Beam Line For Schools Run Shifter Instructions

This page is designed to help Run Control Shifter of the BL4S experiment. Please be sure that you read the general shift instructions in page BL4SShiftIntroduction.

The duties of the Run Control Shifter can be summarized as:

Changing Beam Parameters and Dumping the Beam

Checking Beam Status

Starting and Stopping a Run

Running event display

-- SaimeSarikaya - 12 Aug 2014

Edit | Attach | Watch | Print version | History: r14 | r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r2 - 2014-08-12 - SaimeSarikaya
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    BL4S All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback