Beam Line For Schools Run Shifter Instructions

This page is designed to help Run Control Shifter of the BL4S experiment. Please be sure that you read the general shift instructions in page BL4SShiftIntroduction.

The duties of the Run Control Shifter can be summarized as:

Checking Beam Status

Run Control shifter is responsible of checking the beam status and deciding on the to start and stop the new run according to it. There are two ways of checking the beam status.

From CPS Vistar Page

CPS stands for Cern Proton Synchrotron. You can observe the status of the CPS in all the experimental areas from CPS Vistar page. In big experiments like ATLAS and CMS, they are also using Vistar Pages to observe the status of the LHC Beam. Before staring and stopping a run and during your shift, check the monitor in the control room or the web page: http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=CPS. You can also directly navigate through the bookmarks from your browser toolbar for "CPS status"

cps.png

There is beam if the value near EASTA_ should be ~30, and you should see a image with rising and falling signals as seen in above image.

You can find the detailed information in page: https://espace.cern.ch/be-dep/OP/PS/Applications%20Documentation/CPS%20Vistar.aspx, if you would like to learn more.

From BL4S Vistar Page

For BL4S experiment, we have our own vistar page! You can navigate through your browser toolbar for "BL4S status".You will see a screen like:

vistar_bl4s.png

You can see the counts of the detectors, daily plan and ongoing runs from here. Observe sharp changes on the mean and sigma values. The units used here is "cm" for the mean values. The mean values sould be a a couple of cms and the counts should be on the order of the number of events read for regular runs. Discuss any big change with the shift leader.

Run Control (DAQ)

The main responsibility of the run controller shifter is to start and stop the run. During the run you should watch the Error Report Service (ERS). In BL4S experiment, we are using the same data acqusition software that is used in ATLAS experiment. Here "Run" is defined as the data taking session. Once you changed the configation or beam status then you should stop the current run and start a new one. The Shit Leader will help you about when to start and stop the run.

To open the BL4S DAQ Software, you can click on the icon on your desktop.

Starting DAQ

(TODO: BL4S Logo here!)

If you have troubles with openning the DAQ (Data Acqusition) software, you can ask shift leader for help. You will see a page like below:

BL4S_DAQ_openning.png

Lets have a look at what we can change and observe on the software:

  • At the bottom, you will see Error Report Service (ERS). If there is any warning or error at the beginning or while taking data, first check the BL4SWhiteBoard then if you could not any information on the whiteboard, discuss it with the shift leader.
  • In the middle and on the right, you will see informations about the run segments, apps etc... You should not change anything here.
  • On the left, you will see in order:
    • Run Control State (will be explained in below in starting a run part)
    • Run control command (will be explained in below in starting a run part)
    • Beam Stable (should always be green)
    • Run Informations and settings
First checkthe "Settings" tab in "Run Informations & Settings" part on the left. It looks like:

daq_settings.png

Here we have seetings:

  • Max Events : If you are taking data, it should be zero which means infinite.
  • Run Type: You should select a run type here. It can be either "Physics" or "Calibration"
  • Beam Type: You select the beam type.
  • Beam Energy: You should write the beam energy you are using here in units of GeV.
  • Tier0 Project Name : Do not change it.
  • File Name Tag: you should write a proper file name tag here depending on the type on the run. For example: lgcalibration, dwccalibUD, PionDecay, CalorimeterTest etc.
  • Recording: You should "Enable" it!
After you adjust the settings press "Set Values Button".

At ERS in the botton you will see an information as "Run settings have been correctly updated". If not, it means that you are making something wrong like using forbidden characters in tag or foget to select something.

Starting a Run

Now you are ready to take data. After you finish the settings properly told above you can start a run using the "Run Control Commands" section on the left top part. At first the Run Control State should be NONE and only initialalize button is enabled. Then you should follow the following steps by pressing the buttons:

  1. INITIALIZE : Run Control State will be INITIAL (from NONE)
  2. CONFIG : Run Control State will be CONNECTED. A pop up will appear saying "Remember to check the Run settings before starting the run". It is the last time you can change the run settings. So it is advised to check the run settings once here!
  3. START : Run Control State will be RUNNING.
BL4S_DAQ_running.png

All the segments in run Control and Root Controller should be green now. Now you have a new run! Congragulations!

Never forget to check ERS while starting the DAQ. If there is an ERROR or WARNING check the BL4SWhiteBoard and discuss with the shift leader.

daq_information.png

You can find run information on "Information" tab under "Run Information & Settings"

After you start a run make an e-log (with the run number at the subject) about the new run, containing information:

  • The start time.
  • The run number
  • The file_tag_name you selected
  • Run Type
  • The Trigger type: you should learn it from the Detector and DAQ shifter.
  • Beam Type/Status/Intensity : From vistar page
You can find an example new run log at the BL4S E-Log.

Counters and ERS during run

daq_counters.png

df_panel.png

Stopping a Run

Running event display

-- SaimeSarikaya - 12 Aug 2014

Topic attachments
I Attachment History Action Size Date Who Comment
PNGpng BL4S_DAQ.png r1 manage 68.4 K 2014-08-20 - 14:07 SaimeSarikaya  
PNGpng BL4S_DAQ_openning.png r1 manage 68.4 K 2014-08-20 - 14:09 SaimeSarikaya  
PNGpng BL4S_DAQ_running.png r1 manage 65.1 K 2014-08-20 - 13:58 SaimeSarikaya  
PNGpng cps.png r1 manage 11.4 K 2014-08-18 - 17:26 SaimeSarikaya cps vistar
PNGpng daq_counters.png r1 manage 2.9 K 2014-08-20 - 13:58 SaimeSarikaya  
PNGpng daq_information.png r1 manage 4.0 K 2014-08-20 - 13:58 SaimeSarikaya  
PNGpng daq_settings.png r1 manage 4.8 K 2014-08-20 - 13:58 SaimeSarikaya  
PNGpng df_panel.png r1 manage 65.3 K 2014-08-20 - 13:58 SaimeSarikaya  
PNGpng vistar_bl4s.png r1 manage 172.5 K 2014-08-18 - 18:11 SaimeSarikaya bl4s vistar page
Edit | Attach | Watch | Print version | History: r14 | r6 < r5 < r4 < r3 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r4 - 2014-08-20 - SaimeSarikaya
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    BL4S All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback