Difference: Production100 (25 vs. 26)

Revision 262012-10-03 - unknown

Line: 1 to 1
 
META TOPICPARENT name="ProductionProcedures"

Getting Productions to 100%

Line: 600 to 600
  and in ProductionDB too.
Added:
>
>

File in status Assigned and relative job is Done: input data missing from JDL

In a stripping19c merging production was found a rare case of a file in status Assigned, whose relative job was Done. The problem was that the InputData field in the JDL was empty! so the job didn't actually process the input file, and produced an output file with no relevant data in it. In the Bkk summary there was no relation with the input file, so it was not registered as descendant of the input. See elog

Solution remove the output file with dirac-dms-remove-file, and reset to Unused the input.

 

Some comments and warnings

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback