Dream Testbeam November 2011
Shift schedule: November test beam period 31st October - 7th November
people at CERN
day |
31 Mo |
1 Tu |
2 Wed |
3 Thu |
4 Fri |
5 Sa |
6 Su |
7 Mo |
0-8 |
--- |
Daniele |
Sehwook |
Sehwook |
Michele |
Daniele |
Silvia |
Silvia |
--- |
Tommaso |
Gabri |
Gabri |
Laura |
Tommaso |
Tommaso |
Daniele |
8-16 |
John |
Richard |
Evelin |
Evelin |
Richard |
Richard |
Michele |
--- |
Gabri |
Marco |
Marco |
Daniele |
Sehwook |
Michele |
Sehwook |
--- |
16-24 |
Guido |
Antonio |
Fabrizio |
Fabrizio |
Silvia |
Laura |
Laura |
--- |
Antonio |
John |
Guido |
Tommaso |
Alessandro |
Alessandro |
Guido |
--- |
DAQ expert schedule: November test beam period 31st Oct - 7 Nov.
DAQ expert to be called in case of problem: on call shift are intended from 3pm first day in the header to 3pm second day in the header
31 - 1 |
1 - 2 |
2 - 3 |
3 - 4 |
4 - 5 |
5 - 6 |
6 - 7 |
Gabri |
Gabri |
Gabri |
Ale/Michele |
Ale/Michele |
Ale/Michele |
Ale/Michele |
Data Quality schedule: November test beam period 31st Oct - 7 Nov.
The date in the header column is the day of the 4pm meeting in which results should be shown.
1st |
2nd |
3rd |
4th |
5th |
6th |
7th |
Fabrizio |
Laura |
|
|
|
|
Measurement program: November test beam period 31st Oct - 7 Nov.
Fiber Module Program:
- Position at theta = 2, ADC readout
- Find coordinates tower module 80 GeV e
- Calibrate tower modules 80 GeV e
- Energy scan with electron
- 20, 30, 40, 60, 80, 100, 120, 150, 180 GeV
- 50 Kevt in the center (200 Kevt for 120, 150 GeV)
- 10 Kevt in each tower center (40 Kevt for 120, 150 GeV)
- Energy scan with pions
- 20, 40, 80, 120, 180
- 50 kept in the center
- Change the gain and redo electron measurement at 20 GeV
- ADC, DRS
- 50 Kevt in the center
- 10 Kevt in each tower center
Leakage Counters
See
neutron_counter_setup.pdf
PbWO matrix, DRS readout
- Calibrate xtal tower with 80 GeV electrons
- Energy Scan
- 20, 30, 40, 60, 80, 100, 120, 150, 180 GeV
- 50 Kevt in the center (200 Kevt for 120, 150 GeV)
- Change the gain and redo electron measurement at 20 GeV
QSTiles detector
Wobbling change (Friday PM)
- Energy scan with electron (Matrix, Fiber (ADC, DRS))
- 20, 15, 10, 6, (4) GeV
- 50 Kevt in the center
- 10 Kevt in each tower center
- Polarization Measurement on the xtals
HV Mappings
You can check here the HV mapping of
RO Mappings
You can find several readout configurations, depending from the testbeam perod:
Logbook
See
Nov_2011.pdf
2011 Online macros
- Newdream.C It will display the average shape for all 8 newdream towers (DRS readout) and print to the terminal the hight of the peak (baseline subtracted). Run it in root with .x Newdream.C ("5199")
- Newdream2.C It will display different towers for different runs. In order to see equalizations. Run with: .x Newdream2.C("5207", "5208", "5209", "5210")
- Leakages_DRS.C If you want to display the average pulse shape (read with the DRS from run 5269) of the 5 leakage counters that are surraunding newdream. Run with: .x Leakages_DRS.C("5291")
- Ancillary.C it plots PS, TC, T3 and muon detectors. Run with .x Ancillary.C("5291")
- PWO2.C displays the 7 towers of the PWO matrix as seen from the beam, both upstream that downstream. On the terinal you have values of the mean average hight (baseline subtracted). Run from root with .x PWO2.C("runnumber")
--
GabriellaGaudio - 02-Nov-2011
--
MicheleCascella - 12-Nov-2011