AB Safety Unit
Meeting 27 11 2008:
Present: I.Brunner, C.Galmant, L.Bruno, D.Chapuis, J-L Duran-Lopez, J.Ridewood, D.Vaxelaire, S.Hutchins
tour de table:
LB: Editing the Isolde Safety file.
JR: SPS in free access mode, question to GR: location of key for BB5, + doors 2145 and 8266 will be kept shut.
J-LD:End of cooldown, access control by op team up to 15/12, then open access with CSA, no keys. Linac 2 source is locked out.
DC: Thomas Otto investigating CTF3 radiation shielding needs
SH: Status PGCSPS, presentation SU Wiki
Follow-ups updated.
--
SteveHutchins - 04 Dec 2008