The Prototype SciFi C-Frame

Line: 33 to 33
 
  • What are we checking or measuring at each step? ­Tolerances, deformations, etc?
  • ­What do we need to measure or evaluate at each step? Survey?
  • What happens if a part isn’t fitting/working/available? ­Do we reproduce it for the prototype? Or just boot-strap it on. ­Case by case basis
Added:
>
>
  • assess the duration of the individual steps and define a realistic schedule for the series production
  • learn the transfer of the C-frames between the various frames and cages
 -- BlakeLeverington - 2018-01-29

META FILEATTACHMENT attachment="Prototype_C-Frame_with_22_modules_next_to_the_beam_pipe.1.jpg" attr="" comment="pictures of the prototype C-Frame from CAD models" date="1517212634" name="Prototype_C-Frame_with_22_modules_next_to_the_beam_pipe.1.jpg" path="Prototype_C-Frame_with_22_modules_next_to_the_beam_pipe.1.jpg" size="217679" user="bleverin" version="1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback