Muon Commissioning Hardware

Line: 30 to 30
  Developer: M. Lenzi
Added:
>
>
 
  • The PVSS project has its FSM and to control anything you need, first of all, to 'take' privileges....
  • Then you can navigate the panels trough the Quadrant and stations that you need to work on.
Line: 63 to 65
 

HV

Added:
>
>
 

PNPI system

Line: 71 to 75
  For problems concerning systec operation, please contact R. Nobrega or C. DePlano.
Added:
>
>

Tell1 PVSS project

Developer: M. Lenzi

* To start/stop pvss project please read the instructions at http://lblogbook.cern.ch/MUON/181

 

Documentation

Computer names

Revision 12008-05-15 - AlessioSarti

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="LHCbMuon"

Muon Commissioning Hardware

Page that contains the basic informations about Hardware control used for commissioning of Muon System

Muon Page and LHCb Twiki Page

Useful links / informations / documentation

Online pages

Hardware Configuration

LV

For any problem please contact M. Lenzi

  • To control LV you should:
    • Log on into lbts.cern.ch PC (online interface to the rest of the world)
    • From lbts you make a remote desktop connection to computer UI01
    • On UI01 you should look into 'MyComputer' going trough G: -> online -> ecs -> muon -> Shortcuts
    • Then you click on the shortcut of the pvss project you need (LV side A or C, depending on what you want to do). Details on PVSS project can be found below.

PVSS project

Developer: M. Lenzi

  • The PVSS project has its FSM and to control anything you need, first of all, to 'take' privileges....
  • Then you can navigate the panels trough the Quadrant and stations that you need to work on.

FAQs:

  • Q:
  • A:

Maraton Issues

Experts: M. Lenzi, p. Ciambrone For any hardware problem please contact the experts.

Sometimes the Maraton goes into a funny state: it shows errors that are unlikely to be real hardware failures. In those cases you should carefully check:

  • That the OPC server is running correctly and the RCM is talking communicating correctly
  • That the communication btw the RCM and the Maraton is correct

OPC server restart can be done only with administrator privileges (ask M. Lenzi)

To exit from real funny situation the following chain of actions has proved to help:

Turn off PVSS and OPC server
Reboot RCM crate
Restart PVSS and OPC server
Poer cycle the Maraton

After each step you need to check that the communication is going as expected. Latest maraton known problem: last november! Since then everything is running smoothly.

HV

PNPI system

Systec

For problems concerning systec operation, please contact R. Nobrega or C. DePlano.

Documentation

Computer names

Item/Stat/side PCName SystemNumber SystemName ProjectName
T&P MUDCS01w 270 MUDCSSEN MUDCSSEN
LV/C MULVC01w 210 MUDCSLVC MUDCSLVC
LV/A MULVA01w 211 MUDCSLVA MUDCSLVA
HV/C MUHVC01w 212 MUHVC01 MUHVC01
HV/C MUHVC02w 213 MUHVC02 MUHVC02
HV/A MUHVA01w 214 MUHVA01 MUHVA01
HV/A MUHVA02w 215 MUHVA02 MUHVA02

The shortcuts that should be used can be found under g:\\online\ecs\shortcuts\MUON

-- AlessioSarti - 15 May 2008

 