Difference: ReprocessingChecklist2010 (1 vs. 18)

Revision 182014-10-22 - MarcoCattaneo

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 24 to 24
 

Reconstruction

Subsystem Coordinator Software released (SVN tag)
Changed:
<
<
Brunel Framework Marco Cattaneo v43r2p8
>
>
Brunel Framework Marco Cattaneo v43r2p8 for early data, v43r2p9 for autumn data
 
Velo David Hutchcroft  
ST Mark Tobin  
OT Lucia Grillo, Francesco Dettori  
Changed:
<
<
Tracking Pattern Recognition Jeroen van Tilburg To be checked: TrackSys defines a different list of pattern recognition algorithms, with no global cuts, for 2010 data c.f. later data. Is this still valid with the new alignment?
>
>
Tracking Pattern Recognition Jeroen van Tilburg Changed TrackSys to use same algorithms and GECs as in 2011 and 2012. Change introduced in Brunel v43r2p9
 
Track Fit Jeroen van Tilburg  
Primary Vertex Mariusz Witek  
Rich Chris Jones  

Revision 172014-06-03 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 47 to 47
 
ST charge and noise calibration Frederic Dupertuis --- No changes planned
OT time calibration Lucia Grillo https://savannah.cern.ch/patch/?5808 27.03.2014
Tracking alignment Maurizio Martinelli https://savannah.cern.ch/patch/?5792 25.03.2014
Changed:
<
<
Rich refractive index Chris Jones waiting for a patch Changes planned
Rich mirror alignment Chris Jones waiting for a patch Changes planned
Rich HPD occupancies Chris Jones waiting for a patch Changes planned
Rich HPD image alignment Chris Jones waiting for a patch Changes planned
>
>
Rich refractive index Chris Jones https://savannah.cern.ch/patch/?5855 03.06.2014
Rich mirror alignment Chris Jones https://savannah.cern.ch/patch/?5855 03.06.2014
Rich HPD occupancies Chris Jones https://savannah.cern.ch/patch/?5855 03.06.2014
Rich HPD image alignment Chris Jones https://savannah.cern.ch/patch/?5855 03.06.2014
 
Ecal(+Hcal) gain correction Olivier Deschamps --- No changes planned
Calo PID calibration Olivier Deschamps --- No changes planned
Calo reconstruction Olivier Deschamps --- No changes planned
Calo alignment Olivier Deschamps --- No changes planned
Changed:
<
<
Muon ID calibration Helder Lopes / Barbara Sciascia waiting for a patch Changes planned
>
>
Muon ID calibration Helder Lopes / Barbara Sciascia --- No changes planned
 

Stripping

  • Current proposal:

Revision 162014-03-28 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 45 to 45
 
Velo alignment Silvia Borghi --- No changes planned
ST dead channels Frederic Dupertuis --- No changes planned
ST charge and noise calibration Frederic Dupertuis --- No changes planned
Changed:
<
<
OT time calibration Lucia Grillo waiting for a patch Changes planned
>
>
OT time calibration Lucia Grillo https://savannah.cern.ch/patch/?5808 27.03.2014
 
Tracking alignment Maurizio Martinelli https://savannah.cern.ch/patch/?5792 25.03.2014
Rich refractive index Chris Jones waiting for a patch Changes planned
Rich mirror alignment Chris Jones waiting for a patch Changes planned

Revision 152014-03-25 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 46 to 46
 
ST dead channels Frederic Dupertuis --- No changes planned
ST charge and noise calibration Frederic Dupertuis --- No changes planned
OT time calibration Lucia Grillo waiting for a patch Changes planned
Changed:
<
<
Tracking alignment Maurizio Martinelli waiting for a patch Changes planned
>
>
Tracking alignment Maurizio Martinelli https://savannah.cern.ch/patch/?5792 25.03.2014
 
Rich refractive index Chris Jones waiting for a patch Changes planned
Rich mirror alignment Chris Jones waiting for a patch Changes planned
Rich HPD occupancies Chris Jones waiting for a patch Changes planned

Revision 142014-03-24 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 14 to 14
 
  • Data for reprocessing:
    • April-May 2010 data: low pile-up, ~14 nb^-1 (RUN RANGE: 71474 - 72331);
Changed:
<
<
    • September-October 2010 data: higher pile-up, ~35 pb^-1 (RUN RANGE: 71571 - 81764);
>
>
    • September-October 2010 data: higher pile-up, ~35 pb^-1 (RUN RANGE: 79571 - 81764);
 
    • exclude June-August 2010 data which were taken under widely varying pileup conditions;

Revision 132014-03-05 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 42 to 42
 
2010 calibrations for Reco14
Subsystem Coordinator Tag / Patch Last validated date
Velo RF Foil description Thomas Latham --- No changes planned
Changed:
<
<
Velo alignment Silvia Borghi waiting for a patch Changes planned
>
>
Velo alignment Silvia Borghi --- No changes planned
 
ST dead channels Frederic Dupertuis --- No changes planned
ST charge and noise calibration Frederic Dupertuis --- No changes planned
OT time calibration Lucia Grillo waiting for a patch Changes planned

Revision 122014-02-21 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 55 to 55
 
Calo PID calibration Olivier Deschamps --- No changes planned
Calo reconstruction Olivier Deschamps --- No changes planned
Calo alignment Olivier Deschamps --- No changes planned
Changed:
<
<
Muon ID calibration Helder Lopes / Barbara Sciascia --- No changes planned
>
>
Muon ID calibration Helder Lopes / Barbara Sciascia waiting for a patch Changes planned
 

Stripping

  • Current proposal:

Revision 112014-02-20 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 45 to 45
 
Velo alignment Silvia Borghi waiting for a patch Changes planned
ST dead channels Frederic Dupertuis --- No changes planned
ST charge and noise calibration Frederic Dupertuis --- No changes planned
Changed:
<
<
OT time calibration Lucia Grillo clarify No changes planned ?
>
>
OT time calibration Lucia Grillo waiting for a patch Changes planned
 
Tracking alignment Maurizio Martinelli waiting for a patch Changes planned
Rich refractive index Chris Jones waiting for a patch Changes planned
Rich mirror alignment Chris Jones waiting for a patch Changes planned

Revision 102014-02-06 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 6 to 6
 
  • Deadline for code and stripping selections: To be defined
Changed:
<
<
  • Processing name: Stripping20rX (Reco14)
>
>
  • Processing name: Stripping21rX (Reco14)
 
  • Location in BKK:
    • /LHCb/Collision10/Beam3500GeV-VeloClosed-MagDown/Real Data/

Revision 92014-02-01 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 51 to 51
 
Rich mirror alignment Chris Jones waiting for a patch Changes planned
Rich HPD occupancies Chris Jones waiting for a patch Changes planned
Rich HPD image alignment Chris Jones waiting for a patch Changes planned
Changed:
<
<
Ecal(+Hcal) gain correction Olivier Deschamps clarify No changes planned ?
Calo PID calibration Olivier Deschamps clarify No changes planned ?
Calo reconstruction Olivier Deschamps clarify No changes planned ?
Calo alignment Olivier Deschamps clarify No changes planned ?
Muon ID calibration Helder Lopes / Barbara Sciascia clarify No changes planned ?
>
>
Ecal(+Hcal) gain correction Olivier Deschamps --- No changes planned
Calo PID calibration Olivier Deschamps --- No changes planned
Calo reconstruction Olivier Deschamps --- No changes planned
Calo alignment Olivier Deschamps --- No changes planned
Muon ID calibration Helder Lopes / Barbara Sciascia --- No changes planned
 

Stripping

  • Current proposal:

Revision 82014-02-01 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 41 to 41
 
2010 calibrations for Reco14
Subsystem Coordinator Tag / Patch Last validated date
Changed:
<
<
Velo RF Foil description Thomas Latham waiting for a patch Changes planned
>
>
Velo RF Foil description Thomas Latham --- No changes planned
 
Velo alignment Silvia Borghi waiting for a patch Changes planned
ST dead channels Frederic Dupertuis --- No changes planned
ST charge and noise calibration Frederic Dupertuis --- No changes planned

Revision 72014-01-31 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 41 to 41
 
2010 calibrations for Reco14
Subsystem Coordinator Tag / Patch Last validated date
Changed:
<
<
Velo RF Foil description Thomas Latham clarify No changes planned ?
>
>
Velo RF Foil description Thomas Latham waiting for a patch Changes planned
 
Velo alignment Silvia Borghi waiting for a patch Changes planned
ST dead channels Frederic Dupertuis --- No changes planned
ST charge and noise calibration Frederic Dupertuis --- No changes planned

Revision 62014-01-31 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 13 to 13
 
    • /LHCb/Collision10/Beam3500GeV-VeloClosed-MagUp/ Real Data/

  • Data for reprocessing:
Changed:
<
<
    • April-May 2010 data: low pile-up, ~14 nb^-1;
    • September-October 2010 data: higher pile-up, ~35 pb^-1, run range: 71571 - 81764;
>
>
    • April-May 2010 data: low pile-up, ~14 nb^-1 (RUN RANGE: 71474 - 72331);
    • September-October 2010 data: higher pile-up, ~35 pb^-1 (RUN RANGE: 71571 - 81764);
 
    • exclude June-August 2010 data which were taken under widely varying pileup conditions;

Revision 52014-01-31 - DmytroVolyanskyy

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 43 to 43
 
Subsystem Coordinator Tag / Patch Last validated date
Velo RF Foil description Thomas Latham clarify No changes planned ?
Velo alignment Silvia Borghi waiting for a patch Changes planned
Changed:
<
<
ST dead channels Frederic Dupertuis clarify No changes planned ?
ST charge and noise calibration Frederic Dupertuis clarify No changes planned ?
>
>
ST dead channels Frederic Dupertuis --- No changes planned
ST charge and noise calibration Frederic Dupertuis --- No changes planned
 
OT time calibration Lucia Grillo clarify No changes planned ?
Tracking alignment Maurizio Martinelli waiting for a patch Changes planned
Rich refractive index Chris Jones waiting for a patch Changes planned
Line: 55 to 55
 
Calo PID calibration Olivier Deschamps clarify No changes planned ?
Calo reconstruction Olivier Deschamps clarify No changes planned ?
Calo alignment Olivier Deschamps clarify No changes planned ?
Changed:
<
<
Muon ID calibration Helder Lopes clarify No changes planned ?
>
>
Muon ID calibration Helder Lopes / Barbara Sciascia clarify No changes planned ?
 

Stripping

  • Current proposal:

Revision 42014-01-28 - MarcoCattaneo

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 28 to 28
 
Velo David Hutchcroft  
ST Mark Tobin  
OT Lucia Grillo, Francesco Dettori  
Changed:
<
<
Tracking Pattern Recognition Jeroen van Tilburg  
>
>
Tracking Pattern Recognition Jeroen van Tilburg To be checked: TrackSys defines a different list of pattern recognition algorithms, with no global cuts, for 2010 data c.f. later data. Is this still valid with the new alignment?
 
Track Fit Jeroen van Tilburg  
Primary Vertex Mariusz Witek  
Rich Chris Jones  

Revision 32014-01-28 - MarcoCattaneo

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 24 to 24
 

Reconstruction

Subsystem Coordinator Software released (SVN tag)
Changed:
<
<
Brunel Framework Marco Cattaneo  
>
>
Brunel Framework Marco Cattaneo v43r2p8
 
Velo David Hutchcroft  
ST Mark Tobin  
OT Lucia Grillo, Francesco Dettori  

Revision 22014-01-28 - PatrickSKoppenburg

Line: 1 to 1
 
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

Line: 23 to 23
 

Reconstruction

Changed:
<
<
Subsystem Coordinator Software released (SVN tag)
>
>
Subsystem Coordinator Software released (SVN tag)
 
Brunel Framework Marco Cattaneo  
Velo David Hutchcroft  
ST Mark Tobin  

Revision 12014-01-27 - DmytroVolyanskyy

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="LHCb"

Reprocessing checklist for 2010 data

This page contains a checklist of deliverables needed before the green light can be given for reprocessing of 2010 data with Reco14

  • Deadline for code and stripping selections: To be defined

  • Processing name: Stripping20rX (Reco14)

  • Location in BKK:
    • /LHCb/Collision10/Beam3500GeV-VeloClosed-MagDown/Real Data/
    • /LHCb/Collision10/Beam3500GeV-VeloClosed-MagUp/ Real Data/

  • Data for reprocessing:
    • April-May 2010 data: low pile-up, ~14 nb^-1;
    • September-October 2010 data: higher pile-up, ~35 pb^-1, run range: 71571 - 81764;
    • exclude June-August 2010 data which were taken under widely varying pileup conditions;

Software Release:

Reconstruction

Subsystem Coordinator Software released (SVN tag)
Brunel Framework Marco Cattaneo  
Velo David Hutchcroft  
ST Mark Tobin  
OT Lucia Grillo, Francesco Dettori  
Tracking Pattern Recognition Jeroen van Tilburg  
Track Fit Jeroen van Tilburg  
Primary Vertex Mariusz Witek  
Rich Chris Jones  
Calo Olivier Deschamps  
Muon ID Helder Lopes  
Global PID Chris Jones  
Lumi Jaap Panman  

Conditions Database

2010 calibrations for Reco14
Subsystem Coordinator Tag / Patch Last validated date
Velo RF Foil description Thomas Latham clarify No changes planned ?
Velo alignment Silvia Borghi waiting for a patch Changes planned
ST dead channels Frederic Dupertuis clarify No changes planned ?
ST charge and noise calibration Frederic Dupertuis clarify No changes planned ?
OT time calibration Lucia Grillo clarify No changes planned ?
Tracking alignment Maurizio Martinelli waiting for a patch Changes planned
Rich refractive index Chris Jones waiting for a patch Changes planned
Rich mirror alignment Chris Jones waiting for a patch Changes planned
Rich HPD occupancies Chris Jones waiting for a patch Changes planned
Rich HPD image alignment Chris Jones waiting for a patch Changes planned
Ecal(+Hcal) gain correction Olivier Deschamps clarify No changes planned ?
Calo PID calibration Olivier Deschamps clarify No changes planned ?
Calo reconstruction Olivier Deschamps clarify No changes planned ?
Calo alignment Olivier Deschamps clarify No changes planned ?
Muon ID calibration Helder Lopes clarify No changes planned ?

Stripping

  • Current proposal:
    • Early 2010 data (~14 nb^-1) with low pile-up will be reconstructed with Reco14 but not restripped and kept on disk.
    • Later 2010 data (~35 pb^-1) with higher pile-up will be reconstructed with Reco14 and restripped.

WGs that have special plans with these data should let Patrick know !

Subsystem Coordinator Software released (SVN tag)
Davinci Framework Chris Jones  
Stripping Framework Laurence Carson / Stefano Perazzini  
Stripping Lines Laurence Carson / Stefano Perazzini  
Stripping options in AppConfig Laurence Carson / Stefano Perazzini  

Software & Physics Validation

-- DmytroVolyanskyy - 27 Jan 2014

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback