Dream Testbeam December 2014
Shift schedule: December beam
Program
Dec 1 to Dec 3
Electromagnetic energy resolution as a function of rotation angle. Energy scan with Cu module. Low energy wobbling
Machine Development
Open the calorimeter box, remove PMTs of copper, remove with the crane the Cu modules, close the box, install on the top leakage counters
Dec 3 evening to the end
Tume structure of hadronic signal. DRS readout. Pb matrix plus leakage detectors. 180
GeV pions
Shift Summaries
Please at the end of the shift fill the report here :
Dec2014TBShiftSummary
Good Run List
Information on the run taken are reported here:
GoodRunListTBDecember2014
Detector informations
--