Approved Detector Control System (DCS) Figures
Introduction
The DCS commissioning and performance figures below are approved to be shown by ATLAS speakers at conferences and similar events.
Please do not add figures on your own. Contact the
DCS project leader in case of questions and/or suggestions.
Figures
Figure 1: Schema of DCS architecture. The detector hardware is interfaced to the DCS front-end systems (sensors, PLCs etc.). The data is processed by a hierarchical back-end system and presented to the control room operator using a single user interface. eps , jpg
|
|
Figure 2: Atlas DCS user interface at the morning of the 10th of September 2008. It shows an overview of the state of all detector components. Some of the sub-detectors are in the NOT_READY state as they require a stable beam condition to be switched on. png
|
|
Figure 3: Common Infrastructure Control within Atlas DCS for counting room USA15 Level1 at the morning of the 10th of September 2008, showing the state of all electronics racks and the environmental monitoring. png
|
|
Figure 4: Magnet monitoring interface in Atlas DCS. State of all Atlas magnets at the morning of the 10th of September 2008. The trend plot shows the current time evolution during the previous two days including the ramp up phase of the toroid magnet. png
|
|