Project Scope

Line: 115 to 115
 
META FILEATTACHMENT attachment="Checklist_for_TB.xlsx" attr="" comment="" date="1465388364" name="Checklist_for_TB.xlsx" path="Checklist_for_TB.xlsx" size="8975" user="akuonen" version="1"
META FILEATTACHMENT attachment="Nim_crate.pdf" attr="" comment="" date="1467961991" name="Nim_crate.pdf" path="Nim_crate.pdf" size="2628859" user="akuonen" version="1"
META FILEATTACHMENT attachment="Metalic_box.jpg" attr="" comment="" date="1471436466" name="Metalic_box.jpg" path="Metalic_box.jpg" size="2725642" user="akuonen" version="1"
Added:
>
>
META TOPICMOVED by="bleverin" date="1543339207" from="LHCb.SciFiSiPM" to="LHCb.SiPM"

Revision 182018-10-08 - SurapatEkIn1

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 96 to 96
  TestbeamJuly2018 (SHiPCharm)
Added:
>
>
TestbeamOct2018
 

Presentation given in LHCb meetings

Revision 172018-09-07 - AnaCavalcante

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 96 to 94
  TestbeamOct2017
Added:
>
>
TestbeamJuly2018 (SHiPCharm)
 

Presentation given in LHCb meetings

Revision 162017-10-02 - AxelKevinKuonen

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 94 to 94
  TestbeamMay2016
Added:
>
>
TestbeamOct2017
 

Presentation given in LHCb meetings

Revision 152016-09-13 - AxelKevinKuonen

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 62 to 62
  The procedure to bring material into the North Area (H8A) by crane:
  • Pack all the material on a metalique pallet
Changed:
<
<
  • 1-2 days before installation fill an EDH request for Internal Transport / Handling Request. An exemple of the document can be seen here. Material is moved from bldg887(EHN1) RC37 buffer zone to H8A. The document should include a picture of the material to transport.
>
>
  • 1-2 days before installation fill an EDH request for Internal Transport / Handling Request. An exemple of the document can be seen here. Material is moved from bldg887(EHN1) RC37 buffer zone to H8A. The document should include a picture of the material to transport. One should ask for a "transpalette" to bring the material from the bus to the area.
 
  • !!! Put a copy of the EDH document on the pallet !!!
  • Contact person for the crane transport: M. Pierre Sorgues (164765).
  • Bring the pallet to the North Area, side RC-37 (buffer zone) and contact Pierre Sorgues (164765) for the crane transport. Specify you will need a transporteur to move the pallet out of the car.

The procedure to bring material back to EPFL from North Area (H8A):

  • Pack all the material on a metalique pallet
Changed:
<
<
  • 1-2 days before installation fill an EDH request for Internal Transport / Handling Request. An exemple of the document can be seen here0. Material is moved from H8A to bldg887(EHN1) RC-37 buffer zone. The document should include a picture of the material to transport.
>
>
  • 1-2 days before installation fill an EDH request for Internal Transport / Handling Request. An exemple of the document can be seen here0. Material is moved from H8A to bldg887(EHN1) RC-37 buffer zone. The document should include a picture of the material to transport. One should ask for a "transpalette" to bring the material from the bus to the area.
 
  • !!! Put a copy of the EDH document on the pallet !!!
  • The day of transport contact Pierre Sorgues (164765) for the crane transport. He will move the pallet into the buffer zone HC37 for radiation inspection. Specify you will need a transporteur after the radiation check.
  • Fill a TREC request on the computer inside the buffer zone RC-37. Follow the instruction, use H for the shipment adress (outside from Cern ...). Use the stickers for the bar code and stick them on the material

Revision 142016-08-17 - AxelKevinKuonen

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 82 to 82
  A check list for the material can be found here : * Checklist_for_TB.xlsx
Added:
>
>
Metalic boxes are available for transportation in the mechanical workshop (picture in attachement).
 The Nim crate setup used in May 2016 can be found here :

Line: 115 to 117
 
META FILEATTACHMENT attachment="EDH_request_move_in_material.pdf" attr="" comment="" date="1464102748" name="EDH_request_move_in_material.pdf" path="EDH_request_move_in_material.pdf" size="208049" user="akuonen" version="1"
META FILEATTACHMENT attachment="Checklist_for_TB.xlsx" attr="" comment="" date="1465388364" name="Checklist_for_TB.xlsx" path="Checklist_for_TB.xlsx" size="8975" user="akuonen" version="1"
META FILEATTACHMENT attachment="Nim_crate.pdf" attr="" comment="" date="1467961991" name="Nim_crate.pdf" path="Nim_crate.pdf" size="2628859" user="akuonen" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Metalic_box.jpg" attr="" comment="" date="1471436466" name="Metalic_box.jpg" path="Metalic_box.jpg" size="2725642" user="akuonen" version="1"

Revision 132016-07-08 - AxelKevinKuonen

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 82 to 82
  A check list for the material can be found here : * Checklist_for_TB.xlsx
Added:
>
>
The Nim crate setup used in May 2016 can be found here :

 Links to Testbeam twiki pages for the SciFi telescope:

TestbeamNov2015

Line: 110 to 114
 
META FILEATTACHMENT attachment="EDH_request_remove_material.pdf" attr="" comment="" date="1464102281" name="EDH_request_remove_material.pdf" path="EDH_request_remove_material.pdf" size="204809" user="akuonen" version="1"
META FILEATTACHMENT attachment="EDH_request_move_in_material.pdf" attr="" comment="" date="1464102748" name="EDH_request_move_in_material.pdf" path="EDH_request_move_in_material.pdf" size="208049" user="akuonen" version="1"
META FILEATTACHMENT attachment="Checklist_for_TB.xlsx" attr="" comment="" date="1465388364" name="Checklist_for_TB.xlsx" path="Checklist_for_TB.xlsx" size="8975" user="akuonen" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Nim_crate.pdf" attr="" comment="" date="1467961991" name="Nim_crate.pdf" path="Nim_crate.pdf" size="2628859" user="akuonen" version="1"

Revision 122016-06-08 - AxelKevinKuonen

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 80 to 80
  In both cases, if troubles happen when trying to passe CERN entrance, use the material transfert sheets in the car and pass by the material entrance from CERN.
Changed:
<
<
>
>
A check list for the material can be found here : * Checklist_for_TB.xlsx
  Links to Testbeam twiki pages for the SciFi telescope:
Line: 107 to 109
 
META FILEATTACHMENT attachment="x-talk-over_voltage.png" attr="h" comment="" date="1350390768" name="x-talk-over_voltage.png" path="x-talk-over_voltage.png" size="10800" user="rlindner" version="1"
META FILEATTACHMENT attachment="EDH_request_remove_material.pdf" attr="" comment="" date="1464102281" name="EDH_request_remove_material.pdf" path="EDH_request_remove_material.pdf" size="204809" user="akuonen" version="1"
META FILEATTACHMENT attachment="EDH_request_move_in_material.pdf" attr="" comment="" date="1464102748" name="EDH_request_move_in_material.pdf" path="EDH_request_move_in_material.pdf" size="208049" user="akuonen" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Checklist_for_TB.xlsx" attr="" comment="" date="1465388364" name="Checklist_for_TB.xlsx" path="Checklist_for_TB.xlsx" size="8975" user="akuonen" version="1"

Revision 112016-05-24 - AxelKevinKuonen

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 60 to 60
 

Testbeam:

Added:
>
>
The procedure to bring material into the North Area (H8A) by crane:
  • Pack all the material on a metalique pallet
  • 1-2 days before installation fill an EDH request for Internal Transport / Handling Request. An exemple of the document can be seen here. Material is moved from bldg887(EHN1) RC37 buffer zone to H8A. The document should include a picture of the material to transport.
  • !!! Put a copy of the EDH document on the pallet !!!
  • Contact person for the crane transport: M. Pierre Sorgues (164765).
  • Bring the pallet to the North Area, side RC-37 (buffer zone) and contact Pierre Sorgues (164765) for the crane transport. Specify you will need a transporteur to move the pallet out of the car.

The procedure to bring material back to EPFL from North Area (H8A):

  • Pack all the material on a metalique pallet
  • 1-2 days before installation fill an EDH request for Internal Transport / Handling Request. An exemple of the document can be seen here0. Material is moved from H8A to bldg887(EHN1) RC-37 buffer zone. The document should include a picture of the material to transport.
  • !!! Put a copy of the EDH document on the pallet !!!
  • The day of transport contact Pierre Sorgues (164765) for the crane transport. He will move the pallet into the buffer zone HC37 for radiation inspection. Specify you will need a transporteur after the radiation check.
  • Fill a TREC request on the computer inside the buffer zone RC-37. Follow the instruction, use H for the shipment adress (outside from Cern ...). Use the stickers for the bar code and stick them on the material
  • Call the radio protection department (number on the door, can be unavailable) or wait the radio protection control (can last one or two days).
  • Once the radiation check is done, you can take the material with you !

In both cases, if troubles happen when trying to passe CERN entrance, use the material transfert sheets in the car and pass by the material entrance from CERN.

 Links to Testbeam twiki pages for the SciFi telescope:

TestbeamNov2015

Line: 75 to 97
  -- GuidoHaefeli - 15 Jul 2014
Added:
>
>

 
META FILEATTACHMENT attachment="SiPM-cavern-cooled.png" attr="h" comment="" date="1350389705" name="SiPM-cavern-cooled.png" path="SiPM-cavern-cooled.png" size="30659" user="rlindner" version="1"
META FILEATTACHMENT attachment="x-talk-over_voltage.png" attr="h" comment="" date="1350390768" name="x-talk-over_voltage.png" path="x-talk-over_voltage.png" size="10800" user="rlindner" version="1"
Added:
>
>
META FILEATTACHMENT attachment="EDH_request_remove_material.pdf" attr="" comment="" date="1464102281" name="EDH_request_remove_material.pdf" path="EDH_request_remove_material.pdf" size="204809" user="akuonen" version="1"
META FILEATTACHMENT attachment="EDH_request_move_in_material.pdf" attr="" comment="" date="1464102748" name="EDH_request_move_in_material.pdf" path="EDH_request_move_in_material.pdf" size="208049" user="akuonen" version="1"

Revision 102016-05-13 - OlivierGoranGirard

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 60 to 60
 

Testbeam:

Added:
>
>
Links to Testbeam twiki pages for the SciFi telescope:
 TestbeamNov2015
Added:
>
>
TestbeamMay2016
 

Presentation given in LHCb meetings

Revision 92015-11-18 - AxelKevinKuonen

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Line: 57 to 57
 
  • Neutron irradiation facility for irradiation of 2*10^10 neq/cm^2
  • Mulitchannel bias voltage power supply CAEN (32channels, 10mA, 10mV adj, current monitoring)
  • Liquid based circulating chiller for cooling large modules down to -80C
Added:
>
>

Testbeam:

TestbeamNov2015

 

Presentation given in LHCb meetings

Revision 82014-07-16 - GuidoHaefeli

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Project Scope

Changed:
<
<
Development of an SiPM based multichannel array photon detector for the SciFi Tracker upgrade. The detector part includes also a flexible PCB and connectors together with a detector mounting structure that allows for a mechanical unit of typically 4 detector arrays.
>
>
Development of an SiPM based multichannel array photon detector for the SciFi Tracker upgrade. The detector part includes also a flexible PCB and connectors together with a detector mounting structure that allows for a mechanical unit of typically 4 detector arrays. Attached to this project is also the development of a light injection system that allows to calibrate the gain of the SiPMs in situ.
  Link the SciFi Tracker upgrade TDR: http://cds.cern.ch/record/1647400?ln=en
Changed:
<
<

Goals

>
>

Goals (SiPM)

  Automated measurement of the detectors for the most important characteristics:
  • Breakdown voltage, gain and gain uniformity (multichannel) measurement
Line: 15 to 15
 
  • LED light spectrum recording for super-module
  • Functional test (I-V) for series production acceptance test without soldering to flex
Possibility of measurement:
Changed:
<
<
  • Temeprature coefficient (T vs Gain) (single channel)
>
>
  • Temperature coefficient (T vs Gain) (single channel)
 
  • After-pulse (single channel)
Added:
>
>

Goals (Light injection system)

Development of a light injection system for gain calibration of the SiPM. The system needs to be sufficient uniform that the calibration by measuring the photon peaks (via threshold scan) is possible for all channels. Typical amount of light is 4 to 8 photons per pulse.

 

Projects

Optimization of the detectors for the requirements in the SciFi Tracker application includes:

Changed:
<
<
1. Silicon optimization:
>
>
A. Silicon optimisation
  a) PDE optimization - maximal PDE is the most important requirement, further developments of the two providers Hamamatsu and KETEK need to be driven into this direction, higher fill-factor (FF) (Hamamatsu), green shifted or flat spectral response (KETEK), pixel size optimisation

b) X-talk optimization - trenches between pixels can redue x-talk but decrease the FF, larger pixels have higher x-talk

Changed:
<
<

2. Silicon Packaging:

>
>
B. Silicon Packaging:
  a) Low dead area between detectors is required to keep an overall high hit detection efficiency, tolerances regarding thermal expansion have to be defined. Thermal cycling of package to qualify resistivity against thermal stress
Changed:
<
<

3. Flex and mounting:

>
>
C. Flex and mounting:
  a) Flex PCB needs to be optimized for low thermal conductivity and highest possible imunity for environmental electrical noise (RF) and good signal transmission between detector and FE ASIC.

b) Detector alignment and mounting to the Flex.

Changed:
<
<

4. Detector characterisation:

>
>
D. Detector characterisation:
  a) Automated tests for production testing

b) Irradiation studies on latest generation of prototypes and final devices

c) Characterisation of devices in the lab for in depth understaning of certain parameters and characteristics

Added:
>
>
E. Develpoment of light injection system:

a) Test the leaking fibres with nothches or scratch and evaluate different fiber routing options. Evaluate the amount of light required.

b) Electronics for light injection - evaluate rad-hard electronics mezzanine pluggable on the FE card with fast LED driver.

 

Lab Facilities:

EPFL

  • Automated test stand for non-soldered SiPM arrays for acceptance test
Changed:
<
<
  • Warm and cold (-60C) characterisation box for arrays and single channel detectors (VATA64, FEMTO single channel amplifier), Gain, PDE (rel.), I-V, X-talk, after-pulse
>
>
  • Warm and cold (-60C to +40C) characterisation box for arrays and single channel detectors (VATA64, FEMTO single channel amplifier), Gain, PDE (rel.), I-V, X-talk, after-pulse, automated threshold scan setup
 
  • Fiber module test stand with x-y table for laser, LED or e-gun injection tests
  • Neutron irradiation facility for irradiation of 2*10^10 neq/cm^2
  • Mulitchannel bias voltage power supply CAEN (32channels, 10mA, 10mV adj, current monitoring)
Added:
>
>
  • Liquid based circulating chiller for cooling large modules down to -80C
 

Presentation given in LHCb meetings

Revision 72014-07-15 - GuidoHaefeli

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"
Changed:
<
<

Specification of SiPM to be measured, before and after radiation

  • Photon detection efficiency (PDE) = QuantumEfficiency * Geometrical Factor
  • Dark count vs overvoltage
  • Crosstalk vs overvoltage
logo

Additional characterization

  • Cooling (reduction in dark counts, factor 2 for every 8-10° C ?)
  • Annealing, up to which temperature ?
logo
>
>

Project Scope

 
Added:
>
>
Development of an SiPM based multichannel array photon detector for the SciFi Tracker upgrade. The detector part includes also a flexible PCB and connectors together with a detector mounting structure that allows for a mechanical unit of typically 4 detector arrays.

Link the SciFi Tracker upgrade TDR: http://cds.cern.ch/record/1647400?ln=en

Goals

Automated measurement of the detectors for the most important characteristics:

  • Breakdown voltage, gain and gain uniformity (multichannel) measurement
  • DCR at room temperature and at -40C for irradiated detectors (multichannel)
  • X-talk measurement (multichannel)
  • PDE (single channel)
  • LED light spectrum recording for super-module
  • Functional test (I-V) for series production acceptance test without soldering to flex
Possibility of measurement:
  • Temeprature coefficient (T vs Gain) (single channel)
  • After-pulse (single channel)

Projects

Optimization of the detectors for the requirements in the SciFi Tracker application includes:

1. Silicon optimization:

a) PDE optimization - maximal PDE is the most important requirement, further developments of the two providers Hamamatsu and KETEK need to be driven into this direction, higher fill-factor (FF) (Hamamatsu), green shifted or flat spectral response (KETEK), pixel size optimisation

b) X-talk optimization - trenches between pixels can redue x-talk but decrease the FF, larger pixels have higher x-talk

2. Silicon Packaging:

a) Low dead area between detectors is required to keep an overall high hit detection efficiency, tolerances regarding thermal expansion have to be defined. Thermal cycling of package to qualify resistivity against thermal stress

3. Flex and mounting:

a) Flex PCB needs to be optimized for low thermal conductivity and highest possible imunity for environmental electrical noise (RF) and good signal transmission between detector and FE ASIC.

b) Detector alignment and mounting to the Flex.

4. Detector characterisation:

a) Automated tests for production testing

b) Irradiation studies on latest generation of prototypes and final devices

c) Characterisation of devices in the lab for in depth understaning of certain parameters and characteristics

Lab Facilities:

EPFL

  • Automated test stand for non-soldered SiPM arrays for acceptance test
  • Warm and cold (-60C) characterisation box for arrays and single channel detectors (VATA64, FEMTO single channel amplifier), Gain, PDE (rel.), I-V, X-talk, after-pulse
  • Fiber module test stand with x-y table for laser, LED or e-gun injection tests
  • Neutron irradiation facility for irradiation of 2*10^10 neq/cm^2
  • Mulitchannel bias voltage power supply CAEN (32channels, 10mA, 10mV adj, current monitoring)
 

Presentation given in LHCb meetings

Added:
>
>
 
Deleted:
<
<
 
Deleted:
<
<
 
Changed:
<
<
-- RolfLindner - 12-Oct-2012
>
>
-- GuidoHaefeli - 15 Jul 2014
 
META FILEATTACHMENT attachment="SiPM-cavern-cooled.png" attr="h" comment="" date="1350389705" name="SiPM-cavern-cooled.png" path="SiPM-cavern-cooled.png" size="30659" user="rlindner" version="1"
META FILEATTACHMENT attachment="x-talk-over_voltage.png" attr="h" comment="" date="1350390768" name="x-talk-over_voltage.png" path="x-talk-over_voltage.png" size="10800" user="rlindner" version="1"

Revision 62013-10-09 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Specification of SiPM to be measured, before and after radiation

Line: 23 to 23
 
META FILEATTACHMENT attachment="SiPM-cavern-cooled.png" attr="h" comment="" date="1350389705" name="SiPM-cavern-cooled.png" path="SiPM-cavern-cooled.png" size="30659" user="rlindner" version="1"
META FILEATTACHMENT attachment="x-talk-over_voltage.png" attr="h" comment="" date="1350390768" name="x-talk-over_voltage.png" path="x-talk-over_voltage.png" size="10800" user="rlindner" version="1"
Deleted:
<
<
META FILEATTACHMENT attachment="SiPM_cooling_specs_0.1.pdf" attr="" comment="SiPM cooling system design document (long write-up), draft in preparation" date="1360790343" name="SiPM_cooling_specs_0.1.pdf" path="SiPM_cooling_specs_0.1.pdf" size="1242700" user="gorbunov" version="1"

Revision 52013-02-13 - PetrGorbounov

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Specification of SiPM to be measured, before and after radiation

Line: 23 to 23
 
META FILEATTACHMENT attachment="SiPM-cavern-cooled.png" attr="h" comment="" date="1350389705" name="SiPM-cavern-cooled.png" path="SiPM-cavern-cooled.png" size="30659" user="rlindner" version="1"
META FILEATTACHMENT attachment="x-talk-over_voltage.png" attr="h" comment="" date="1350390768" name="x-talk-over_voltage.png" path="x-talk-over_voltage.png" size="10800" user="rlindner" version="1"
Added:
>
>
META FILEATTACHMENT attachment="SiPM_cooling_specs_0.1.pdf" attr="" comment="SiPM cooling system design document (long write-up), draft in preparation" date="1360790343" name="SiPM_cooling_specs_0.1.pdf" path="SiPM_cooling_specs_0.1.pdf" size="1242700" user="gorbunov" version="1"

Revision 42012-10-16 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"

Specification of SiPM to be measured, before and after radiation

Line: 8 to 8
 

Additional characterization

  • Cooling (reduction in dark counts, factor 2 for every 8-10° C ?)
Changed:
<
<
  • Annealing, up to which temperature
>
>
  • Annealing, up to which temperature ?
 logo

Presentation given in LHCb meetings

Revision 32012-10-16 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"
Changed:
<
<
Just started
>
>

Specification of SiPM to be measured, before and after radiation

  • Photon detection efficiency (PDE) = QuantumEfficiency * Geometrical Factor
  • Dark count vs overvoltage
  • Crosstalk vs overvoltage
logo

Additional characterization

  • Cooling (reduction in dark counts, factor 2 for every 8-10° C ?)
  • Annealing, up to which temperature
logo
 

Presentation given in LHCb meetings

Changed:
<
<
>
>
 

-- RolfLindner - 12-Oct-2012

Added:
>
>
META FILEATTACHMENT attachment="SiPM-cavern-cooled.png" attr="h" comment="" date="1350389705" name="SiPM-cavern-cooled.png" path="SiPM-cavern-cooled.png" size="30659" user="rlindner" version="1"
META FILEATTACHMENT attachment="x-talk-over_voltage.png" attr="h" comment="" date="1350390768" name="x-talk-over_voltage.png" path="x-talk-over_voltage.png" size="10800" user="rlindner" version="1"

Revision 22012-10-12 - RolfLindner

Line: 1 to 1
 
META TOPICPARENT name="UpgradeSciFiTracker"
Just started
Added:
>
>

Presentation given in LHCb meetings

 
Added:
>
>

  -- RolfLindner - 12-Oct-2012

Revision 12012-10-12 - RolfLindner

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="UpgradeSciFiTracker"
Just started

-- RolfLindner - 12-Oct-2012

 