Shift schedule: November test beam period 31st October - 7th November

people at CERN

day 31 Mo 1 Tu 2 Wed 3 Thu 4 Fri 5 Sa 6 Su 7 Mo
0-8 --- Daniele Sehwook Sehwook Michele Daniele Silvia Silvia
--- Tommaso Gabri Gabri Laura Tommaso Tommaso Daniele
8-16 John Richard Evelin Evelin Richard Richard Michele ---
Gabri Marco Marco Daniele Sehwook Michele Sehwook ---
16-24 Guido Antonio Fabrizio Fabrizio Silvia Laura Laura ---
Antonio John Guido Tommaso Alessandro Alessandro Guido ---

DAQ expert schedule: November test beam period 31st Oct - 7 Nov.

DAQ expert to be called in case of problem: on call shift are intended from 3pm first day in the header to 3pm second day in the header

31 - 1 1 - 2 2 - 3 3 - 4 4 - 5 5 - 6 6 - 7
Gabri Gabri Gabri Ale/Michele Ale/Michele Ale/Michele Ale/Michele

Data Quality schedule: November test beam period 31st Oct - 7 Nov.

The date in the header column is the day of the 4pm meeting in which results should be shown.

1st 2nd 3rd 4th 5th 6th 7th
Fabrizio Laura        

Measurement program: November test beam period 31st Oct - 7 Nov.

Fiber Module Program:

  • Position at theta = 2, ADC readout
  • Find coordinates tower module 80 GeV e
  • Calibrate tower modules 80 GeV e
  • Energy scan with electron
    • 20, 30, 40, 60, 80, 100, 120, 150, 180 GeV
    • 50 Kevt in the center (200 Kevt for 120, 150 GeV)
    • 10 Kevt in each tower center (40 Kevt for 120, 150 GeV)
  • Energy scan with pions
    • 20, 40, 80, 120, 180
    • 50 kept in the center
  • Change the gain and redo electron measurement at 20 GeV
    • ADC, DRS
    • 50 Kevt in the center
    • 10 Kevt in each tower center

Leakage Counters

See neutron_counter_setup.pdf

PbWO matrix, DRS readout

  • Calibrate xtal tower with 80 GeV electrons
  • Energy Scan
    • 20, 30, 40, 60, 80, 100, 120, 150, 180 GeV
    • 50 Kevt in the center (200 Kevt for 120, 150 GeV)
  • Change the gain and redo electron measurement at 20 GeV
    • 50 Kevt in the center

QSTiles detector

Wobbling change (Friday PM)

  • Energy scan with electron (Matrix, Fiber (ADC, DRS))
    • 20, 15, 10, 6, (4) GeV
    • 50 Kevt in the center
    • 10 Kevt in each tower center
  • Polarization Measurement on the xtals

Readout schema

See ROmappingNovember2011

Logbook

See Nov_2011.pdf

-- GabriellaGaudio - 02-Nov-2011 -- MicheleCascella - 12-Nov-2011

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf Nov_2011.pdf r1 manage 23851.2 K 2011-11-15 - 17:57 MicheleCascella Test beam logbook
PDFpdf neutron_counter_setup.pdf r1 manage 165.2 K 2011-11-12 - 17:34 MicheleCascella  
Edit | Attach | Watch | Print version | History: r8 < r7 < r6 < r5 < r4 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r5 - 2012-07-10 - SilviaFranchino
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    DREAM All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback