Meeting 22 01 2009:

Present: Ghislain Roy; Isabel Brunner; Luca Bruno; ; Markus Widorski; Fabrice Chapuis; Jose-Luis Duran-Lopez; Roberto Bonzano; ; Idelette Floret; Steve Hutchins.

Excusés : ,

GR reorganisation

IF stockage RP? BF saFETY SPECIALISTS BEEAM

tour de table:

GR: ventilation BA80, procedure with beam permit , RP keeps ventilation key, OP soft interlock on air flow

LB: TAN concption weak, Atlas ok CMS next week

LB: NTOF ventilation, control of emmisions. RB to check interlocks

LB: source berylium needs recycling

IF: PS port materiel ? Procedure TSO : no guardien, CSA control? Jose to verify with R.Brown

IF: access 4

FC: Linac4/linac2 interlocks, LB: shielding calcule, 20cm extra found 40cm more needed. Interlock on source, IF to call meeting

GR: radioprtection courses not followed: will change rule, also prp11 escorted visitor procedure

GR: reorganisation BFSP, DSOs in sector, task force accesibility LHC

-- SteveHutchins - 22 Jan 2009

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r4 - 2009-01-29 - SteveHutchins
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    ABSafety All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback