30th October 2013 (Thursday)

  • Main activities are incremental stripping (T0/1) and Simulation(T2)
  • T0:

  • T1:
    • SARA: Downtime

28th October 2013 (Monday)

  • Main activities are incremental stripping (T0/1) and Simulation(T2)
  • T0: FTS3 Downtime
  • T1:
    • SARA: Downtime

24th October 2013 (Thursday)

  • Main activities are incremental stripping (T0/1) and Simulation(T2)
  • T0: NTR
  • T1: NTR

21st October 2013 (Monday)

  • Main activities are incremental stripping (T0/1) and Simulation(T2)
  • T0: NTR
  • T1:
    • RAL: Pilots aborted during weekend (GGUS:98210) - Solved; Pilots aborted at ARC CE (Condor queue) today.

17th October 2013 (Thursday)

  • Main activities are incremental stripping (T0/1) and Simulation
  • T0: NTR
  • T1: NTR

14th October 2013 (Monday)

  • Main activities are incremental stripping (T0/1) and Simulation
  • T0: NTR
  • T1: NTR

10th October 2013 (Thursday)

  • Main activities are incremental stripping (T0/1) and Simulation
  • T0:
    • All FTS transfers between all storage elements have been switched to FTS3 in production (few sites were missing)
  • T1:
    • CNAF: Short interruption on Tuesday b/c of problem with switch connecting to storage, fixed promptly.
    • IN2P3: Pilots aborted b/c of BLAH server issue, problem fixed (GGUS:97804)

7th October 2013 (Monday)

  • Main activity are MC productions.
  • Fall incremental stripping campaign was launched Oct 3
  • T0:
    • Pilots aborted at ce202 (GGUS:97736), fixed
    • FTS3 transfers stopped before week-end (GGUS:97796), problem fixed
  • T1:
    • IN2P3: Alarm ticket (GGUS:97743) b/c of wrong protocol returned by SRM, promptly fixed
    • IN2P3: Pilots aborting b/c of issue with BLAH server (GGUS:97804), problem fixed immediately
    • GRIDKA: Problem with tape recall during the week-end (GGUS:97795), problem fixed during week-end
  • Other:
    • Asked to GGUS team about list of LHCb "GGUS alarmers" which seems not to be in sync with VOMS (GGUS:97755)
    • GRIDENV on SLC6 at CERN (GGUS:97712)

3rd October 2013 (Thursday)

 \ No newline at end of file

Revision 12013-03-04 - JoelClosier

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="ProductionOperationsWLCG2013Reports"

October 2013 Reports

To the main
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback