LHCb FT SiPM Cooling workpackage

Revision 162014-12-03 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Line: 161 to 161
 
META FILEATTACHMENT attachment="Summary_2013.pdf" attr="" comment="A summary of SiPM cooling tests in 2013" date="1391088472" name="Summary_2013.pdf" path="Summary_2013.pdf" size="101161" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Proceedings_03.07_submitted.pdf" attr="" comment="Presentation at TIPP'2014 (SIPM cooling...)" date="1404673321" name="Proceedings_03.07_submitted.pdf" path="Proceedings_03.07_submitted.pdf" size="873451" user="gorbunov" version="1"
META FILEATTACHMENT attachment="F.Tuma_c6K_as.....pdf" attr="" comment="F. Tuma (3M Company) %22Fluoroketone C2F5C(O)CF(CF3)2 as a Heat Transfer Fluid for Passive and Pumped 2-Phase Applications%22,full PDF version difficult to find" date="1413397014" name="F.Tuma_c6K_as.....pdf" path="F.Tuma_c6K_as.....pdf" size="270227" user="gorbunov" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NOvec_Memo_1.3.pdf" attr="" comment="" date="1415389040" name="NOvec_Memo_1.3.pdf" path="NOvec_Memo_1.3.pdf" size="540798" user="gorbunov" version="1"
>
>
META FILEATTACHMENT attachment="NOvec_Memo_1.3.pdf" attr="" comment="" date="1417630191" name="NOvec_Memo_1.3.pdf" path="NOvec_Memo_1.3.pdf" size="552514" user="gorbunov" version="2"

Revision 152014-11-23 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Line: 70 to 70
 

Cooling options

  • Liquid cooling (mono-phase or 2-phase) - CERN, EN-CV group
Added:
>
>
 
  • Air cooling - CERN, CTU
  • Hybrid options
    • Air, with pre-cooling - CERN, CTU

Revision 142014-11-07 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Line: 135 to 135
 
  • F.Tuma_c6K_as.....pdf: F. Tuma (3M Company) "Fluoroketone C2F5C (O)CF(CF3)2 as a Heat Transfer Fluid for Passive and Pumped 2-Phase Applications",full PDF version, difficult to find
Changed:
<
<
>
>
 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="PICTURE: The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="ICON: Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
Line: 160 to 160
 
META FILEATTACHMENT attachment="Summary_2013.pdf" attr="" comment="A summary of SiPM cooling tests in 2013" date="1391088472" name="Summary_2013.pdf" path="Summary_2013.pdf" size="101161" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Proceedings_03.07_submitted.pdf" attr="" comment="Presentation at TIPP'2014 (SIPM cooling...)" date="1404673321" name="Proceedings_03.07_submitted.pdf" path="Proceedings_03.07_submitted.pdf" size="873451" user="gorbunov" version="1"
META FILEATTACHMENT attachment="F.Tuma_c6K_as.....pdf" attr="" comment="F. Tuma (3M Company) %22Fluoroketone C2F5C(O)CF(CF3)2 as a Heat Transfer Fluid for Passive and Pumped 2-Phase Applications%22,full PDF version difficult to find" date="1413397014" name="F.Tuma_c6K_as.....pdf" path="F.Tuma_c6K_as.....pdf" size="270227" user="gorbunov" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="NOvec_Memo_1.3.pdf" attr="" comment="Project: Novec 649 as a replacement for C16F14 in liquid cooling systems" date="1415304461" name="NOvec_Memo_1.3.pdf" path="NOvec_Memo_1.3.pdf" size="528611" user="gorbunov" version="1"
>
>
META FILEATTACHMENT attachment="NOvec_Memo_1.3.pdf" attr="" comment="" date="1415389040" name="NOvec_Memo_1.3.pdf" path="NOvec_Memo_1.3.pdf" size="540798" user="gorbunov" version="1"

Revision 132014-11-06 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Mandate

Changed:
<
<
As defined at the Heidelberg Workshop (April 2013) (summary): PG advises, simulates. Imperial: engineering design and construction.
>
>
As defined at the Heidelberg Workshop (April 2013) ( summary): PG advises, simulates. Imperial: engineering design and construction.
  Tasks:
  • Assess and measure heat load
Line: 27 to 27
 
  • The simulation work was paused since mid June, upon completion of the heat load study for the generic end-cap design. The result: 7.5 W per module side. The work will be resumed, once the consensus on the end-cap configuration has been achieved. The intermediate report will be ready shortly.
  • Preparation for the liquid cooling (2-phase) tests is ongoing. The tests will be performed at the TOTEM C3F8-based facility. Mono-phase liquid cooling test setup is being designed (2-stage, with a -10C pre-cooler and a Peltier-based main cooler, down to -50C).
  • Useful links with the industry have been established in May-June: Institute of Thermoelectricity (UA) - specialized Peltier coolers, Thermacore Europe (UK) - low-temperature heat-pipes, composite heat-spreaders.
Changed:
<
<
mockup1_icon.jpg
>
>
mockup1_icon.jpg
 

07 August 2013

  • The work on the air cooling tests continued in July. 4 different options of a cooling pipe have been tested with a full-scale end-cap mockup #1. The compressed air conditioning was upgraded by adding an industrial air dryer. The report is being prepared by the CTU team (expected date: August 10).
Line: 36 to 36
 
  • The liquid cooling (2-phase) test bench at the TOTEM C3F8-based facility has been prepared. The initial measurements, using a special thermostatic enclosure with a controlled thermal load, began this week.
  • Mono-phase liquid cooling test setup will be based on the the FPW-91 Julabo chiller, already delivered, to be installed at Point 8.
  • Negotiations with Thermacore Europe Ltd: an offer to design and manufacture prototype low-temperature ammonia-filled heat-pipes was received. Due to a high price, this option had been put on hold. Solid metal heat spreader with external Peltier chiller is a viable option for a BGV-like module design (discussed with Massi and Fred, TBD with Guido)
Changed:
<
<
mockup1_icon.jpg
>
>
mockup1_icon.jpg
 

04 September 2013

  • 2-phase cooling tests started at the TOTEM test bench at H8, initially with a specially designed isothermal box containing a real cooling pipe (evaporator), a simulation of the end-piece and SiPM array, as well as a heater simulating a heat load of about 10W.
  • Results on temperature uniformity obtained, with different pressure differentials.
Line: 45 to 45
 
  • A smaller new JULABO chiller F81ME/HL, intended for D-module cooling, will be ordered shortly

10 October 2013

  • 2-phase cooling tests continued with the new mockup, completed by September 16.
Changed:
<
<
  • Two different insulation wall versions were tested. The total thermal load of the mockup was estimated as ~20W (including the external capillary and loosely insulated connection pipes), by observing the "dry-out" effect at the lowest temperatures at dummy SiPMs (down to -45...-48C). Under these conditions, the C3F8-based system had to be operated with a significant underpressure on the suction side (0.42 bara).
>
>
  • Two different insulation wall versions were tested. The total thermal load of the mockup was estimated as ~20W (including the external capillary and loosely insulated connection pipes), by observing the "dry-out" effect at the lowest temperatures at dummy SiPMs (down to -45...-48C). Under these conditions, the C3F8 -based system had to be operated with a significant underpressure on the suction side (0.42 bara).
 
  • The reports about summer tests have been prepared by the CTU group
  • A new round of thermal analysis: evaluation of local parameters of a 2-phase cooling scheme (capillaries, mass flows, thermal cycle)
  • First series of single-phase liquid cooling tests with the (borrowed) Julabo chiller: completed by October 1.
  • Ordered:a JULABO chiller F81HL, intended for D-module cooling; the delivery is expected this week.
  • Preparation of the SiPM cooling workshop of October 17
Changed:
<
<
>
>
 

Thermal simulation

A CFD simulation Project Proposal (link to EDMS document). This project, joint with EN/CV, was intended to evaluate the heat load of the FT module end caps and give some insight for various prospective cooling options. Author: Enrico da Riva (CERN, EN/CV/PR).

Line: 78 to 78
 
    • integrated TE cooling if SiPMs (a micro-Peltier module in the SiPM package) - proposed by ITE, currently this option is not pursued.

Schedule

Changed:
<
<
(Overview of main activities, transient activities are not mentioned). Completed activities are marked in green, ongoing – in brown, scheduled – in black, critical path -- red).
>
>
(Overview of main activities, transient activities are not mentioned). Completed activities are marked in green, ongoing in brown, scheduled in black, critical path -- red).
  May
  • 1st round of thermal CFD analysis: head load and temperature profiles, mostly 2D (PG, EdR)
  • A feasibility study of the single-phase liquid cooling option (infrastructure) (PG, Julabo)
  • Order materials for the cooling mock-up(1), design of the 1st mockup version (PG)
  • Set up cooperation with the CTU(2) group (air and evaporative cooling options) (PG, RL, VV)
Changed:
<
<
  • Set up cooperation with ITE(3) on the Peltier cooling option (PG, ITE) – by end-May
>
>
  • Set up cooperation with ITE(3) on the Peltier cooling option (PG, ITE) by end-May
 
  • Prepare the air cooling lab facilities (PG, GD)
June
  • Contacts with Thermacore Europe: "heat pipe" cooling option - weeks 1,3
Changed:
<
<
  • 2nd round of CFD simulations: 3D, air cooling, heat load evaluation (EdR, PG) – weeks 1-3
  • Start of the air cooling tests – preparation phase, calibrations etc (PG, VV, MD) – June 17
  • Construction of the 1st mock-up (GD, PG) – by end-June
>
>
  • 2nd round of CFD simulations: 3D, air cooling, heat load evaluation (EdR, PG) weeks 1-3
  • Start of the air cooling tests preparation phase, calibrations etc (PG, VV, MD) June 17
  • Construction of the 1st mock-up (GD, PG) by end-June
 July
Changed:
<
<
  • Draft report on the thermal simulation project (EdR, PG) – week 1-2, pending
  • 3rd round of CFD simulations: new end-cap design, 2-phase cooling (EdR, PG) – weeks 2-4
  • Air cooling tests, main phase (ME, PG) – week 1-4
  • Liquid cooling tests (PG) – weeks 2-4, shifted to September
  • Design and construct the 2nd version of the cooling mockup (PG, TS, GD) – weeks 3-4
  • Preparation phase for the evaporative cooling option tests at H8 (VV, MD, GD) – weeks 1-4
  • Intermediate report on the air and liquid cooling options tests (PG) – end of July
>
>
  • Draft report on the thermal simulation project (EdR, PG) week 1-2, pending
  • 3rd round of CFD simulations: new end-cap design, 2-phase cooling (EdR, PG) weeks 2-4
  • Air cooling tests, main phase (ME, PG) week 1-4
  • Liquid cooling tests (PG) weeks 2-4, shifted to September
  • Design and construct the 2nd version of the cooling mockup (PG, TS, GD) weeks 3-4
  • Preparation phase for the evaporative cooling option tests at H8 (VV, MD, GD) weeks 1-4
  • Intermediate report on the air and liquid cooling options tests (PG) end of July
 August
Changed:
<
<
  • Petr is away (vacations) – 2-10 August, TBC
  • Final air cooling measurements (ME) – weeks 1-2
  • Liquid cooling measurements with Julabo chiller(PG) – weeks 3-4, shifted to September
  • Start of 2-phase measurements at H8 (MD) – weeks 1 (or 2)
  • Possible follow-up of the joint ITE project on Peltier cooling (PG, ITE) – about end-August – mid Septenber
  • Draft summary report on the SiPM cooling, choice of the cooling option for the Demo (PG) – end August- week 1 of September
>
>
  • Petr is away (vacations) 2-10 August, TBC
  • Final air cooling measurements (ME) weeks 1-2
  • Liquid cooling measurements with Julabo chiller(PG) weeks 3-4, shifted to September
  • Start of 2-phase measurements at H8 (MD) weeks 1 (or 2)
  • Possible follow-up of the joint ITE project on Peltier cooling (PG, ITE) about end-August mid Septenber
  • Draft summary report on the SiPM cooling, choice of the cooling option for the Demo (PG) end August- week 1 of September
 September
Changed:
<
<
  • Final 2-phase cooling measurements (MD, PG) – weeks 1-2
  • Final report by the CTU group (VV, MD, ME) – weeks 2-3
  • Integration with the Demo module (PG, TS, all) – weeks 3-4 - postpopned
  • Work on the TDR section about the SiPM cooling (PG) – postponed
  • Liquid cooling measurements with Julabo chiller(PG) – weeks 4
>
>
  • Final 2-phase cooling measurements (MD, PG) weeks 1-2
  • Final report by the CTU group (VV, MD, ME) weeks 2-3
  • Integration with the Demo module (PG, TS, all) weeks 3-4 - postpopned
  • Work on the TDR section about the SiPM cooling (PG) postponed
  • Liquid cooling measurements with Julabo chiller(PG) weeks 4
 
  • Possible follow-up of the heat-pipe joint project with Thermacore Europe - on hold
(1) A full-scale model of the FT module end cap, intended to test various SiPM cooling options
(2) Czech Technical University, Prague. Group leader: Vaclav (Vic) Vacek
(3) Institute of Thermoelectricity, Chernovtsy, Ukraine. Director: Akad. Prof. L.I.Anatychuk

Acronyms

Changed:
<
<
TBC – to be confirmed
>
>
TBC to be confirmed
 
Changed:
<
<
CTU – Czech Technical University (Prague)
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TS – Trevor Savidge (IC)
>
>
CTU Czech Technical University (Prague)
EdR Enrico da Riva (EN-CV-PJ)
GD Gerard Decreuse
ITE Inst. Of Thermoelectricity (Chernovtsy)
MD Martin Doubek (CTU)
ME Miroslav Erben (CTU)
PG Petr Gorbounov
RL Rolf Lindner
VV Vic Vaceck (CTU)
TS Trevor Savidge (IC)
 

Attached Documents

Line: 133 to 133
 
Changed:
<
<
  • F.Tuma_c6K_as.....pdf: F. Tuma (3M Company) "Fluoroketone C2F5C(O)CF(CF3)2 as a Heat Transfer Fluid for Passive and Pumped 2-Phase Applications",full PDF version difficult to find
>
>
  • F.Tuma_c6K_as.....pdf: F. Tuma (3M Company) "Fluoroketone C2F5C (O)CF(CF3)2 as a Heat Transfer Fluid for Passive and Pumped 2-Phase Applications",full PDF version, difficult to find

 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="PICTURE: The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="ICON: Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
Line: 158 to 160
 
META FILEATTACHMENT attachment="Summary_2013.pdf" attr="" comment="A summary of SiPM cooling tests in 2013" date="1391088472" name="Summary_2013.pdf" path="Summary_2013.pdf" size="101161" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Proceedings_03.07_submitted.pdf" attr="" comment="Presentation at TIPP'2014 (SIPM cooling...)" date="1404673321" name="Proceedings_03.07_submitted.pdf" path="Proceedings_03.07_submitted.pdf" size="873451" user="gorbunov" version="1"
META FILEATTACHMENT attachment="F.Tuma_c6K_as.....pdf" attr="" comment="F. Tuma (3M Company) %22Fluoroketone C2F5C(O)CF(CF3)2 as a Heat Transfer Fluid for Passive and Pumped 2-Phase Applications%22,full PDF version difficult to find" date="1413397014" name="F.Tuma_c6K_as.....pdf" path="F.Tuma_c6K_as.....pdf" size="270227" user="gorbunov" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NOvec_Memo_1.3.pdf" attr="" comment="Project: Novec 649 as a replacement for C16F14 in liquid cooling systems" date="1415304461" name="NOvec_Memo_1.3.pdf" path="NOvec_Memo_1.3.pdf" size="528611" user="gorbunov" version="1"

Revision 122014-10-15 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Line: 122 to 122
  CTU – Czech Technical University (Prague)
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TS – Trevor Savidge (IC)
Added:
>
>

Attached Documents

 

Line: 132 to 133
 
Added:
>
>
  • F.Tuma_c6K_as.....pdf: F. Tuma (3M Company) "Fluoroketone C2F5C(O)CF(CF3)2 as a Heat Transfer Fluid for Passive and Pumped 2-Phase Applications",full PDF version difficult to find
 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="PICTURE: The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="ICON: Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2.pdf" attr="" comment="Mockup-2 drawings" date="1375906480" name="Mockup2.pdf" path="Mockup2.pdf" size="302706" user="gorbunov" version="1"
Line: 154 to 157
 
META FILEATTACHMENT attachment="NW_Final_ReportLHCbEvap_02.pdf" attr="" comment="CTU Long write-up: SiPM cooling (C3F8 evaporative)" date="1385505035" name="NW_Final_ReportLHCbEvap_02.pdf" path="NW_Final_ReportLHCbEvap_02.pdf" size="3117735" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Summary_2013.pdf" attr="" comment="A summary of SiPM cooling tests in 2013" date="1391088472" name="Summary_2013.pdf" path="Summary_2013.pdf" size="101161" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Proceedings_03.07_submitted.pdf" attr="" comment="Presentation at TIPP'2014 (SIPM cooling...)" date="1404673321" name="Proceedings_03.07_submitted.pdf" path="Proceedings_03.07_submitted.pdf" size="873451" user="gorbunov" version="1"
Added:
>
>
META FILEATTACHMENT attachment="F.Tuma_c6K_as.....pdf" attr="" comment="F. Tuma (3M Company) %22Fluoroketone C2F5C(O)CF(CF3)2 as a Heat Transfer Fluid for Passive and Pumped 2-Phase Applications%22,full PDF version difficult to find" date="1413397014" name="F.Tuma_c6K_as.....pdf" path="F.Tuma_c6K_as.....pdf" size="270227" user="gorbunov" version="1"

Revision 112014-07-06 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Line: 130 to 130
 
Added:
>
>
 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="PICTURE: The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="ICON: Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2.pdf" attr="" comment="Mockup-2 drawings" date="1375906480" name="Mockup2.pdf" path="Mockup2.pdf" size="302706" user="gorbunov" version="1"
Line: 151 to 153
 
META FILEATTACHMENT attachment="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" attr="" comment="CTU Long write-up: SiPM cooling (vortex tubes)" date="1385504981" name="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" path="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" size="5921218" user="gorbunov" version="1"
META FILEATTACHMENT attachment="NW_Final_ReportLHCbEvap_02.pdf" attr="" comment="CTU Long write-up: SiPM cooling (C3F8 evaporative)" date="1385505035" name="NW_Final_ReportLHCbEvap_02.pdf" path="NW_Final_ReportLHCbEvap_02.pdf" size="3117735" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Summary_2013.pdf" attr="" comment="A summary of SiPM cooling tests in 2013" date="1391088472" name="Summary_2013.pdf" path="Summary_2013.pdf" size="101161" user="gorbunov" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Proceedings_03.07_submitted.pdf" attr="" comment="Presentation at TIPP'2014 (SIPM cooling...)" date="1404673321" name="Proceedings_03.07_submitted.pdf" path="Proceedings_03.07_submitted.pdf" size="873451" user="gorbunov" version="1"

Revision 102014-01-30 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Line: 128 to 128
 
Changed:
<
<
>
>
 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="PICTURE: The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="ICON: Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
Line: 150 to 150
 
META FILEATTACHMENT attachment="SiPM_cooling_specs_1.2.pdf" attr="" comment="Draft specs for SiPM cooling" date="1381945116" name="SiPM_cooling_specs_1.2.pdf" path="SiPM_cooling_specs_1.2.pdf" size="1793551" user="gorbunov" version="1"
META FILEATTACHMENT attachment="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" attr="" comment="CTU Long write-up: SiPM cooling (vortex tubes)" date="1385504981" name="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" path="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" size="5921218" user="gorbunov" version="1"
META FILEATTACHMENT attachment="NW_Final_ReportLHCbEvap_02.pdf" attr="" comment="CTU Long write-up: SiPM cooling (C3F8 evaporative)" date="1385505035" name="NW_Final_ReportLHCbEvap_02.pdf" path="NW_Final_ReportLHCbEvap_02.pdf" size="3117735" user="gorbunov" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="Summary_by_PG.pdf" attr="" comment="A summary of SiPM cooling tests in 2013" date="1390942021" name="Summary_by_PG.pdf" path="Summary_by_PG.pdf" size="101161" user="gorbunov" version="1"
>
>
META FILEATTACHMENT attachment="Summary_2013.pdf" attr="" comment="A summary of SiPM cooling tests in 2013" date="1391088472" name="Summary_2013.pdf" path="Summary_2013.pdf" size="101161" user="gorbunov" version="1"

Revision 92014-01-28 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Line: 128 to 128
 
Added:
>
>
 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="PICTURE: The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="ICON: Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2.pdf" attr="" comment="Mockup-2 drawings" date="1375906480" name="Mockup2.pdf" path="Mockup2.pdf" size="302706" user="gorbunov" version="1"
Line: 148 to 150
 
META FILEATTACHMENT attachment="SiPM_cooling_specs_1.2.pdf" attr="" comment="Draft specs for SiPM cooling" date="1381945116" name="SiPM_cooling_specs_1.2.pdf" path="SiPM_cooling_specs_1.2.pdf" size="1793551" user="gorbunov" version="1"
META FILEATTACHMENT attachment="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" attr="" comment="CTU Long write-up: SiPM cooling (vortex tubes)" date="1385504981" name="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" path="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" size="5921218" user="gorbunov" version="1"
META FILEATTACHMENT attachment="NW_Final_ReportLHCbEvap_02.pdf" attr="" comment="CTU Long write-up: SiPM cooling (C3F8 evaporative)" date="1385505035" name="NW_Final_ReportLHCbEvap_02.pdf" path="NW_Final_ReportLHCbEvap_02.pdf" size="3117735" user="gorbunov" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Summary_by_PG.pdf" attr="" comment="A summary of SiPM cooling tests in 2013" date="1390942021" name="Summary_by_PG.pdf" path="Summary_by_PG.pdf" size="101161" user="gorbunov" version="1"

Revision 82013-11-26 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Line: 124 to 124
 
Added:
>
>

 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="PICTURE: The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="ICON: Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2.pdf" attr="" comment="Mockup-2 drawings" date="1375906480" name="Mockup2.pdf" path="Mockup2.pdf" size="302706" user="gorbunov" version="1"
Line: 142 to 146
 
META FILEATTACHMENT attachment="2013-07-22_final_with_flex.pdf" attr="h" comment="SIMU: final with flex PCB" date="1381685329" name="2013-07-22_final_with_flex.pdf" path="2013-07-22_final_with_flex.pdf" size="782791" user="gorbunov" version="1"
META FILEATTACHMENT attachment="SiPM_cooling_specs_1.1.pdf" attr="" comment="Draft specs on SiPM cooling" date="1381688057" name="SiPM_cooling_specs_1.1.pdf" path="SiPM_cooling_specs_1.1.pdf" size="1664055" user="gorbunov" version="1"
META FILEATTACHMENT attachment="SiPM_cooling_specs_1.2.pdf" attr="" comment="Draft specs for SiPM cooling" date="1381945116" name="SiPM_cooling_specs_1.2.pdf" path="SiPM_cooling_specs_1.2.pdf" size="1793551" user="gorbunov" version="1"
Added:
>
>
META FILEATTACHMENT attachment="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" attr="" comment="CTU Long write-up: SiPM cooling (vortex tubes)" date="1385504981" name="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" path="NW-CTU-for-LHCb-Aircooling-report_2013.pdf" size="5921218" user="gorbunov" version="1"
META FILEATTACHMENT attachment="NW_Final_ReportLHCbEvap_02.pdf" attr="" comment="CTU Long write-up: SiPM cooling (C3F8 evaporative)" date="1385505035" name="NW_Final_ReportLHCbEvap_02.pdf" path="NW_Final_ReportLHCbEvap_02.pdf" size="3117735" user="gorbunov" version="1"

Revision 72013-10-16 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Line: 122 to 122
  CTU – Czech Technical University (Prague)
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TS – Trevor Savidge (IC)
Added:
>
>
 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="PICTURE: The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="ICON: Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2.pdf" attr="" comment="Mockup-2 drawings" date="1375906480" name="Mockup2.pdf" path="Mockup2.pdf" size="302706" user="gorbunov" version="1"
Line: 139 to 141
 
META FILEATTACHMENT attachment="2013-08-01-SiPM_cooling_throuth_flex.pdf" attr="h" comment="SIMU: cooling through flex" date="1381685171" name="2013-08-01-SiPM_cooling_throuth_flex.pdf" path="2013-08-01-SiPM_cooling_throuth_flex.pdf" size="108204" user="gorbunov" version="1"
META FILEATTACHMENT attachment="2013-07-22_final_with_flex.pdf" attr="h" comment="SIMU: final with flex PCB" date="1381685329" name="2013-07-22_final_with_flex.pdf" path="2013-07-22_final_with_flex.pdf" size="782791" user="gorbunov" version="1"
META FILEATTACHMENT attachment="SiPM_cooling_specs_1.1.pdf" attr="" comment="Draft specs on SiPM cooling" date="1381688057" name="SiPM_cooling_specs_1.1.pdf" path="SiPM_cooling_specs_1.1.pdf" size="1664055" user="gorbunov" version="1"
Added:
>
>
META FILEATTACHMENT attachment="SiPM_cooling_specs_1.2.pdf" attr="" comment="Draft specs for SiPM cooling" date="1381945116" name="SiPM_cooling_specs_1.2.pdf" path="SiPM_cooling_specs_1.2.pdf" size="1793551" user="gorbunov" version="1"

Revision 62013-10-13 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Deleted:
<
<

Mandate

 
Changed:
<
<
PG advises, simulates. Imperial: engineering design and construction.
>
>

Mandate

As defined at the Heidelberg Workshop (April 2013) (summary): PG advises, simulates. Imperial: engineering design and construction.
  Tasks:
  • Assess and measure heat load
  • Demonstrate long operation, cycling, condensation
  • Thermal cycling to demostrate mechanical robustness, absence of leaks etc
Changed:
<
<

Status summary: 05 July 2013

>
>

Events

Documents

Status summary:

05 July 2013

 
  • Chilled air cooling lab has been set up. A CTU student is working full-time on the air cooling tests. 4 different options of a cooling pipe will be tested: 3 round tubes with and without inner structures, a rectangular multi-finned radiator (baseline). Currently, the compressed air conditioning is being upgraded.
  • Full-scale mockup of a single end-cap, with 6 cm outer plug and ~13 cm support plate fragment has been constructed. It will be used mostly for the air-cooling tests.
  • The simulation work was paused since mid June, upon completion of the heat load study for the generic end-cap design. The result: 7.5 W per module side. The work will be resumed, once the consensus on the end-cap configuration has been achieved. The intermediate report will be ready shortly.
  • Preparation for the liquid cooling (2-phase) tests is ongoing. The tests will be performed at the TOTEM C3F8-based facility. Mono-phase liquid cooling test setup is being designed (2-stage, with a -10C pre-cooler and a Peltier-based main cooler, down to -50C).
  • Useful links with the industry have been established in May-June: Institute of Thermoelectricity (UA) - specialized Peltier coolers, Thermacore Europe (UK) - low-temperature heat-pipes, composite heat-spreaders.
mockup1_icon.jpg
Changed:
<
<

Status summary: 07 August 2013

>
>

07 August 2013

 
  • The work on the air cooling tests continued in July. 4 different options of a cooling pipe have been tested with a full-scale end-cap mockup #1. The compressed air conditioning was upgraded by adding an industrial air dryer. The report is being prepared by the CTU team (expected date: August 10).
  • 2nd generation mockup was designed for the upcoming 2-phase cooling tests, using the concept discussed within the end-cap working group. The parts have been made, but not assembled, yet.
Changed:
<
<
  • The simulation work is largely completed. The latest end-cap design has an estimated heat load of 5.7W per module side. In addition, promising results were obtained for "the cooling-though-flexPCB" option (to be discussed with the SiPM community). The summary report is under preparation.
>
>
  • The simulation work is largely completed. The latest end-cap design has an estimated heat load of 5.7W per module side. In addition, promising results were obtained for "the cooling-though-flexPCB" option (to be discussed with the SiPM community). The summary report is under preparation.
 
  • The liquid cooling (2-phase) test bench at the TOTEM C3F8-based facility has been prepared. The initial measurements, using a special thermostatic enclosure with a controlled thermal load, began this week.
  • Mono-phase liquid cooling test setup will be based on the the FPW-91 Julabo chiller, already delivered, to be installed at Point 8.
  • Negotiations with Thermacore Europe Ltd: an offer to design and manufacture prototype low-temperature ammonia-filled heat-pipes was received. Due to a high price, this option had been put on hold. Solid metal heat spreader with external Peltier chiller is a viable option for a BGV-like module design (discussed with Massi and Fred, TBD with Guido)
mockup1_icon.jpg
Changed:
<
<

Status summary: 04 September 2013

  • 2-phase cooling tests started at the TOTEM test bench at H8, initially with a specially designed isothermal box containing a real cooling pipe (evaporator), a simulation of the end-piece and SiPM array, as well as a heater simulating a heat load of about 10W.
>
>

04 September 2013

  • 2-phase cooling tests started at the TOTEM test bench at H8, initially with a specially designed isothermal box containing a real cooling pipe (evaporator), a simulation of the end-piece and SiPM array, as well as a heater simulating a heat load of about 10W.
 
  • Results on temperature uniformity obtained, with different pressure differentials.
  • 2nd generation mockup , implementing the end-cap concept adopted in July, has been constructed and installed at the H8.
  • The JULABO chiller for single-phase liquid tests installed at Point 8, in the 2885/2-201 lab
  • A smaller new JULABO chiller F81ME/HL, intended for D-module cooling, will be ordered shortly
Changed:
<
<

Status summary: 10 October 2013

>
>

10 October 2013

 
  • 2-phase cooling tests continued with the new mockup, completed by September 16.
Changed:
<
<
  • Two different insulation wall versions were tested. The total thermal load of the mockup was estimated as ~20W (including the external capillary and loosely insulated connection pipes), by observing the "dry-out" effect at the lowest temperatures at dummy SiPMs (down to -45...-48C). Under these conditions, the C3F8-based system had to be operated with a significant underpressure on the suction side (0.42 bara).
>
>
  • Two different insulation wall versions were tested. The total thermal load of the mockup was estimated as ~20W (including the external capillary and loosely insulated connection pipes), by observing the "dry-out" effect at the lowest temperatures at dummy SiPMs (down to -45...-48C). Under these conditions, the C3F8-based system had to be operated with a significant underpressure on the suction side (0.42 bara).
 
  • The reports about summer tests have been prepared by the CTU group
  • A new round of thermal analysis: evaluation of local parameters of a 2-phase cooling scheme (capillaries, mass flows, thermal cycle)
  • First series of single-phase liquid cooling tests with the (borrowed) Julabo chiller: completed by October 1.
Line: 41 to 54
 

Thermal simulation

Added:
>
>
A CFD simulation Project Proposal (link to EDMS document). This project, joint with EN/CV, was intended to evaluate the heat load of the FT module end caps and give some insight for various prospective cooling options. Author: Enrico da Riva (CERN, EN/CV/PR).
 
Added:
>
>
  • 2013-08-01: Addendum to 22/07: cooling through flex PCB.
  • 24/07/2013: latest end cap simulation results ("July" geometry). 5.7 W/module
  • 2013-06-10: 3D with Alu + edge insulation; multiport cooling pipe. 7.1 W/module
  • 2013-05-30: Alu jacket; liquid and air cooling estimates. 7.1 W/module
  • 2013-05-27a: First 3D results, more on liquid coolants. 3D≈2D
  • 2013-05-14: End caprefinements, liquid_coolants. 6.3...8.5 W/module
  • 2013-04-22: 2nd_round results: try to minimize the heat load. ~6 W/module
  • 2013-03-13: 1st round results: heat load with a simplified geometry. ~10 W/module
Bottom line: in the ideal case (with no inlet/outlet tubes, perfect thermal contacts) the heat load per module should be less than 10W. The T drop between the cooling pipe and the Si die strongly depends on the stiffener material. For FR4: ~7 (~5.7 W/module); for carbon: ~3 (~6.3 W/module)
 

Cooling options

  • Liquid cooling (mono-phase or 2-phase) - CERN, EN-CV group
Line: 50 to 75
 
    • Air, with pre-cooling - CERN, CTU
    • Liquid/thermoelectric - CERN, ITE
    • Heat pipe/thermoelectric - CERN, Thermacore (, ITE)
Changed:
<
<
    • integrated TE cooling if SiPMs (a micro-Peltier module in the SiPM package) - proposed by ITE, currently this option is not pursued.
>
>
    • integrated TE cooling if SiPMs (a micro-Peltier module in the SiPM package) - proposed by ITE, currently this option is not pursued.
 

Schedule

Deleted:
<
<
SiPM cooling schedule: May-September 2013
 (Overview of main activities, transient activities are not mentioned). Completed activities are marked in green, ongoing – in brown, scheduled – in black, critical path -- red).

May

Line: 88 to 111
 
  • Final 2-phase cooling measurements (MD, PG) – weeks 1-2
  • Final report by the CTU group (VV, MD, ME) – weeks 2-3
  • Integration with the Demo module (PG, TS, all) – weeks 3-4 - postpopned
Changed:
<
<
  • Work on the TDR section about the SiPM cooling (PG) – postponed
>
>
  • Work on the TDR section about the SiPM cooling (PG) – postponed
 
  • Liquid cooling measurements with Julabo chiller(PG) – weeks 4
  • Possible follow-up of the heat-pipe joint project with Thermacore Europe - on hold
Changed:
<
<
Participants, abbreviations:
CTU – Czech Technical University (Prague)
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TBC – to be confirmed
TS – Trevor Savidge (IC)

(1) A full-scale model of the FT module end cap, intended to test various SiPM cooling options
(2) Czech Technical University, Prague. Group leader: Vaclav (Vic) Vacek
(3) Institute of Thermoelectricity, Chernovtsy, Ukraine. Director: Akad. Prof. L.I.Anatychuk
>
>
(1) A full-scale model of the FT module end cap, intended to test various SiPM cooling options
(2) Czech Technical University, Prague. Group leader: Vaclav (Vic) Vacek
(3) Institute of Thermoelectricity, Chernovtsy, Ukraine. Director: Akad. Prof. L.I.Anatychuk

Acronyms

TBC – to be confirmed

CTU – Czech Technical University (Prague)
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TS – Trevor Savidge (IC)

 
Changed:
<
<
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
>
>
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="PICTURE: The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="ICON: Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
 
META FILEATTACHMENT attachment="Mockup2.pdf" attr="" comment="Mockup-2 drawings" date="1375906480" name="Mockup2.pdf" path="Mockup2.pdf" size="302706" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Summary_3.07.2013.pdf" attr="" comment="Summary of %22Thermacore%22 option activities" date="1378238434" name="Summary_3.07.2013.pdf" path="Summary_3.07.2013.pdf" size="1125568" user="gorbunov" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="M.Doubek_Air_Cooling.jpg" attr="h" comment="M.Doubek at the Air Cooling setup in B.156" date="1378239015" name="M.Doubek_Air_Cooling.jpg" path="M.Doubek_Air_Cooling.jpg" size="638101" user="gorbunov" version="1"
META FILEATTACHMENT attachment="M.Doubek_Air_Cooling_-_Icon.jpg" attr="h" comment="" date="1378239055" name="M.Doubek_Air_Cooling_-_Icon.jpg" path="M.Doubek_Air_Cooling_-_Icon.jpg" size="42050" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2_at_H8.jpg" attr="h" comment="Mockup2 at the H8 test bench" date="1381356895" name="Mockup2_at_H8.jpg" path="Mockup2_at_H8.jpg" size="208888" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2_H8_icon.jpg" attr="h" comment="" date="1381357029" name="Mockup2_H8_icon.jpg" path="Mockup2_H8_icon.jpg" size="17306" user="gorbunov" version="1"
>
>
META FILEATTACHMENT attachment="M.Doubek_Air_Cooling.jpg" attr="h" comment="PICTURE: M.Doubek at the Air Cooling setup in B.156" date="1378239015" name="M.Doubek_Air_Cooling.jpg" path="M.Doubek_Air_Cooling.jpg" size="638101" user="gorbunov" version="1"
META FILEATTACHMENT attachment="M.Doubek_Air_Cooling_-_Icon.jpg" attr="h" comment="ICON" date="1378239055" name="M.Doubek_Air_Cooling_-_Icon.jpg" path="M.Doubek_Air_Cooling_-_Icon.jpg" size="42050" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2_at_H8.jpg" attr="h" comment="PICTURE: Mockup2 at the H8 test bench" date="1381356895" name="Mockup2_at_H8.jpg" path="Mockup2_at_H8.jpg" size="208888" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2_H8_icon.jpg" attr="h" comment="ICON" date="1381357029" name="Mockup2_H8_icon.jpg" path="Mockup2_H8_icon.jpg" size="17306" user="gorbunov" version="1"
META FILEATTACHMENT attachment="2013-03-13_heat_load_simpified.pdf" attr="h" comment="SUMU: First heat load, simplified 2D" date="1381684437" name="2013-03-13_heat_load_simpified.pdf" path="2013-03-13_heat_load_simpified.pdf" size="572443" user="gorbunov" version="1"
META FILEATTACHMENT attachment="2013-04-22_2nd_round_heat_load_minimization.pdf" attr="h" comment="SIMU: head load optimization" date="1381684552" name="2013-04-22_2nd_round_heat_load_minimization.pdf" path="2013-04-22_2nd_round_heat_load_minimization.pdf" size="1422201" user="gorbunov" version="1"
META FILEATTACHMENT attachment="2013-05-14_end-cap_refinements_liquid_coolants.pdf" attr="h" comment="SIMU: end-cap refinements, groove" date="1381684632" name="2013-05-14_end-cap_refinements_liquid_coolants.pdf" path="2013-05-14_end-cap_refinements_liquid_coolants.pdf" size="565292" user="gorbunov" version="1"
META FILEATTACHMENT attachment="2013-05-27a_first_3D_more_coolants.pdf" attr="h" comment="SIMU: First 3D" date="1381684678" name="2013-05-27a_first_3D_more_coolants.pdf" path="2013-05-27a_first_3D_more_coolants.pdf" size="682876" user="gorbunov" version="1"
META FILEATTACHMENT attachment="2013-05-30_Alu_jacket_liquid_cooling_air_cooling.pdf" attr="h" comment="SIMU: Alu skin, liquid, air cooling" date="1381684941" name="2013-05-30_Alu_jacket_liquid_cooling_air_cooling.pdf" path="2013-05-30_Alu_jacket_liquid_cooling_air_cooling.pdf" size="236818" user="gorbunov" version="1"
META FILEATTACHMENT attachment="2013-06-10_3D_with_Alu_liquid_multiport.pdf" attr="h" comment="SIMU: 3D with Alu, liquid, multiport" date="1381684982" name="2013-06-10_3D_with_Alu_liquid_multiport.pdf" path="2013-06-10_3D_with_Alu_liquid_multiport.pdf" size="804073" user="gorbunov" version="1"
META FILEATTACHMENT attachment="2013-08-01-SiPM_cooling_throuth_flex.pdf" attr="h" comment="SIMU: cooling through flex" date="1381685171" name="2013-08-01-SiPM_cooling_throuth_flex.pdf" path="2013-08-01-SiPM_cooling_throuth_flex.pdf" size="108204" user="gorbunov" version="1"
META FILEATTACHMENT attachment="2013-07-22_final_with_flex.pdf" attr="h" comment="SIMU: final with flex PCB" date="1381685329" name="2013-07-22_final_with_flex.pdf" path="2013-07-22_final_with_flex.pdf" size="782791" user="gorbunov" version="1"
META FILEATTACHMENT attachment="SiPM_cooling_specs_1.1.pdf" attr="" comment="Draft specs on SiPM cooling" date="1381688057" name="SiPM_cooling_specs_1.1.pdf" path="SiPM_cooling_specs_1.1.pdf" size="1664055" user="gorbunov" version="1"

Revision 52013-10-10 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Mandate

Line: 27 to 27
 

Status summary: 04 September 2013

  • 2-phase cooling tests started at the TOTEM test bench at H8 , initially with a specially designed isothermal box containing a real cooling pipe (evaporator), a simulation of the end-piece and SiPM array, as well as a heater simulating a heat load of about 10W.
  • Results on temperature uniformity obtained, with different pressure differentials.
Changed:
<
<
  • 2nd generation mockup has been constructed and installed at the H8.
>
>
  • 2nd generation mockup , implementing the end-cap concept adopted in July, has been constructed and installed at the H8.
 
  • The JULABO chiller for single-phase liquid tests installed at Point 8, in the 2885/2-201 lab
Changed:
<
<
  • A smaller new JULABO chiller F81ME, intended for D-module cooling, will be ordered shortly
>
>
  • A smaller new JULABO chiller F81ME/HL, intended for D-module cooling, will be ordered shortly

Status summary: 10 October 2013

  • 2-phase cooling tests continued with the new mockup, completed by September 16.
  • Two different insulation wall versions were tested. The total thermal load of the mockup was estimated as ~20W (including the external capillary and loosely insulated connection pipes), by observing the "dry-out" effect at the lowest temperatures at dummy SiPMs (down to -45...-48C). Under these conditions, the C3F8-based system had to be operated with a significant underpressure on the suction side (0.42 bara).
  • The reports about summer tests have been prepared by the CTU group
  • A new round of thermal analysis: evaluation of local parameters of a 2-phase cooling scheme (capillaries, mass flows, thermal cycle)
  • First series of single-phase liquid cooling tests with the (borrowed) Julabo chiller: completed by October 1.
  • Ordered:a JULABO chiller F81HL, intended for D-module cooling; the delivery is expected this week.
  • Preparation of the SiPM cooling workshop of October 17
 

Thermal simulation

Line: 77 to 85
 
  • Possible follow-up of the joint ITE project on Peltier cooling (PG, ITE) – about end-August – mid Septenber
  • Draft summary report on the SiPM cooling, choice of the cooling option for the Demo (PG) – end August- week 1 of September
September
Changed:
<
<
  • Final 2-phase cooling measurements (MD, PG) – weeks 1-2
  • Final report by the CTU group (VV, MD, ME) – weeks 2-3
  • Integration with the Demo module (PG, TS, all) – weeks 3-4, TBC
  • Work on the TDR section about the SiPM cooling (PG) – weeks 1-4
  • Liquid cooling measurements with Julabo chiller(PG) – weeks 3-4
  • Possible follow-up of the heat-pipe joint project with Thermacore Europe
>
>
  • Final 2-phase cooling measurements (MD, PG) – weeks 1-2
  • Final report by the CTU group (VV, MD, ME) – weeks 2-3
  • Integration with the Demo module (PG, TS, all) – weeks 3-4 - postpopned
  • Work on the TDR section about the SiPM cooling (PG) – postponed
  • Liquid cooling measurements with Julabo chiller(PG) – weeks 4
  • Possible follow-up of the heat-pipe joint project with Thermacore Europe - on hold
 Participants, abbreviations:
CTU – Czech Technical University (Prague)
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TBC – to be confirmed
TS – Trevor Savidge (IC)

(1) A full-scale model of the FT module end cap, intended to test various SiPM cooling options
(2) Czech Technical University, Prague. Group leader: Vaclav (Vic) Vacek
(3) Institute of Thermoelectricity, Chernovtsy, Ukraine. Director: Akad. Prof. L.I.Anatychuk
Deleted:
<
<

 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2.pdf" attr="" comment="Mockup-2 drawings" date="1375906480" name="Mockup2.pdf" path="Mockup2.pdf" size="302706" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Summary_3.07.2013.pdf" attr="" comment="Summary of %22Thermacore%22 option activities" date="1378238434" name="Summary_3.07.2013.pdf" path="Summary_3.07.2013.pdf" size="1125568" user="gorbunov" version="1"
META FILEATTACHMENT attachment="M.Doubek_Air_Cooling.jpg" attr="h" comment="M.Doubek at the Air Cooling setup in B.156" date="1378239015" name="M.Doubek_Air_Cooling.jpg" path="M.Doubek_Air_Cooling.jpg" size="638101" user="gorbunov" version="1"
META FILEATTACHMENT attachment="M.Doubek_Air_Cooling_-_Icon.jpg" attr="h" comment="" date="1378239055" name="M.Doubek_Air_Cooling_-_Icon.jpg" path="M.Doubek_Air_Cooling_-_Icon.jpg" size="42050" user="gorbunov" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Mockup2_at_H8.jpg" attr="h" comment="Mockup2 at the H8 test bench" date="1381356895" name="Mockup2_at_H8.jpg" path="Mockup2_at_H8.jpg" size="208888" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2_H8_icon.jpg" attr="h" comment="" date="1381357029" name="Mockup2_H8_icon.jpg" path="Mockup2_H8_icon.jpg" size="17306" user="gorbunov" version="1"

Revision 42013-09-03 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Mandate

Line: 23 to 23
 
  • The liquid cooling (2-phase) test bench at the TOTEM C3F8-based facility has been prepared. The initial measurements, using a special thermostatic enclosure with a controlled thermal load, began this week.
  • Mono-phase liquid cooling test setup will be based on the the FPW-91 Julabo chiller, already delivered, to be installed at Point 8.
  • Negotiations with Thermacore Europe Ltd: an offer to design and manufacture prototype low-temperature ammonia-filled heat-pipes was received. Due to a high price, this option had been put on hold. Solid metal heat spreader with external Peltier chiller is a viable option for a BGV-like module design (discussed with Massi and Fred, TBD with Guido)
Added:
>
>
mockup1_icon.jpg

Status summary: 04 September 2013

  • 2-phase cooling tests started at the TOTEM test bench at H8 , initially with a specially designed isothermal box containing a real cooling pipe (evaporator), a simulation of the end-piece and SiPM array, as well as a heater simulating a heat load of about 10W.
  • Results on temperature uniformity obtained, with different pressure differentials.
  • 2nd generation mockup has been constructed and installed at the H8.
  • The JULABO chiller for single-phase liquid tests installed at Point 8, in the 2885/2-201 lab
  • A smaller new JULABO chiller F81ME, intended for D-module cooling, will be ordered shortly
 

Thermal simulation

Line: 55 to 62
 
  • Start of the air cooling tests – preparation phase, calibrations etc (PG, VV, MD) – June 17
  • Construction of the 1st mock-up (GD, PG) – by end-June
July
Changed:
<
<
  • Draft report on the thermal simulation project (EdR, PG) – week 1-2
>
>
  • Draft report on the thermal simulation project (EdR, PG) – week 1-2, pending
 
  • 3rd round of CFD simulations: new end-cap design, 2-phase cooling (EdR, PG) – weeks 2-4
Changed:
<
<
  • Air cooling tests, main phase (ME, PG) – week 1-4
  • Liquid cooling tests (PG) – weeks 2-4
>
>
  • Air cooling tests, main phase (ME, PG) – week 1-4
  • Liquid cooling tests (PG) – weeks 2-4, shifted to September
 
  • Design and construct the 2nd version of the cooling mockup (PG, TS, GD) – weeks 3-4
Changed:
<
<
  • Preparation phase for the evaporative cooling option tests at H8 (VV, MD, GD) – weeks 1-4
>
>
  • Preparation phase for the evaporative cooling option tests at H8 (VV, MD, GD) – weeks 1-4
 
  • Intermediate report on the air and liquid cooling options tests (PG) – end of July
August
  • Petr is away (vacations) – 2-10 August, TBC
Changed:
<
<
  • Final air cooling measurements (ME) – weeks 1-2
  • Liquid cooling measurements with Julabo chiller(PG) – weeks 3-4
  • Start of 2-phase measurements at H8 (MD) – weeks 1 (or 2)
  • Possible follow-up of the joint ITE project on Peltier cooling (PG, ITE) – about end-August – mid Septenber
  • Draft summary report on the SiPM cooling, choice of the cooling option for the Demo (PG) – end August- week 1 of September
>
>
  • Final air cooling measurements (ME) – weeks 1-2
  • Liquid cooling measurements with Julabo chiller(PG) – weeks 3-4, shifted to September
  • Start of 2-phase measurements at H8 (MD) – weeks 1 (or 2)
  • Possible follow-up of the joint ITE project on Peltier cooling (PG, ITE) – about end-August – mid Septenber
  • Draft summary report on the SiPM cooling, choice of the cooling option for the Demo (PG) – end August- week 1 of September
 September
Changed:
<
<
  • Final 2-phase cooling measurements (MD, PG) – weeks 1-2
>
>
  • Final 2-phase cooling measurements (MD, PG) – weeks 1-2
 
  • Final report by the CTU group (VV, MD, ME) – weeks 2-3
  • Integration with the Demo module (PG, TS, all) – weeks 3-4, TBC
  • Work on the TDR section about the SiPM cooling (PG) – weeks 1-4
Added:
>
>
  • Liquid cooling measurements with Julabo chiller(PG) – weeks 3-4
 
  • Possible follow-up of the heat-pipe joint project with Thermacore Europe
Participants, abbreviations:
CTU – Czech Technical University (Prague)
Line: 82 to 90
 
Added:
>
>
 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
META FILEATTACHMENT attachment="Mockup2.pdf" attr="" comment="Mockup-2 drawings" date="1375906480" name="Mockup2.pdf" path="Mockup2.pdf" size="302706" user="gorbunov" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Summary_3.07.2013.pdf" attr="" comment="Summary of %22Thermacore%22 option activities" date="1378238434" name="Summary_3.07.2013.pdf" path="Summary_3.07.2013.pdf" size="1125568" user="gorbunov" version="1"
META FILEATTACHMENT attachment="M.Doubek_Air_Cooling.jpg" attr="h" comment="M.Doubek at the Air Cooling setup in B.156" date="1378239015" name="M.Doubek_Air_Cooling.jpg" path="M.Doubek_Air_Cooling.jpg" size="638101" user="gorbunov" version="1"
META FILEATTACHMENT attachment="M.Doubek_Air_Cooling_-_Icon.jpg" attr="h" comment="" date="1378239055" name="M.Doubek_Air_Cooling_-_Icon.jpg" path="M.Doubek_Air_Cooling_-_Icon.jpg" size="42050" user="gorbunov" version="1"

Revision 32013-08-07 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Mandate

Line: 16 to 16
 
  • Preparation for the liquid cooling (2-phase) tests is ongoing. The tests will be performed at the TOTEM C3F8-based facility. Mono-phase liquid cooling test setup is being designed (2-stage, with a -10C pre-cooler and a Peltier-based main cooler, down to -50C).
  • Useful links with the industry have been established in May-June: Institute of Thermoelectricity (UA) - specialized Peltier coolers, Thermacore Europe (UK) - low-temperature heat-pipes, composite heat-spreaders.
mockup1_icon.jpg
Added:
>
>

Status summary: 07 August 2013

  • The work on the air cooling tests continued in July. 4 different options of a cooling pipe have been tested with a full-scale end-cap mockup #1. The compressed air conditioning was upgraded by adding an industrial air dryer. The report is being prepared by the CTU team (expected date: August 10).
  • 2nd generation mockup was designed for the upcoming 2-phase cooling tests, using the concept discussed within the end-cap working group. The parts have been made, but not assembled, yet.
  • The simulation work is largely completed. The latest end-cap design has an estimated heat load of 5.7W per module side. In addition, promising results were obtained for "the cooling-though-flexPCB" option (to be discussed with the SiPM community). The summary report is under preparation.
  • The liquid cooling (2-phase) test bench at the TOTEM C3F8-based facility has been prepared. The initial measurements, using a special thermostatic enclosure with a controlled thermal load, began this week.
  • Mono-phase liquid cooling test setup will be based on the the FPW-91 Julabo chiller, already delivered, to be installed at Point 8.
  • Negotiations with Thermacore Europe Ltd: an offer to design and manufacture prototype low-temperature ammonia-filled heat-pipes was received. Due to a high price, this option had been put on hold. Solid metal heat spreader with external Peltier chiller is a viable option for a BGV-like module design (discussed with Massi and Fred, TBD with Guido)
 

Thermal simulation

Added:
>
>
 

Cooling options

  • Liquid cooling (mono-phase or 2-phase) - CERN, EN-CV group
Line: 47 to 56
 
  • Construction of the 1st mock-up (GD, PG) – by end-June
July
  • Draft report on the thermal simulation project (EdR, PG) – week 1-2
Changed:
<
<
  • 3rd round of CFD simulations: new end-cap design, 2-phase cooling (EdR, PG) – weeks 2-4
>
>
  • 3rd round of CFD simulations: new end-cap design, 2-phase cooling (EdR, PG) – weeks 2-4
 
  • Air cooling tests, main phase (ME, PG) – week 1-4
Changed:
<
<
  • Liquid cooling tests (PG) – weeks 2-4
  • Design and construct the 2nd version of the cooling mockup (PG, TS, GD) – weeks 3-4
>
>
  • Liquid cooling tests (PG) – weeks 2-4
  • Design and construct the 2nd version of the cooling mockup (PG, TS, GD) – weeks 3-4
 
  • Preparation phase for the evaporative cooling option tests at H8 (VV, MD, GD) – weeks 1-4
Changed:
<
<
  • Intermediate report on the air and liquid cooling options tests (PG) – end of July
>
>
  • Intermediate report on the air and liquid cooling options tests (PG) – end of July
 August
  • Petr is away (vacations) – 2-10 August, TBC
  • Final air cooling measurements (ME) – weeks 1-2
Changed:
<
<
  • Final liquid cooling measurements (PG) – weeks 3-4
>
>
  • Liquid cooling measurements with Julabo chiller(PG) – weeks 3-4
 
  • Start of 2-phase measurements at H8 (MD) – weeks 1 (or 2)
  • Possible follow-up of the joint ITE project on Peltier cooling (PG, ITE) – about end-August – mid Septenber
  • Draft summary report on the SiPM cooling, choice of the cooling option for the Demo (PG) – end August- week 1 of September
Line: 71 to 80
 
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TBC – to be confirmed
TS – Trevor Savidge (IC)

(1) A full-scale model of the FT module end cap, intended to test various SiPM cooling options
(2) Czech Technical University, Prague. Group leader: Vaclav (Vic) Vacek
(3) Institute of Thermoelectricity, Chernovtsy, Ukraine. Director: Akad. Prof. L.I.Anatychuk
Added:
>
>
 
META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Mockup2.pdf" attr="" comment="Mockup-2 drawings" date="1375906480" name="Mockup2.pdf" path="Mockup2.pdf" size="302706" user="gorbunov" version="1"

Revision 22013-07-05 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Mandate

Line: 7 to 7
  Tasks:
  • Assess and measure heat load
Changed:
<
<
  • Demosctrate long operation, cycling, condensation
>
>
  • Demonstrate long operation, cycling, condensation
 
  • Thermal cycling to demostrate mechanical robustness, absence of leaks etc
Added:
>
>

Status summary: 05 July 2013

  • Chilled air cooling lab has been set up. A CTU student is working full-time on the air cooling tests. 4 different options of a cooling pipe will be tested: 3 round tubes with and without inner structures, a rectangular multi-finned radiator (baseline). Currently, the compressed air conditioning is being upgraded.
  • Full-scale mockup of a single end-cap, with 6 cm outer plug and ~13 cm support plate fragment has been constructed. It will be used mostly for the air-cooling tests.
  • The simulation work was paused since mid June, upon completion of the heat load study for the generic end-cap design. The result: 7.5 W per module side. The work will be resumed, once the consensus on the end-cap configuration has been achieved. The intermediate report will be ready shortly.
  • Preparation for the liquid cooling (2-phase) tests is ongoing. The tests will be performed at the TOTEM C3F8-based facility. Mono-phase liquid cooling test setup is being designed (2-stage, with a -10C pre-cooler and a Peltier-based main cooler, down to -50C).
  • Useful links with the industry have been established in May-June: Institute of Thermoelectricity (UA) - specialized Peltier coolers, Thermacore Europe (UK) - low-temperature heat-pipes, composite heat-spreaders.
mockup1_icon.jpg
 

Thermal simulation

Cooling options

Added:
>
>
  • Liquid cooling (mono-phase or 2-phase) - CERN, EN-CV group
  • Air cooling - CERN, CTU
  • Hybrid options
    • Air, with pre-cooling - CERN, CTU
    • Liquid/thermoelectric - CERN, ITE
    • Heat pipe/thermoelectric - CERN, Thermacore (, ITE)
    • integrated TE cooling if SiPMs (a micro-Peltier module in the SiPM package) - proposed by ITE, currently this option is not pursued.
 

Schedule

SiPM cooling schedule: May-September 2013

Line: 18 to 34
 (Overview of main activities, transient activities are not mentioned). Completed activities are marked in green, ongoing – in brown, scheduled – in black, critical path -- red).

May

Changed:
<
<
  • 1st round of thermal CFD analysis: head load and temperature profiles, mostly 2D (PG, EdR)
  • A feasibility study of the single-phase liquid cooling option (infrastructure) (PG, Julabo)
  • Order materials for the cooling mock-up(1), design of the 1st mockup version (PG)
  • Set up cooperation with the CTU(2) group (air and evaporative cooling options) (PG, RL, VV)
  • Set up cooperation with ITE(3) on the Peltier cooling option (PG, ITE) – by end-May
  • Prepare the air cooling lab facilities (PG, GD)
>
>
  • 1st round of thermal CFD analysis: head load and temperature profiles, mostly 2D (PG, EdR)
  • A feasibility study of the single-phase liquid cooling option (infrastructure) (PG, Julabo)
  • Order materials for the cooling mock-up(1), design of the 1st mockup version (PG)
  • Set up cooperation with the CTU(2) group (air and evaporative cooling options) (PG, RL, VV)
  • Set up cooperation with ITE(3) on the Peltier cooling option (PG, ITE) – by end-May
  • Prepare the air cooling lab facilities (PG, GD)
 June
Changed:
<
<
  • Order materials for the liquid cooling tests (PG) – week 1-2
  • 2nd round of CFD simulations: 3D, air cooling, 2-phase cooling (EdR, PG) – weeks 1-4
  • Start of the air cooling tests – preparation phase, calibrations etc (PG, VV, MD) – June 17
  • Construction of the 1st mock-up (GD, PG) – by end-June
  • Design and construct the 2nd version of the cooling mockup (PG, TS, GD) – weeks 2-3
  • Draft report on the thermal simulation project (!EdR, PG) – end of June
>
>
  • Contacts with Thermacore Europe: "heat pipe" cooling option - weeks 1,3
  • 2nd round of CFD simulations: 3D, air cooling, heat load evaluation (EdR, PG) – weeks 1-3
  • Start of the air cooling tests – preparation phase, calibrations etc (PG, VV, MD) – June 17
  • Construction of the 1st mock-up (GD, PG) – by end-June
 July
Changed:
<
<
  • Air cooling tests, main phase (ME, PG) – week 1-4
  • Liquid cooling tests (PG) – weeks 1-4
  • Design and construct the 3rd version of the cooling mockup (PG, TS, GD) – weeks 3-4
  • Preparation phase for the evaporative cooling option tests at H8 (VV, MD) – weeks 1-4
  • Intermediate report on the air and liquid cooling options tests (PG) – by end of July
>
>
  • Draft report on the thermal simulation project (EdR, PG) – week 1-2
  • 3rd round of CFD simulations: new end-cap design, 2-phase cooling (EdR, PG) – weeks 2-4
  • Air cooling tests, main phase (ME, PG) – week 1-4
  • Liquid cooling tests (PG) – weeks 2-4
  • Design and construct the 2nd version of the cooling mockup (PG, TS, GD) – weeks 3-4
  • Preparation phase for the evaporative cooling option tests at H8 (VV, MD, GD) – weeks 1-4
  • Intermediate report on the air and liquid cooling options tests (PG) – end of July
 August
  • Petr is away (vacations) – 2-10 August, TBC
  • Final air cooling measurements (ME) – weeks 1-2
Line: 49 to 65
 
  • Final report by the CTU group (VV, MD, ME) – weeks 2-3
  • Integration with the Demo module (PG, TS, all) – weeks 3-4, TBC
  • Work on the TDR section about the SiPM cooling (PG) – weeks 1-4
Added:
>
>
  • Possible follow-up of the heat-pipe joint project with Thermacore Europe
 Participants, abbreviations:
Deleted:
<
<
CTU – Czech Technical University (Prague)
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TBC – to be confirmed
TS – Trevor Savidge (IC)
(1) A full-scale model of the FT module end cap, intended to test various SiPM cooling options
(2) Czech Technical University, Prague. Group leader: Vaclav (Vic) Vacek
(3) Institute of Thermoelectricity, Chernovtsy, Ukraine. Director: Akad. Prof. L.I.Anatychuk
 \ No newline at end of file
Added:
>
>
CTU – Czech Technical University (Prague)
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TBC – to be confirmed
TS – Trevor Savidge (IC)

(1) A full-scale model of the FT module end cap, intended to test various SiPM cooling options
(2) Czech Technical University, Prague. Group leader: Vaclav (Vic) Vacek
(3) Institute of Thermoelectricity, Chernovtsy, Ukraine. Director: Akad. Prof. L.I.Anatychuk

META FILEATTACHMENT attachment="030720131346.jpg" attr="h" comment="The mockup#1 for the air cooling tests, in B.156" date="1373051161" name="030720131346.jpg" path="030720131346.jpg" size="677794" user="gorbunov" version="1"
META FILEATTACHMENT attachment="mockup1_icon.jpg" attr="h" comment="Mockup#1 icon" date="1373052293" name="mockup1_icon.jpg" path="mockup1_icon.jpg" size="41335" user="gorbunov" version="1"

Revision 12013-06-25 - PetrGorbounov

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="SciFiDemoModule"

LHCb FT SiPM Cooling workpackage

Mandate

PG advises, simulates. Imperial: engineering design and construction.

Tasks:

  • Assess and measure heat load
  • Demosctrate long operation, cycling, condensation
  • Thermal cycling to demostrate mechanical robustness, absence of leaks etc

Thermal simulation

Cooling options

Schedule

SiPM cooling schedule: May-September 2013

(Overview of main activities, transient activities are not mentioned). Completed activities are marked in green, ongoing – in brown, scheduled – in black, critical path -- red).

May

  • 1st round of thermal CFD analysis: head load and temperature profiles, mostly 2D (PG, EdR)
  • A feasibility study of the single-phase liquid cooling option (infrastructure) (PG, Julabo)
  • Order materials for the cooling mock-up(1), design of the 1st mockup version (PG)
  • Set up cooperation with the CTU(2) group (air and evaporative cooling options) (PG, RL, VV)
  • Set up cooperation with ITE(3) on the Peltier cooling option (PG, ITE) – by end-May
  • Prepare the air cooling lab facilities (PG, GD)
June
  • Order materials for the liquid cooling tests (PG) – week 1-2
  • 2nd round of CFD simulations: 3D, air cooling, 2-phase cooling (EdR, PG) – weeks 1-4
  • Start of the air cooling tests – preparation phase, calibrations etc (PG, VV, MD) – June 17
  • Construction of the 1st mock-up (GD, PG) – by end-June
  • Design and construct the 2nd version of the cooling mockup (PG, TS, GD) – weeks 2-3
  • Draft report on the thermal simulation project (!EdR, PG) – end of June
July
  • Air cooling tests, main phase (ME, PG) – week 1-4
  • Liquid cooling tests (PG) – weeks 1-4
  • Design and construct the 3rd version of the cooling mockup (PG, TS, GD) – weeks 3-4
  • Preparation phase for the evaporative cooling option tests at H8 (VV, MD) – weeks 1-4
  • Intermediate report on the air and liquid cooling options tests (PG) – by end of July
August
  • Petr is away (vacations) – 2-10 August, TBC
  • Final air cooling measurements (ME) – weeks 1-2
  • Final liquid cooling measurements (PG) – weeks 3-4
  • Start of 2-phase measurements at H8 (MD) – weeks 1 (or 2)
  • Possible follow-up of the joint ITE project on Peltier cooling (PG, ITE) – about end-August – mid Septenber
  • Draft summary report on the SiPM cooling, choice of the cooling option for the Demo (PG) – end August- week 1 of September
September
  • Final 2-phase cooling measurements (MD, PG) – weeks 1-2
  • Final report by the CTU group (VV, MD, ME) – weeks 2-3
  • Integration with the Demo module (PG, TS, all) – weeks 3-4, TBC
  • Work on the TDR section about the SiPM cooling (PG) – weeks 1-4
Participants, abbreviations:
CTU – Czech Technical University (Prague)
EdR – Enrico da Riva (EN-CV-PJ)
GD – Gerard Decreuse
ITE – Inst. Of Thermoelectricity (Chernovtsy)
MD – Martin Doubek (CTU)
ME – Miroslav Erben (CTU)
PG – Petr Gorbounov
RL – Rolf Lindner
VV – Vic Vaceck (CTU)
TBC – to be confirmed
TS – Trevor Savidge (IC)
(1) A full-scale model of the FT module end cap, intended to test various SiPM cooling options
(2) Czech Technical University, Prague. Group leader: Vaclav (Vic) Vacek
(3) Institute of Thermoelectricity, Chernovtsy, Ukraine. Director: Akad. Prof. L.I.Anatychuk
 