Muon DPG (DT/CSC/RPC/GEM) Approved Results
Muon DPG Publications
Approval steps
1) Approval within the subsystem. Contact the related DPG cordinator.
2) General Muon Meeting. Please contact Carlo Battilana for a presentation slot.
3) If CMS data are involved, the results have to be approved by CMS run coordination meeting (Lucia Silvestris). This step also requires approval at the following WGM.
Muon DPG Approved Results
11.07.2018
DT DPG Approved Results
Please look into the following pages to see all plots. In case you need help, contact DT DPG.
Links to approved material
Twiki page DT longevitiy studies performed on chambers irradiated at the GIF++ between October 2017 and January 2019. Approved February 18, 2018
Twiki page Performance of the CMS Muon Detectors in early 2018 collision runs (along with the other muon subdetectors). Approved June 22, 2018
Twiki page Efficiency of the CMS Drift Tubes at LHC in 2017. Approved May 17, 2018
Twiki page Preliminary results on the performance of CMS Drift Tubes in 2017. Approved October 19, 2017
Twiki page Performance of the CMS Barrel Muon Trigger Primitives in late 2016 pp collision runs. Approved November 24, 2016
Twiki page 2016 performance for ICHEP (along with the other mu subdetectors). Approved July 29, 2016
Twiki page Early 2016 performance for LHCP (along with the other mu subdetectors). Approved June 09, 2016
Twiki page DT hit efficiency in 2015. Approved November 25, 2015
Twiki page DT hit resolution in 2015. Approved November 25, 2015
Twiki page DT timing performance in 2015. Approved November 25, 2015
Twiki page DT Local Trigger Performance in 2015. Approved November 25, 2015
Twiki page Performance of the Mean-Timer algorithm for DT Local Reconstruction and muon time measurement. Approved June 20, 2014 (results on simulation) + July 10, 2015 (results on 2012 data)
Twiki page Measurement of hit position resolution in the DT chambers using 2012 data. Approved March 4, 2014
Twiki page Measurement of currents drawn by DT chambers as a function of LHC instantaneous luminosity . Approved March 4, 2014
Twiki page Collision induced background in the DT chambers. Approved October 24, 2013
Twiki page Local trigger performance with 25ns BX. Approved May 8, 2013
Slides
approved on June 2012
Slides
approved for 2011 data
Slides
approved for 2010 data
CSC DPG Approved Results
Please see the
CSC DPG Public twiki page
RPC DPG Approved Results
All plots are stored at this
link
GEM DPG Approved results
Please see the
GEM DPG Public twiki page
MUON TDR Approved Results
Please see the
https://twiki.cern.ch/twiki/bin/viewauth/CMS/MuonPhase2TDR
All plots are stored at this
link
Muon Alignment Approved Results
Twiki page Preliminary results on the performance of track-based muon alignment in 2017. Approved October 21, 2017.
Twiki page Preliminary results on the performance of track-based muon alignment in 2018.
Publications
- CMS-CFT-09-017: CMS Muon Hardware Alignment (with CRAFT2008 data)
- CMS-CFT-09-016 note: CMS Muon Track-based Alignment (with CRAFT2008 data)
Approved Plots
Plot |
Caption |
|
CMS Muon System Resolution with Split Cosmics Cosmics traversing CMS from top to bottom are split in upper and lower leg, and each leg is reconstructed independently. The Gaussian width of the distribution: is plotted as a function of as measured by the tracker only reconstruction. Approval slides (the plot is on page 12) from 24 June 2011 by Mario Pelliccioni |
Set of Performance Plots for the CMS Muon Alignment (
link to slides
) with 2012 Data was approved on October 18, 2013
Plots approval Meeting
.
RPC R&D Approved Results
See
https://twiki.cern.ch/twiki/bin/view/CMSPublic/RPCRandDPlots
Responsible:
MarioPelliccioni,
YuriyPakhotin