Muon DPG (DT/CSC/RPC/GEM) Approved Results
Muon DPG Publications
Approval steps
1) Approval within the subsystem. Contact the related DPG cordinator.
2) General Muon Meeting. Please contact Roumyana Hadjiiska for a presentation slot.
3) If CMS data are involved, the results have to be approved by CMS run coordination meeting (Andrea Massironi). This step also requires approval at the following WGM. A summary of CMS RC approvals and DPS notes is available on this
page.
Muon DPG Approved Results
11.07.2018
DT DPG Approved Results
The full up-to-date list can be found
here
CSC DPG Approved Results
Please see the
CSC DPG Public twiki page
RPC DPG Approved Results
All plots are stored at this
link
GEM DPG Approved results
Please see the
GEM DPG Public twiki page
MUON TDR Approved Results
Please see the
https://twiki.cern.ch/twiki/bin/viewauth/CMS/MuonPhase2TDR
All plots are stored at this
link
Muon Alignment Approved Results
Twiki page Preliminary results on the performance of track-based muon alignment in 2017. Approved October 21, 2017.
Twiki page Preliminary results on the performance of track-based muon alignment in 2018.
Publications
- CMS-CFT-09-017: CMS Muon Hardware Alignment (with CRAFT2008 data)
- CMS-CFT-09-016 note: CMS Muon Track-based Alignment (with CRAFT2008 data)
Approved Plots
Plot |
Caption |
|
CMS Muon System Resolution with Split Cosmics Cosmics traversing CMS from top to bottom are split in upper and lower leg, and each leg is reconstructed independently. The Gaussian width of the distribution: is plotted as a function of as measured by the tracker only reconstruction. Approval slides (the plot is on page 12) from 24 June 2011 by Mario Pelliccioni |
Set of Performance Plots for the CMS Muon Alignment (
link to slides
) with 2012 Data was approved on October 18, 2013
Plots approval Meeting
.
RPC R&D Approved Results
See
https://twiki.cern.ch/twiki/bin/view/CMSPublic/RPCRandDPlots
Responsible:
MarioPelliccioni,
YuriyPakhotin