Task: Water Cooling

Revision 22018-02-14 - BlakeLeverington

Line: 1 to 1
 
META TOPICPARENT name="CFrameAssembly"

Task: Water Cooling

Line: 9 to 9
 This comprises the mounting of the cooling blocks and tubes (partly on the I-beams before C-frame assembly?), followed by a tightness test under pressure. For the test of up to 1 full C-frame at a time, the heat shall be evacuated by the mixed water available in B3852 or by a small lab chiller. Extra temperature probes may be needed as electronic cards are not yet mounted at this stage? To be discussed and decided.

-- ChristianJoram - 2018-01-16

Added:
>
>
META TOPICMOVED by="bleverin" date="1518625337" from="LHCb.CuWo" to="LHCb.SciFiCuWo"

Revision 12018-01-16 - ChristianJoram

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="CFrameAssembly"

Task: Water Cooling

Scope

The tasks ensures the proper cooling of the readout electronics with water. This comprises the mounting of the cooling blocks and tubes (partly on the I-beams before C-frame assembly?), followed by a tightness test under pressure. For the test of up to 1 full C-frame at a time, the heat shall be evacuated by the mixed water available in B3852 or by a small lab chiller. Extra temperature probes may be needed as electronic cards are not yet mounted at this stage? To be discussed and decided.