L1 Trigger Offline Software Validation Table

The list of L1 Trigger offline packages and the list of persons responsible for these packages can be found in the wiki page L1 Trigger Offline Software: Developers and Packages.

The subsystem name is linked to the subsystem page containing the description of the validation.
CLICK on the corresponding symbol for each subsystem to see the subsystem detailed results.

Related wiki pages:

Legend:
  • No : Validation done, result is "Not Validated". Report the reasons below
  • Yes / Done : Validation done, result is "Ok, Validated"
  • Work in progress, under construction : Vaidation still in progress or results need to be followed up before final green/red light
  • Minus : Validation not (yet) done

Release 31X

Release Group
3_1_1 Yes / Done Yes / Done Minus Yes / Done Minus Minus Minus Minus Minus Minus Yes / Done Minus Minus Work in progress, under construction
ECAL_TPG HCAL_TPG RCT GCT CSC_TPG CSC_TF DT_TPG DT_TF RPC_Trigger GMT GT L1Extra BSC_TT RPC_TT

311 details

  • None

Release 32X

Release Group
3_2_6 Yes / Done Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Work in progress, under construction
ECAL_TPG HCAL_TPG RCT GCT CSC_TPG CSC_TF DT_TPG DT_TF RPC_Trigger GMT GT L1Extra BSC_TT RPC_TT
3_2_0 Yes / Done Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Work in progress, under construction
3_2_1 Yes / Done Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Work in progress, under construction
3_2_2 Yes / Done Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Work in progress, under construction
3_2_3 Yes / Done Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Work in progress, under construction
3_2_4 Yes / Done Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Work in progress, under construction
3_2_5 Yes / Done Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Minus Work in progress, under construction

-

326 details

  • None

Release 33X

Release Group
3_3_0 Yes / Done Yes / Done Minus Minus Yes / Done Minus Minus Minus Minus Minus Minus Minus Minus Work in progress, under construction
ECAL_TPG HCAL_TPG RCT GCT CSC_TPG CSC_TF DT_TPG DT_TF RPC_Trigger GMT GT L1Extra BSC_TT RPC_TT

Release 35X

Release Group
3_5_0_pre5 Yes / Done Minus Minus Minus Minus Minus Yes / Done Minus No No No No Minus Minus
ECAL_TPG HCAL_TPG RCT GCT CSC_TPG CSC_TF DT_TPG DT_TF RPC_Trigger GMT GT L1Extra BSC_TT RPC_TT

3_5_0_pre5 details

  • Drop in muon efficiency in the barrel part: a ~10% observed by HLT validation.
    The problems are related to RPC trigger in conjunction with the merging of regional candidates in GMT. The introduction/addition of the cosmic patterns for RPC trigger (in addition to non-cosmic patterns) affected the GMT muons, due to an optimization of rate in GMT when merging the regional muons. The solution proposed by Ivan is to update one of the GMT records from the global tag, controlling the merging, which involves new global tags for 35X. More evolved changes in merging could be eventually envisaged, but the proposed solution should fix now the drop in efficiency. Werner produced already the DB tags for the corresponding record and asked Gianluca for new global tags. RelVals will be produced to test the fix. RPC PACT, GMT, GT and L1Extra are marked as bad.

Edit | Attach | Watch | Print version | History: r13 < r12 < r11 < r10 < r9 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r13 - 2010-02-10 - EmiliaBecheva
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    CMSPublic All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback