Hi all,
Telecon tomorrow (Feb. 20 in North America, Feb. 21 in Australia) at the regular time: 5 pm Eastern (2 pm Pacific, noon Hawaii, 23.00 European, 9 am Eastern Australia). Two
parafoils are currently in the tailoring shop -- the one that we have been using is getting additional belt loops for a spar on its vent side (as mentioned in the minutes
from 2 weeks ago), and one of the two new ones is getting belt loops put all around it -- and the pick-up date from the tailor is next week on Feb. 26. Also, more testing
of the new Raveon
M8S data modems in the lab, new Hamamatsu and Thorlabs photodiodes are here in Victoria and ready to be tested, and progress on AIFCOMSS station-keeping
prediction/simulation software. More discussion items for tomorrow's telecon include: flight/telescope plans and tests; construction and lab tests of the new
gondolas/payloads; light sources and light source modelling; goniometric and pre- and post-flight calibration; propulsion work; nanosat bus and payload solid models;
computing / website / TWiki forums and e-mails; grant applications; and recap of schedules. I'll send a progress report before the telecon tomorrow.
Here's how to connect:
1) Open Skype on your computer (note that of course, you should first install Skype,
http://www.skype.com
, on your machine if you haven't already).
2) In the "Contacts" menu, add me ( jalbertuvic ) as a contact, if you haven't already.
3) Just wait for me to Skype-call you at the usual time (5 pm Eastern, 2 pm Pacific, etc).
4) If there is any trouble, or if you don't get a Skype-call for some reason and would like to join, please just send me an e-mail (
jalbert@uvicNOSPAMPLEASE.ca).
Here's the tentative agenda:
I) Flight & telescope plans, and upcoming tests
II) Construction, drop tests, and other tests of the new gondola and payload
III) Diffused light source and its modelling, pre- and post-flight calibration, and goniometric calibrations
IV) Solid modelling
V) Computing/website, including recent flight control and simulation progress
VI) Grant applications
VII) AOB
Talk to you all tomorrow, thanks!!!
justin
--
jalbert - 2020-02-20
Hi all,
Apologies for the delay! -- here are minutes of our last telecon on Jan. 23 (with attendees Arnold Gaertner [NRC] and me), a quick update on ALTAIR balloon work, and a
reminder of the telecon in a half-hour(!) from now:
As mentioned yesterday, we have 2 parafoils (the one that we have been using, plus an as-yet unused parafoil) currently at the Nahid Tailoring Services shop in Victoria to
get more "belt loops" for fiberglass spars put around their edges (on the side near the vents for the parafoil that we have been using, and on all four sides for the new
one). The pick-up date is this coming Wednesday (the 26th), and right after that we'll try more drop tests.
We've also been doing more connecting up and testing out of our two new 144 MHz Raveon
M8S data modem transceivers here in Victoria:
After successfully checking them out with Raveon's Windows-based Radio Manager software, I've started to connect the radios up to Arduino Megas -- in the next few weeks I'm
planning to get them talking to one another, and then I'll check out their effective ranges.
We also have our 10 Hamamatsu S12698-01 photodiodes and 3 Thorlabs FDS100-NOCAN photodiodes (those Thorlabs ones have their windows removed) here in Victoria:
I've given them to Evan (new engineering student) to try out -- he's taking a few weeks to ramp up, and will produce some linearity, etc., plots from them soon.
I'm also working with another undergraduate student on the actual station-keeping algorithm for AIFCOMSS. Presently the "station keeping" code in AIFCOMSS just turns on the
propellers in the simulation at full power, and propels the gondola in a single direction until the battery runs out (it's presently most certainly not actual "station
keeping"). I added some hooks for adding actual station keeping algorithms into the code, and we're developing the algorithms and will implement them.
The survey-tripod-mounted device to cross-check yaw-pitch-roll information from the gondola (e.g., on days before/after flights) is also constructed now, thanks to Mark
Lenckowski -- photo at:
and all that remains to be done is to finish the small fitting between the device and the bottom of the payload. The purchased hardware in it includes both the survey tripod
(
http://www.cpotools.com/cst-berger-60-alwi20-o-aluminum-tripod-with-quick-release--orange-/cstn60-alwi20-o,default,pd.html
), two adjustable angle mounts
(
http://www.thorlabs.com/thorproduct.cfm?partnumber=AP180
), and a rotation mount (
https://www.thorlabs.com/thorproduct.cfm?partnumber=RP01
). That last fitting to attach
(temporarily, pre- or post-flight) the upper adjustable angle mount to the payload landing gear has been started and will be completed here in the next couple weeks.
We're currently revising the draft initial contractual agreement from our colleagues at Globalstar Canada regarding 2 initial SPOT Trace devices (and their service plans)
for the educational side-project for the upcoming NATO SPS application, in which classrooms in elementary and high schools could launch company-donated SPOT Traces using
party balloons (or a more environmentally-friendly version thereof), and track them to learn more about winds at different levels in Earth's atmosphere.
Houman will send Cordell and/or us updated sections of his master's thesis soon -- that information will be extremely useful to us going forward. Also, Susana and Nathan, it
would be very helpful for us all to get the JHU students' final writeup when you have a chance.
Next grant application will be a NATO "Science for Peace and Security" application (together with Australian colleague partners).
Our next telecon is in a half-hour (!) from now (see below for Skype instructions).
Cheers, talk in 30 minutes(!) from now -- thanks all!
justin
--
jalbert - 2020-02-20