Details

Date 1/03/2021
Location University of Bristol lab
People David Cussans, Stoyan Trilov

Test objective

Verify the operation of the timing firmware at 62.5 MHz, https://gitlab.cern.ch/protoDUNE-SP-DAQ/timing-board-firmware/-/tags/relval%2Fv5.3.0%2Fb2. This test is broken down into several stages, where each stage tests different hardware configurations. The test setup and results for each stage are outlined below.

-- DavidCussans - 2021-03-01

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2021-03-01 - DavidCussans
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    CENF All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback