Mon 16/Jan/06 18:00 GG ALARM after 1h of RUN. Liquid weight ~ 12 kg form initial 28 kg. Problem generated by low power in the dummies staves. After recovering system works.
19:30 GG RECOVERING.
Tue 17/Feb/06 8:30 GG Weight 26.9 kg.
12:00 GG Weight 27.6 kg.
16:00 GG Weight 27.8 kg. Parameter r13 of chiller (=minimum summer setpoint) reduced at 5°C.
17:30 GG Weight 27.8 kg. Parameter of the chiller for the defrost temperature changed: A2 from 2 to 1 and A1 from 4 to 3.5. No change: alarm A1 still after few second of cooling. STOP.
Wed 18/Feb/06 15:10 GG Weight 27.8 kg. RUN with line 9 and 10 opened.
15:15 GG Dummy staves ON.
15:30 GG Line 2 opened. Weight 20.5 kg.
16:23 GG Weight linear decrease: 17.1 kg.
17:07 GG Weight 14.6 kg. Stop dummy staves. RECOVERING.
Thu 19/Feb/06 10:33 GG Weight 27.8 kg. RUN.
10:55 GG Opened loop 2. Weight 19.9 kg. Dummy staves are detaching.
12:00 GG Weight 15.5 kg. Dummy staves OFF. RECOVERING.
Fri 20/Jan/06 9:30 GG Weight 27.7 kg. STOP.
10:00 GG RUN.
10:20 GG Weight 19.2 kg.
11:10 GG Power cut of the system: central switch was OFF! RECOVERING.
11:27 GG RUN.
11:42 GG Opened loop 2.
12:34 GG Closed loop 2. RECOVERING.
Mon 23/Jan/06 Morning GG Reglued dummy staves. Used ARALDIT RAPID.
Tue 24/Jan/06 9:45 GG RUN.
9:50 GG Dummy staves ON. Dummy staves detached where no ARALDIT had been deposed. Dummy staves at 10V->2.8A, system in RECOVERING. ARALDIT deposed "everywhere".
14:35 GG Weight 27 kg. RUN.
14:47 GG Dummy staves ON. Weight 20.7 kg.
15:38 GG Weight 20.4 kg stable for 20'. Opened loop 2. Weight 19.6 kg.
16:12 GG Weight 17.7 kg. Linearly decreasing.
16:48 GG Weight 15.7 kg. Linearly decreasing. ~ 4 kg/h.
18:14 GG Weight 12.5 kg. No more linear decrease.
19:07 GG RECOVERING.
Wed 25/Jan/06 15:10 GG STOP. Weight 27.2 kg. Chiller parameters modifications. b00 from 0 to 1 (display the temperature coming from the evaporator and not the goint to one); r06 from 0 to 1 (setpoint is the temperature coming form the evaporator); r02 from 1 to 5 (chiller ON between the temperature [setpoint, setpoint+r02], currently is [5, 10]. No more alarm A01.
Thu 26/Jan/06 15:55 GG Difference of ~ 1°C between the temperature of the water out of t chiller end the water entering in the condenser. Chiller from 10°C to 5°C in ~ 2'; from 5°C to 10°C in ~ 14' (cooling dependant).
18:20 GG Liquid pressure from 2.725 to 2.700 b.
18:41 GG Liquid stable at 12.2 kg since ~ 18:15
19:30 GG RECOVERING.
Tue 31/Jan/06 15:00 GG System found switched OFF, like 20/01/06. Switched ON.
15:04 GG RECOVERING. Weight 26.4 kg.
15:18 GG LEAK CONTROL started. See paper logbook for the values. Weight 26.6 kg.
15:48 GG All loops have high loss!
15:57 GG Second leak control.
16:30 GG All loops have high loss!
16:50 GG All channels locked and RECOVERING to see eventual variation.
17:20 GG Return pressure is 0.39 +/- 0.01 b in all channels.

Type ^ to repeat the date.

To February 2006


ID Name
GG Gianluca Guaglio

Logbook

Cooling System -- Main.gguaglio - 24 Apr 2006

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r4 - 2006-05-17 - unknown
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    AliceSPD All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback