Difference: ShifterInfo (1 vs. 5)

Revision 52008-08-17 - EddyJans

Line: 1 to 1
 
META TOPICPARENT name="LHCbVELO"

VELO Shifter Information

Changed:
<
<
  • Every shifter should read this in order to be updated about the latest news and possible modifications of standard procedures.
>
>
  • Every shifter should read this in order to be updated about the latest news and possible modifications of standard procedures.
 
  • The VELO Operating manuals can be found here.
  • At the beginning of each shift a checklist should be filled in and subsequently uploaded to the VELO-Commissioning ELOG .
  • Make sure the summary panel, that shows the overal status of the VELO, is continuously visible on one of the 2 big screens. For instructions see the section Summary panel here.
Line: 15 to 15
 -- EddyJans - 16 Aug 2008

Deleted:
<
<
META FILEATTACHMENT attachment="breakingnewsforveloshifter" attr="" comment="breakingnews" date="1218873792" name="breakingnewsforveloshifter" path="C:\Documents and Settings\eddy\My Documents\breakingnewsforveloshifter" size="91" stream="C:\Documents and Settings\eddy\My Documents\breakingnewsforveloshifter" user="Main.EddyJans" version="1"
 
META FILEATTACHMENT attachment="shifterchecklist.080816" attr="" comment="checklist" date="1218873940" name="shifterchecklist.080816" path="C:\Documents and Settings\eddy\My Documents\shifterchecklist.080816" size="890" stream="C:\Documents and Settings\eddy\My Documents\shifterchecklist.080816" user="Main.EddyJans" version="1"
Added:
>
>
META FILEATTACHMENT attachment="breakingnews4veloshifter.txt" attr="" comment="breakingnews4shifter.txt" date="1218988531" name="breakingnews4veloshifter.txt" path="C:\Documents and Settings\Administrator\My Documents\breakingnews4veloshifter.txt" size="469" stream="C:\Documents and Settings\Administrator\My Documents\breakingnews4veloshifter.txt" user="Main.EddyJans" version="1"

Revision 42008-08-17 - EddyJans

Line: 1 to 1
 
META TOPICPARENT name="LHCbVELO"

VELO Shifter Information

Line: 10 to 10
 
  • Please monitor the data that is being collected during Global Commissioning, by means of the on-line monitoring tools (to be provided) and analysis with Vetra and root.
  • There is a VELO-picquet service, which you can call in case of unsolvable problems. Evidently a relation between the seriousness of the error and the time of day/night is greatly appreciated. For further information about contacting the VELO-picquet see here.
  • The shift schedule can be found here.
Changed:
<
<
  • Please make an entry in the ELOG of all things you notice and consider worthwhile being documented for further generations.
>
>
  • Please make an entry in the ELOG of all things you notice and consider worthwhile being documented for further generations. Don't forget to report your own name, since otherwise it requires a lot of detective work afterwards to reconstruct who has done what.
  -- EddyJans - 16 Aug 2008

Revision 32008-08-17 - EddyJans

Line: 1 to 1
 
META TOPICPARENT name="LHCbVELO"

VELO Shifter Information

  • Every shifter should read this in order to be updated about the latest news and possible modifications of standard procedures.
Added:
>
>
  • The VELO Operating manuals can be found here.
 
  • At the beginning of each shift a checklist should be filled in and subsequently uploaded to the VELO-Commissioning ELOG .
  • Make sure the summary panel, that shows the overal status of the VELO, is continuously visible on one of the 2 big screens. For instructions see the section Summary panel here.
  • Please monitor the data that is being collected during Global Commissioning, by means of the on-line monitoring tools (to be provided) and analysis with Vetra and root.

Revision 22008-08-16 - EddyJans

Line: 1 to 1
 
META TOPICPARENT name="LHCbVELO"

VELO Shifter Information

  • Every shifter should read this in order to be updated about the latest news and possible modifications of standard procedures.
Changed:
<
<
  • At the beginning of each shift a checklist should be filled in and subsequently uploaded to the VELO-Commissioning ELOG ( http://lbweb01.cern.ch/VELO/ ).
  • Make sure the summary panel representing the overal status of the VELO is continuously visible on one of the 2 big screens. For instructions see makealinkhere.
  • Please monitor the data that is being collected during Global Commissioning, by means of the on-line monitoring tools (to be provided) and analysis with Vetra(makealinkhere).
  • There is a VELO-picquet service, which you can call in case of unsolvable problems. Evidently a relation between the seriousness of the error and the time of day/night is greatly appreciated. The VELO-picquet can be reached at 165829. For further information see makealinkhere.
  • The shift schedule can be found makealinkhere.
  • Please make an antry in http://lbweb01.cern.ch/VELO/ of all things you notice and consider worthwhile being documented for further generations.
>
>
  • At the beginning of each shift a checklist should be filled in and subsequently uploaded to the VELO-Commissioning ELOG .
  • Make sure the summary panel, that shows the overal status of the VELO, is continuously visible on one of the 2 big screens. For instructions see the section Summary panel here.
  • Please monitor the data that is being collected during Global Commissioning, by means of the on-line monitoring tools (to be provided) and analysis with Vetra and root.
  • There is a VELO-picquet service, which you can call in case of unsolvable problems. Evidently a relation between the seriousness of the error and the time of day/night is greatly appreciated. For further information about contacting the VELO-picquet see here.
  • The shift schedule can be found here.
  • Please make an entry in the ELOG of all things you notice and consider worthwhile being documented for further generations.
  -- EddyJans - 16 Aug 2008

Revision 12008-08-16 - EddyJans

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="LHCbVELO"

VELO Shifter Information

  • Every shifter should read this in order to be updated about the latest news and possible modifications of standard procedures.
  • At the beginning of each shift a checklist should be filled in and subsequently uploaded to the VELO-Commissioning ELOG ( http://lbweb01.cern.ch/VELO/ ).
  • Make sure the summary panel representing the overal status of the VELO is continuously visible on one of the 2 big screens. For instructions see makealinkhere.
  • Please monitor the data that is being collected during Global Commissioning, by means of the on-line monitoring tools (to be provided) and analysis with Vetra(makealinkhere).
  • There is a VELO-picquet service, which you can call in case of unsolvable problems. Evidently a relation between the seriousness of the error and the time of day/night is greatly appreciated. The VELO-picquet can be reached at 165829. For further information see makealinkhere.
  • The shift schedule can be found makealinkhere.
  • Please make an antry in http://lbweb01.cern.ch/VELO/ of all things you notice and consider worthwhile being documented for further generations.

-- EddyJans - 16 Aug 2008

META FILEATTACHMENT attachment="breakingnewsforveloshifter" attr="" comment="breakingnews" date="1218873792" name="breakingnewsforveloshifter" path="C:\Documents and Settings\eddy\My Documents\breakingnewsforveloshifter" size="91" stream="C:\Documents and Settings\eddy\My Documents\breakingnewsforveloshifter" user="Main.EddyJans" version="1"
META FILEATTACHMENT attachment="shifterchecklist.080816" attr="" comment="checklist" date="1218873940" name="shifterchecklist.080816" path="C:\Documents and Settings\eddy\My Documents\shifterchecklist.080816" size="890" stream="C:\Documents and Settings\eddy\My Documents\shifterchecklist.080816" user="Main.EddyJans" version="1"
 