The computing project management team consists of the following roles and people:
Line: 12 to 12
 The team meets weekly. Agendas and Minutes are confidential, but the action list is public, see below.

Actions outstanding

Changed:
<
<
  Action Minuted Who? Status
1 Provide data management overview information. To be acceptance tested by PCl and released in LHCbDirac 13/04/11 RG RG to check status with Adri and Elisa
>
>
  Action Minuted Who? Status
1 Provide data management overview information. To be acceptance tested by PCl and released in LHCbDirac 13/04/11 RG Ongoing, tests will be moved from dev bk to prod instance to check if prototype makes sense
 
2 Discuss requirements for permanent displays of data management information 13/04/11 RG, PCl Depends on 1. RG to request plots as minuted 27/04/11
Changed:
<
<
3 Ask Olivier Callot to contact RG concerning throttling of file downloads from mass storage 13/04/11 MC Discussion took place. RG should follow up with OC
4 Ask Stefan to request that LHCb SAM tests be included in glexec testing infrastructure 13/04/11 PCh Ongoing, PCh to check if itís done
5 Renew request for use of multiple streams in lcg_utils data transfer tools 13/04/11 PCh Mail was sent, waiting for reply from J.P. Baud
>
>
4 Ask Stefan to request that LHCb SAM tests be included in glexec testing infrastructure 13/04/11 RG Ongoing. Tests included but require reporting of failures. RG to follow up.
 
6 Finish documenting computing project roles 27/04/11 MC
Changed:
<
<
7 Review steps needed to close a production 27/04/11 PCl
>
>
7 Review steps needed to close a production 27/04/11 PCl Draft document with Federico for review
 
8 Regularly review manpower, identify current and future needs 27/04/11 MC Needs last minuted on 27/04/11
Added:
>
>
9 Define model for reprocessing at T2 11/05/11 PCl
10 Discuss with speakers bureau chair visibility of computing talks 11/05/11 MC
11 Ask PPG to give recommendation on NeuroBayes usage 11/05/11 MC
12 Clarify with Ian Bird what should be assumed analysis job efficiency at Tier1 11/05/11 RG
13 Clarify how LHCb should receive feedback from C-RSG 11/05/11 MC
14 Define stripping 14 timescale with PPG 11/05/11 MC
15 Define model for WG productions 11/05/11 PCl PCl will pilot submission of WG productions through central system