastic) in preparation
ECAL Opening A-side; Beginning of CALO access A-side R. Kristic 26 February 2009 02 March 2009 CE0012 green nacelle in center  
Added:
>
>
Inner Tracker Repair electronics on IT-2A F. Blanc 25 February 2009 27 February 2009 TI0004   roll eyes (sarcastic) in preparation
 

Revision 542009-02-24 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="LHCbTechnicalCoordination"

Shutdown activities

Sub detectors

Line: 11 to 11
 
Beam Pipe Beam pipe protection removal/installation for M1 survey P. Lepeule 08 January 2009 09 September 2009 VX0001 Protection back on 9.01 at 17:00 big grin done
RICH 1 Photon Funnel, dismount C. Frei 20 January 2009 30 January 2009 RU0001   big grin done
RICH 1 REMOVAL OF THE RICH1 UPPER HPD ARRAY B. Cameron 09 January 2009 15 January 2009 RU0002 Handling big grin done
Changed:
<
<
Tracker Turicensis Work on electronics boxes and opening of TT station for film crew J. van Tilburg 09 February 2009 13 February 2009 TT0001   roll eyes (sarcastic) in preparation
>
>
Tracker Turicensis Work on electronics boxes and opening of TT station for film crew J. van Tilburg 09 February 2009 13 February 2009 TT0001 ongoing smile started
 
Calorimeter Change of Turbine HCAL side A R. Kristic 13 January 2009 13 January 2009 CE0001   big grin done
Infrastructure Scaffolding for RMS measurements B. Corajod 12 January 2009 14 January 2009 IX0001 scaffolding big grin done
Muon PERPARATION FOR/AND INSTALLATION OF CHAMBER SUPPORTS, MODIFICATION TO FLEXIBLE GAS PIPES B. Schmidt, A. Cardini 13 January 2009 20 February 2009 UX0001 yellow resp. white nacelle smile started
Muon FINALIZATION OF AIR COOLING STATIONS M2-M5 B. Schmdt 13 January 2009 20 February 2009 UX0002   smile started
RICH 2 Check of the gas tighness of the gas enclosure of the RCH2 C. Frei 06 January 2009 26 February 2009 RD0001   smile started
RICH 1 Installation of the Lower Photon Funnel on the RICH1 detector C. Frei 02 February 2009 06 February 2009 RU0003   big grin done
Changed:
<
<
Outer Tracker Installation of a new access platform close to the magnet which will replace the existing one C. Fournier 12 January 2009 27 February 2009 TO0001 green nacelle smile started
>
>
Outer Tracker Installation of a new access platform close to the magnet which will replace the existing one C. Fournier 12 January 2009 06 March 2009 TO0001 green nacelle smile started
 
Inner Tracker TEST SERVICE BOXES ON IT-1C AND IT-3C F. Blanc 16 January 2009 20 January 2009 TI0001   big grin done
VELO Work on the cooling system close to the VELO E. Jans 05 January 2009 16 January 2009 TV0001 scaffolding big grin done
Calorimeter Access to HCAL/C to commission CW/PMT Iouri Guz 16 January 2009 20 January 2009 CE0002 yello nacelle big grin done
Line: 30 to 30
 
Calorimeter Check of the PS VFE electronics P.Perret 22 January 2009 06 February 2009 CE0005   big grin done
Calorimeter The installation of PMT/C-W I. Machikhiliyan 26 January 2009 06 February 2009 CE0006 yellow nacelle big grin done
Calorimeter Work on Calorimeter front-end electronics Frédéric Machefert 22 January 2009 22 January 2009 CE0007 Work on Calo platform big grin done
Changed:
<
<
Infrastructure Bunker extension access on side C and A C. Fournier 26 January 2009 14 February 2009 IX0002 Access on bunker extension restricted smile started
>
>
Infrastructure Bunker extension access on side C and A C. Fournier 26 January 2009 14 February 2009 IX0002 Access on bunker extension restricted big grin done
 
Calorimeter TUNING OF LED SYSTEM Evgeny Gushchin 21 January 2009 09 February 2009 CE0008 Green nacelle, ECAL platform & RCH 2 tower big grin done
Calorimeter CALO SPD VFE 2 REPAIR E. P. Olloqui 27 January 2009 30 January 2009 CE0009 M1 closed on C-side big grin done
Changed:
<
<
Outer Tracker INSTALL HEATING BLANKETS ON T2-Q02-VX A. Pellegrino 03 February 2009 20 February 2009 TO0003 heating T2-Q02-VX for about 10 days smile started
>
>
Outer Tracker INSTALL HEATING BLANKETS ON T2-Q02-VX A. Pellegrino 03 February 2009 20 February 2009 TO0003 heating T2-Q02-VX for about 10 days big grin done
 
Calorimeter COMMISSIONING OF ECAL C-SIDE I. Machikhiliyan 02 February 2009 06 February 2009 CE0010 Yellow Nacelle big grin done
HCAL swap 2 cables of CW/PMT in the central part Iouri Guz 06 February 2009 06 February 2009 HC0003 White nacelle, side A big grin done
PS Repair of a broken pin in a PS backplane crate A-side. Patrick Robbe 05 February 2009 05 February 2009 CP0005   big grin done
Changed:
<
<
RICH 1 Installation of trolley with the HPD array B. Cameron 11 February 2009 12 February 2009 RU0004   roll eyes (sarcastic) in preparation
RICH 1 Installation of the Upper Photon Funnel Christoph Frei 16 February 2009 25 February 2009 RU0005 Green Nacelle roll eyes (sarcastic) in preparation
>
>
RICH 1 Installation of trolley with the HPD array B. Cameron 11 February 2009 12 February 2009 RU0004   big grin done
RICH 1 Installation of the Upper Photon Funnel Christoph Frei 16 February 2009 25 February 2009 RU0005 Green Nacelle big grin done
 
PS Tuning of LED light pulse hight on PS Evgeny GUSHCHIN 10 February 2009 17 February 2009 CP0006 Green nacelle big grin done
ECAL INSTALLATION OF HV-BOXES ON A-SIDE Irina Machikhiliyan 16 February 2009 20 February 2009 CE0011   smile started
Muon PERPARATION/MODIFICATION OF CALBING FOR CHAMBERS OF REGION R1 AND R2 B. Schmidt, A. Cardini 26 January 2009 24 Mars 2009 UX0003   smile started
Muon INSTALLATION OF LONG ALIGNMENT BARS FOR STATION M1 B. Schmidt, Th. Schneider 17 February 2009 02 Mars 2009 UX0004 yellow nacelle smile started
Muon M1 CHAMBER INSTALLATION B. Schmidt, A. Cardini 16 February 2009 20 June 2009 PPSPS-M1-Chamber-Installation