Meetings

Electro-Mechanical meetings

DATE MEETING NAME AGENDA AND PRESENTATIONS MINUTES COMMENTS
2019_06_18 BWS Project Meeting #39 https://indico.cern.ch/event/825904/    
2019_04_15 BWS Project Meeting #38 https://indico.cern.ch/event/810636/   Status Update (Mechanics, Electronics, Firmware and Calibration)
2019_03_25 BWS Project Meeting #37 https://indico.cern.ch/event/807732/   Mechanics and electronics update, First production calibration results, Software Implementation...
2019_02_04 BWS Project Meeting #36 https://indico.cern.ch/event/788708/    
2018_09_05 BWS Project Meeting #35 https://indico.cern.ch/event/754685/   Empty
2018_08_22 BWS Project Meeting #34 https://indico.cern.ch/event/751531/   Project update during holiday August 2018
2018_07_24 BWS Project Meeting #33 https://indico.cern.ch/event/739411/   Metallic disk engravement process improvements. Preparation for LIU-PS meeting on August. Update on production status.
2018_06_21 BWS Project Meeting #32 https://indico.cern.ch/event/736787/   Preliminary test results with PS LIU-BWS 2. Metallic disk test. Activities during TS1.
2018_06_12 BWS Project Meeting #31 https://indico.cern.ch/event/736095/ Meeting_Minutes Mechanics and Electronics status and readyness for September Tests. Preliminary test results with PS LIU-BWS.
2018_05_28 BWS Project Meeting #30 https://indico.cern.ch/event/732314/   CNT Wire studies and Dspace Status
2018_05_14 BWS Project Meeting #29 https://indico.cern.ch/event/729280/ Meeting_Minutes Mechanics production, Electronics readiness, Metallic disk series production.
2018_04_17 BWS Project Meeting #28 https://indico.cern.ch/event/719551/    
2018_21_03 BWS Project Meeting #27 https://indico.cern.ch/event/715138/   Discussions and updates
2018_02_26 BWS Project Meeting #26 https://indico.cern.ch/event/709052/   First Calibrations with Metallic Disk, Metallic disk production, Measurement plans, Series production status.
2018_02_05 BWS Project Meeting #25 https://indico.cern.ch/event/702482/   PS Prototype installation (Mechanics, control, acquisition), Test plans for 2018, Series production status.
2017_11_17 BWS Project Meeting #24 https://indico.cern.ch/event/681185/   LIU Review Preparation, PS prototype readiness and series production.
2017_10_17 BWS Project Meeting #23 https://indico.cern.ch/event/674041/   Preliminary results of MD with BWS on PSB with modified disk holder, metal disk tests and disk drifting calculations.
2017_09_22 BWS Project Meeting #22 https://indico.cern.ch/event/667872/   Reports on 24H TS and Scanner substitution and calibration
2017_09_05 BWS Project Meeting #21 https://indico.cern.ch/event/663752    
2017_06_09 BWS Project Meeting #20 https://indico.cern.ch/event/645583/    
2017_05_12 BWS Project Meeting #19 https://indico.cern.ch/event/637417/    
2017_02_09 BWS Project Meeting #18 https://indico.cern.ch/event/610852/    
2016_11_28 BWS Project Meeting #17 https://indico.cern.ch/event/569142/ Meeting_Minutes Analysis of situation and stopping factors for PSB prototype installation in EYETS16
2016_11_07 BWS Project Meeting #16 https://indico.cern.ch/event/569141/    
2016_10_10 BWS Project Meeting #15 https://indico.cern.ch/event/569140/ Meeting_Minutes Updates on PSB prototypes Progress: Mechanical and Acquisition system. Plans for series production.
2016_09_19 BWS Project Meeting #14 https://indico.cern.ch/event/569130/ Meeting_Minutes Causes of the SPS BWS Incident, Intervention and situation. Mechanics, electronics and acquisition status for PSB.
2016_09_05 BWS Project Meeting #13 https://indico.cern.ch/event/564581/   Update from the different parts for PSB BWS Installation and schedule.
2016_07_14 BWS Project Meeting #12 https://indico.cern.ch/event/543918/ Meeting_Mintues Alxion standard and special motor testing results, PSB secondaries acquisition architecture proposal and Dundee Visit.
2016_06_06 BWS Project Meeting #11 https://indico.cern.ch/event/536424   Metallic disks test results, optical disk production methods review and status.
2016_04_21 BWS Project Meeting #10 https://indico.cern.ch/event/522821 Meeting_Minutes Update of the mechanical status and general discussions about integration.
2016_03_17 LIU Fast Wire Scanner Meeting https://indico.cern.ch/event/508884   General Status and planning schedule for 2016-2017 for the different mechanics & electronics
2015_12_14 BWS Project Meeting #9 https://indico.cern.ch/event/470556   Motor update, Vibrations/Interferometry observed on SPS BWS position sensor.
2015_11_26 BWS Project Meeting #8 https://indico.cern.ch/event/461487 Meeting_Minutes Motor procurement, Planing of motor test, PSB lenses for encoder validation.
2015_11_06 BWS Project Meeting #7 http://indico.cern.ch/event/460286 Meeting_Minutes Meetings with Vacuum & RF Groups. Design status. Kollmorgen Motor Test-Bench production. Torsion simulations on shaft.
2015_10_08 BWS Project Meeting #6 http://indico.cern.ch/event/448877 Meeting_Minutes Design Upgrade for PSB flat flange, SPS prototype measurements schedule, Optical tests with new disk materials
2015_09_04 BWS Project Meeting #5 http://indico.cern.ch/event/441464 Meeting_Minutes New mechanics for PSB BWS prototype presented (Option 2). Compact, flat flange, less weight, and easier to built.
2015_08_27 BWS Project Meeting #4.1 Focuser_Adjustments.pdf Meeting_Minutes Informal discussions about the PSB optical system design.
2015_08_21 BWS Project Meeting #4 http://indico.cern.ch/event/440052 Meeting_Minutes First results of aging tests, Update of controller development, RF measurement planning and PSB integration update
2015_08_07 BWS Project Meeting #3 http://indico.cern.ch/event/436415 Meeting_Minutes Motor selection, RF measurements requirements.
2015_07_24 BWS Project Meeting #2 http://indico.cern.ch/event/435233 Meeting_Minutes Approved the purchase of 2 Off-the-Shelf + 2 Custom motors for testing (Axion 14S5TK2M & Kollmorgen KBM-35x02)
2015_06_25 BWS Project Meeting #1 http://indico.cern.ch/event/404602 Meeting_Minutes Kick-Off Meeting

Electronics Meetings

DATE MEETING NAME AGENDA AND PRESENTATIONS MINUTES COMMENTS
2018_08_31 Ad-hoc BI-TB for choice of FMC ADC modules https://indico.cern.ch/event/751690/   Selection of ADC FMC Mezzanines for VFC compatible for different BI Projects
2016_05_19 BWS Upgrade: Control Electronics Meeting https://indico.cern.ch/event/531955   Controller hardware choice, inverter for the intelligent drive V2 and actuator tests
2017_10_31 BWS Upgrade: Acquisition Electronics Meeting https://indico.cern.ch/event/678184/   Acquisition electronics strategy.

Design Reviews

DATE MEETING NAME AGENDA AND PRESENTATIONS MINUTES COMMENTS
2013_04_18 Review of the CERN Fast Wire Scanners https://indico.cern.ch/event/229959   Review of the SPS design
2016_01_19 Review of the PSB Beam Wire Scanner Prototype Design https://indico.cern.ch/event/483648/ Meeting_Minutes Mechanical review of the PSB design before launching drawings approval and production.
2017_03_29 LIU BWS Mechanics Production Readiness Review https://indico.cern.ch/event/618262/ Meeting_Minutes  
2017_04_04 LIU BWS Review Follow-Up

https://indico.cern.ch/event/628624/

https://indico.cern.ch/event/573340/

Meeting_Mintues Calibration Results analysis for BWS prototype installed on PSB
2017_11_23 Review LIU/BI for beam size https://indico.cern.ch/event/646307/    

BI Day Talks

DATESorted ascending MEETING NAME AGENDA AND PRESENTATIONS
2011_11_24 BI-Day 2011 (Recent mechanical upgrades to the PS Wire Scanners. W.Andreazza) https://indico.cern.ch/event/113131/contributions/54847/
2012_12_06 BI-Day 2012 (The new Fast Wire Scanner prototype for the SPS. J.Emery) https://indico.cern.ch/event/211854/contributions/424669/
2014_10_16 BI-Day 2014 (Secondary Shower acquisition system for wirescanners using diamond detectors. J.L. Sirvent) https://indico.cern.ch/event/336612/contributions/1730869/
2016_03_10 BI-Day 2016 (The calibration and operation of CERN wirescanners. E.Piselli) https://indico.cern.ch/event/489382/contributions/1167009/
2016_03_10 BI-Day 2016 (A new Fast Wirescanner design for the PSB. D.Gudkov) https://indico.cern.ch/event/489382/contributions/1167014/
2017_06_29 BI-Day 2017 (Power and control electronics for tne new fast wirescanners. P.Andersson) https://indico.cern.ch/event/641870/contributions/2619321/
2018_12_04 BI-Day 2018 (Performance of the new injector wire scanners. J.L.Sirvent) https://indico.cern.ch/event/764999/contributions/3179120/

Other Meetings about BWS

DATE MEETING NAME AGENDA AND PRESENTATIONS
2019_07_11 LIU-PS WG (PS LIU-BWS Comissioning Vol4 - LHCINDIV) https://indico.cern.ch/event/833548/
2019_06_28 BE Seminar (New Fast Wire-Scanners for Beam Size Measurements in the LHC Injectors) https://indico.cern.ch/event/830394/
2019_05_16 LIU-PSB WG (PS LIU-BWS Comissioning Vol3) https://indico.cern.ch/event/819656/
2019_03_29 BI Seminar (Beam Secondary Shower Acquisition Design for the CERN High Accuracy Wire Scanner) https://indico.cern.ch/event/805354/
2019_02_08 LIU-PSB WG (PS LIU-BWS Comissioning Vol2) https://indico.cern.ch/event/792789/
2018_10_23 LIU-PSB WG (PS LIU-BWS Comissioning Vol1) https://indico.cern.ch/event/758303/
2018_08_31 Ad-Hoc BI-TB for choice of FMC ADC modules https://indico.cern.ch/event/751690/
2018_08_07 LIU-PS Meeting 159 https://indico.cern.ch/event/748505/
2018_04_20 MSWG Meeting 2018 #4 Prototype WS, SPS stripped ion cycle request and aperture https://indico.cern.ch/event/721906/
2018_01_26 BI/TB on LIU BWS electronics and optical fibre for BTV https://indico.cern.ch/event/684664/
2017_09_14 BI/TB on uTCA, LIU wire-scanners results and AWAKE status https://indico.cern.ch/event/659372/
2017_04_12 A Generic and Modular Protocol Scheme for Inter-FPGA Communication using Serial Links https://indico.cern.ch/event/629724/
2016_06_29 BI/TB on inter-FPGA communication https://indico.cern.ch/event/542750/
2015_07_02 BI/TB on PS WCM and electronics for the SPS BWS prototype https://indico.cern.ch/event/405743
2015_04_05 BI/TB on LHC BWS, new BTV electronics and follow-up from previous meetings https://indico.cern.ch/event/375626
2014_11_06 BI/TB on ELENA an Wire-scanneer Impedance https://indico.cern.ch/event/346465
2014_07_10 BI/TB on Fast Optical Links https://indico.cern.ch/event/328402
2014_01_23 BE/BI Technical board on LHC BSRT and Wire-Scanner https://indico.cern.ch/event/290139
Edit | Attach | Watch | Print version | History: r86 < r85 < r84 < r83 < r82 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r86 - 2019-07-12 - FedericoRoncarolo
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    BWSUpgrade All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback