Summary table

Readout

Progress codes:

  1. Processing, transparentUnchecked checkboxUnchecked checkboxUnchecked checkboxUnchecked checkbox Subdetector PC not available
  2. Yes / DoneProcessing, transparentUnchecked checkboxUnchecked checkboxUnchecked checkbox Subdetector PC registered and connected to CERN network
  3. Yes / DoneYes / DoneProcessing, transparentUnchecked checkboxUnchecked checkbox Central DAQ software installed in the subdetector PC
  4. Yes / DoneYes / DoneYes / DoneProcessing, transparentUnchecked checkbox Subdetector data format decoding/interpreting engine working
  5. Yes / DoneYes / DoneYes / DoneYes / DoneProcessing, transparent Subdetector data being delivered to and received by the server
  6. Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done Plotting engine working

Name Description Contact Priority Progress Comments Link to Zabbix Jasper is happy graph comment
PTR-MS Proton Transfer Reaction Axel   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done Waiting for instrument to be on    
O3 Ozone analyzer Jonathan   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
SO2 SO2 analyzer Robert Jonathan   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
SO2o Old SO2 analyser Jonathan Low Yes / DoneYes / DoneYes / DoneProcessing, transparentUnchecked checkbox read out with labjack Static Live  
DewPt Dew point sensors Georgios   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done Missing RH Static Live  
CPCb CPC battery Francesco   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
CPCx Expansion CPC Daniela   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done Not on...    
NAIS Air Ion Spectrometer Alessandro   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
APITOF Time Of Flight Mass Spectrometer Sigi   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done Tunning the plots Static Live  
PSM Particle Size Magnifier Alessandro   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
CIMS Mass Spectrometer Linda Sebastian   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
SMPS Scanning Mobility Particle Sizer Francesco   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
Gerdien Gerdien Alessandro   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done    
UVsens UV light sensor Paulo   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done      
PT100 Thermometers Michael Hi Yes / DoneYes / DoneYes / DoneYes / DoneProcessing, transparent Missing new probes Static Live Panel  
HV Fieldcage High-Voltage Jonathan   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
Gas Gas system Stefan   Yes / DoneYes / DoneYes / DoneYes / DoneProcessing, transparent On going    
Fan Mixing fans Jonathan   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done      
UV lamp Hamamatsu Jasper   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
Thermal Thermal control Antti jonathan   Yes / DoneYes / DoneYes / DoneYes / DoneProcessing, transparent Read width labjack    
T11 CERN PS/T11 beam Paulo   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
GCR Galactic Cosmic Ray monitor Vladimir Jonathan   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done   Static Live  
Hodo Beam hodoscope Vladimir Jonathan   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done replaced by scalers  
CPCw Water CPC Francesco/Agnezca   Yes / DoneProcessing, transparentUnchecked checkboxUnchecked checkboxUnchecked checkbox On hold; to be integrated with CPCb    

Control

Progress codes:

  1. Processing, transparentUnchecked checkboxUnchecked checkboxUnchecked checkboxUnchecked checkbox Component PC not available
  2. Yes / DoneProcessing, transparentUnchecked checkboxUnchecked checkboxUnchecked checkbox Component PC registered and connected to CERN network
  3. Yes / DoneYes / DoneProcessing, transparentUnchecked checkboxUnchecked checkbox Remote software installed
  4. Yes / DoneYes / DoneYes / DoneProcessing, transparentUnchecked checkbox Remote access available
  5. Yes / DoneYes / DoneYes / DoneYes / DoneProcessing, transparent Procedures available from experts
  6. Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done Control procedures documented

Name Description Contact Priority Progress Comments Link to control and documentation Jasper is happy graph comment
HV Fieldcage High-Voltage Jonathan   Yes / DoneYes / DoneYes / DoneYes / DoneProcessing, transparent Panel HvControl Joao
Gas Gas system Stefan Haider   Processing, transparentUnchecked checkboxUnchecked checkboxUnchecked checkboxUnchecked checkbox Controlled locally in 2009 GasControl  
Fan Mixing fans Joao   Yes / DoneYes / DoneYes / DoneYes / DoneProcessing, transparent Wating for on... FanControl  
UV lamp Hamamatsu Joao   Yes / DoneYes / DoneYes / DoneYes / DoneYes / Done Panel UVLampControl  
T11 CERN PS/T11 beam     Yes / DoneYes / DoneYes / DoneProcessing, transparentUnchecked checkbox Controlled locally in 2009 T11BeamControl  
Thermal Thermal control     Yes / DoneYes / DoneYes / DoneYes / DoneProcessing, transparent Waiting for on... ThermalControl  
Edit | Attach | Watch | Print version | History: r47 < r46 < r45 < r44 < r43 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r47 - 2009-11-22 - JoaoAlmeida
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Cloud All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback