Minutes BWS Upgrade: Electro-Mechanical Design Meeting #6 -- 10th October 2015 --

Participants: Raymond Veness, Bernd Dehning, William Andreazza, Jonathan Emery, Aleksander Cudny, Emiliano Piselli

Agenda ( http://indico.cern.ch/event/448877/)

PDF Version Here

1. BWS PSB Motor: News (D.Gudkov)

  • Showed new motor system assembly
    • Step chamber proposal: Adapt break to diameter of motor.
    • Discussion about the possibility of suppresion of one of the diameters of the stepped chamber (1 long section instead of 2 short with different diametres).
  • Changes introduced:
    • External focusing system with optical viewport
    • Flange changed from DN250 to DN273 (mm)
    • Feedthrough at the motor side introduced
  • Question from William:
    • Value of the absolute alignment accuracy of the tank?
      • Agreement on 300um (Bernd)
  • Remark from Jonathan:
    • Electrical characteristics of the new motors need to be verified (Kt & Ke value)

2. First SPS Measurements: Planning (J.Emery)

  • All the equipment in the tunnel is installed
  • Acquisition system under test
  • New wire scanner installation on first week of November, Week 45.

3. Optical Position Sensor: Test with the new disk samples (J.L. Sirvent)

  • New disk diameter 185 mm (Before it was 135 mm)
  • Materials: Titanium & Anticorodal
  • Materials reflectivities are similar to glass enconder systems.
  • Surface roughness must be improved to have suitable signals.
  • Extintion ratio is similar to the glass disks.
  • Disadvantadges of metal disk:
    • Larger inertia (is is under question. Inertia of steel disk 3e-4, aluminium disk 1e-4, glass disk 2e-4 x m2)
    • Probably higher manufacturing costs.
  • Advantadges of metal disk:
    • Higher temperature limit, baking.
    • Conductive
    • Less fragile

4. AOB (B.Dehning)

  • Presentation of sketch of the wire mounting on fork.
  • Kick Off considerations for the design of the mounting elements.

5. New Actions

Responsible Action
Bernd Accuracy needed for absolute positioning
Dmitri Check feedthrough maximal extension, limit for PSB.
Make break rotate-able by xxx degree
Come up with the range of angular movement for the break
William Check that disks could be exchanged in YETS 2015/16 SPS, waiting for Christoph
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2015-11-13 - unknown
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    BWSUpgrade All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback