To access the T9 zone when beam is on:

  • Unchecked checkbox Stop data acquisition
  • Unchecked checkbox Power down MNP17 magnet (from control room on the first floor)
  • Unchecked checkbox Put beam stopper in
  • Unchecked checkbox Switch T9 door to "free access" or "key access"
  • Unchecked checkbox One CERN member goes to T9 and check the magnetic fields
  • Unchecked checkbox If T9 is safe students may enter

Shut down at the end of the day

  • Unchecked checkbox Stop data acquisition
  • Unchecked checkbox Power down MNP17 magnet (from control room on the first floor)
  • Unchecked checkbox Powerdown high voltage module
  • Unchecked checkbox Put beam stopper in
  • Unchecked checkbox Call CCC to stop beam

-- TimBrooks - 2015-08-20

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2015-08-24 - MarkusJoos
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    BL4S All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback