Revision 212018-11-27 - BlakeLeverington

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 74 to 74
 

-- JeroenVanTilburg - 26 Jun 2014 \ No newline at end of file

Added:
>
>
META TOPICMOVED by="bleverin" date="1543338903" from="LHCb.ReadoutBox" to="LHCb.SciFiReadoutBox"

Revision 202015-05-18 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 56 to 56
 

Presentations

Added:
>
>
 

Revision 192015-05-12 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 56 to 56
 

Presentations

Changed:
<
<
>
>
 

Revision 182015-04-01 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 14 to 14
 
  • Thermal design
  • Staggering design cooling pipes in the stereo layers
Changed:
<
<

Design specifications for the Readout Box

>
>

Useful links

 
Deleted:
<
<
 

Issues

Revision 172015-03-13 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 54 to 54
 

Presentations

Changed:
<
<
>
>
 

Revision 162015-01-22 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 54 to 54
 

Presentations

Added:
>
>
 

Revision 152014-12-14 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 54 to 54
 

Presentations

Added:
>
>
 

Revision 142014-11-25 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 54 to 54
 

Presentations

Added:
>
>
 

Revision 132014-11-21 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 54 to 54
 

Presentations

Added:
>
>
 

Revision 122014-11-13 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 46 to 46
 
  • Define interface to modules for Module EDR: 15 June 2015
  • Write documentation: Aug - Sep 2015
  • Engineering Design Review: 1 December 2015
Added:
>
>
  • Use prototype in test beam: October - November 2015
 
  • Order final parts: Oct - Nov 2015
  • Tooling for production ready: 1 December 2015
  • First batch of ROBs produced: 1 January 2016

Revision 112014-11-13 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 43 to 43
 
  • First prototype ready: 1 February 2015
  • Cooling tests: February-April 2015
  • Iterate on design and testing: May - Jul 2015
Added:
>
>
  • Define interface to modules for Module EDR: 15 June 2015
 
  • Write documentation: Aug - Sep 2015
Changed:
<
<
  • Engineering Design Review: 1 October 2015
>
>
  • Engineering Design Review: 1 December 2015
 
  • Order final parts: Oct - Nov 2015
  • Tooling for production ready: 1 December 2015
  • First batch of ROBs produced: 1 January 2016

Revision 102014-10-31 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 37 to 37
 

Next milestones and reviews

Changed:
<
<
  • Design concept ready: 1 December 2014
  • First prototype ready: 1 April 2015
  • Engineering Design Review: 1 June 2015
  • Tooling ready: 1 October 2015
  • First batch of ROBs produced: 1 November 2015
  • Production Readiness Review: 1 December 2015
>
>
  • Design of cooling bar ready: 14 November 2014
  • Full design concept ready: 1 December 2014
  • Order prototyping parts: December 2014
  • First prototype ready: 1 February 2015
  • Cooling tests: February-April 2015
  • Iterate on design and testing: May - Jul 2015
  • Write documentation: Aug - Sep 2015
  • Engineering Design Review: 1 October 2015
  • Order final parts: Oct - Nov 2015
  • Tooling for production ready: 1 December 2015
  • First batch of ROBs produced: 1 January 2016
  • Production Readiness Review: 1 February 2016
 

Presentations

Revision 92014-10-28 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 46 to 46
 

Presentations

Added:
>
>
 

Revision 82014-10-07 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 46 to 46
 

Presentations

Added:
>
>
 

Revision 72014-09-25 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 39 to 39
 
  • Design concept ready: 1 December 2014
  • First prototype ready: 1 April 2015
Changed:
<
<
  • Engineering Design Review: 1 June 2015
>
>
  • Engineering Design Review: 1 June 2015
 
  • Tooling ready: 1 October 2015
  • First batch of ROBs produced: 1 November 2015
Changed:
<
<
  • Production Readiness Review: 1 December 2015
>
>
  • Production Readiness Review: 1 December 2015
 

Presentations

Revision 62014-09-23 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 22 to 22
 
  • Thermal design: CTE's, stresses, deformations
  • Alignment of SiPMs
Changed:
<
<
  • Insulation of cold volume (at -40 C) from ambient.
>
>
  • Optical contact SiPMs and fibres.
  • Insulation of cold volume (at -40 C) from ambient and piping.
 
  • High density of interfaces: SiPMs, module suspension, electronics, feedthroughs for cooling (electronics and SiPMs).

Contributing institutes

Line: 37 to 38
 

Next milestones and reviews

  • Design concept ready: 1 December 2014
Changed:
<
<
  • Prototype design ready: Start of 2015
  • Engineering Design Review: 1 April 2015
  • Prototyping and cooling tests: Middle 2015
  • Tooling and first production: Summer 2015
  • Production Readiness Review: 1 October 2015
>
>
  • First prototype ready: 1 April 2015
  • Engineering Design Review: 1 June 2015
  • Tooling ready: 1 October 2015
  • First batch of ROBs produced: 1 November 2015
  • Production Readiness Review: 1 December 2015
 

Presentations

Revision 52014-09-22 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 45 to 45
 

Presentations

Added:
>
>
 

Revision 42014-07-17 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 14 to 14
 
  • Thermal design
  • Staggering design cooling pipes in the stereo layers
Added:
>
>

Design specifications for the Readout Box

 

Issues

  • Thermal design: CTE's, stresses, deformations

Revision 32014-07-14 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 32 to 32
 

Next milestones and reviews

Changed:
<
<
  • Prototype design ready (end 2014)
  • Prototyping and cooling tests (middle 2015)
  • Tooling and first production for PRR (end 2015)
>
>
  • Design concept ready: 1 December 2014
  • Prototype design ready: Start of 2015
  • Engineering Design Review: 1 April 2015
  • Prototyping and cooling tests: Middle 2015
  • Tooling and first production: Summer 2015
  • Production Readiness Review: 1 October 2015
 

Presentations

Revision 22014-07-09 - JeroenVanTilburg

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

Line: 16 to 16
 

Issues

Changed:
<
<
  • Thermal design: CTA's, stresses, deformations
>
>
  • Thermal design: CTE's, stresses, deformations
 
  • Alignment of SiPMs
Changed:
<
<
  • Insulation of cold volume (at -50 C) from ambient.
>
>
  • Insulation of cold volume (at -40 C) from ambient.
 
  • High density of interfaces: SiPMs, module suspension, electronics, feedthroughs for cooling (electronics and SiPMs).

Contributing institutes

Line: 39 to 39
 

Presentations

Added:
>
>
  -- JeroenVanTilburg - 26 Jun 2014

Revision 12014-06-26 - JeroenVanTilburg

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="UpgradeSciFiTracker"

Work package: Readout box (aka ROB)

WP leader: Jeroen.van.Tilburg@cernNOSPAMPLEASE.ch

Scope

The work package deals with the development and building of the Readout Box, which interfaces to fibre modules, SiPM, electronics, cooling and mechanics. The downstream parts (from the last patch panel) of the evacuation systems of the (warm) electronics and the cold (SiPMs) are part of the WP.

Current main activities

  • Thermal design
  • Staggering design cooling pipes in the stereo layers

Issues

  • Thermal design: CTA's, stresses, deformations
  • Alignment of SiPMs
  • Insulation of cold volume (at -50 C) from ambient.
  • High density of interfaces: SiPMs, module suspension, electronics, feedthroughs for cooling (electronics and SiPMs).

Contributing institutes

  • Nikhef
  • CERN
  • Heidelberg
  • Clermont-Ferrand
  • EPFL
  • Aachen

Next milestones and reviews

  • Prototype design ready (end 2014)
  • Prototyping and cooling tests (middle 2015)
  • Tooling and first production for PRR (end 2015)

Presentations

-- JeroenVanTilburg - 26 Jun 2014

 