Difference: T2DCriteria (1 vs. 2)

Revision 22014-01-20 - AndrewMcNab

Line: 1 to 1
 
META TOPICPARENT name="LHCbComputing"
Changed:
<
<
Placeholder for now.
>
>

Technical criteria for LHCb T2-D sites:

 
Deleted:
<
<
-- AndrewMcNab - 01 Dec 2013
 \ No newline at end of file
Added:
>
>
The criteria that T2-D sites agree to meet are set out in the LHCb internal note on T2-D sites, and are reproduced here:
  • At least 100TB of storage in the first instance, rising to at least 300TB by the end of the following year
  • Once accepted, the site will satisfy the WLCG Tier-2 MoU criteria for site availability and reliability. Currently, this is to achieve at least 95% availability averaged over the last year. These figures will be taken from the LHCb WLCG SAM tests. For new T2-D sites, the criteria will be achieved for the previous quarter.

  • The site will participate in LHCb perfSonar monitoring. At present we do not have the experience to set targets for bandwidth tests. These will be defined in a future iteration.

These metrics will be monitored via the LHCb SSB page

Revision 12013-12-01 - AndrewMcNab

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="LHCbComputing"
Placeholder for now.

-- AndrewMcNab - 01 Dec 2013

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback