Difference: 04102012HFEWithLEGOTrainForTriggerEventAnalysis (4 vs. 5)

Revision 52012-04-13 - Ssakai

Line: 1 to 1
 
META TOPICPARENT name="Analysis"

Outlook

  • EMCal trigger data (EMCEGA) with Lego train
Line: 12 to 12
 
  • both detector doesn't request Tender (not need)
  • required pT > 5 GeV/c
Added:
>
>
  • All Centrality
 Pic_NsigEop_All.png
Added:
>
>
  • Centrality 0-5 %
 Pic_NsigEop_Most.png

E/p distribution

Added:
>
>
  • Centrality 0-5 %
 
  • requested -1.5 > nSigma
  • below pT<10 GeV/c, the cut is fine
  • pT > 10 GeV/c, need more tighter cut to get pure electron sample
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback