AAA Federation Metrics

Introduction

This twiki page explains details of the AAA federation metrics which are used by Transfer Team. You should keep in mind that we don't give information about AAA project, but we give technical details about only these metrics.

Conditions

For these two metrics, we have the same conditions.
  • AAA-related ticket open for longer than two weeks
  • SAM access test < 50% for two weeks
  • HammerCloud test success rate < 80% for two weeks
It is enough to be marked as a bad site if one of these conditions is True for a site.

Dataflow

Quick Access

Content Path, link, machine name, etc. Notes
Developer cms-comp-ops-site-support-team[at]cern.ch SST will be responsible for run of the scripts
Scripts github  
Machine vocms077 SST is responsible for this machine
Output Path /afs/cern.ch/user/c/cmst1/www/SST/ {aaaTrans.txt, aaaProd.txt} outputs generated by the scripts are placed here
Metrics AAA Transitional Federation, AAA Production Federation  

-- AliMehmetAltundag - 2015-12-15

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2015-12-15 - AliMehmetAltundag
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    CMSPublic All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback