Dream Testbeam December 2015

Program

Al Cu module, Al C fibers, with one tower equipped with MCP readout S and C

  • module perpendicular to the beam, scan in X and theta angle, electron beams, DRS readout, 2 channels. Look at the reflected signal (time time distance, attenuation)
  • module parallel to the beam, theta 1 degree, pion beam 20 GeV. Time structure studies, DRS (with CET counters to select pions/protons)
Pb 3*3 matrix
  • Hadronic energy resolution, pion 180 GeV, 180, 125, 80, 40, 20, 10, 60. Calibration with electrons 20, 40 GeV

  • Proton/pions shower development. DRS readout, STILL TO BE DONE

Good Run List

Information on the run taken are reported here: GoodRunListTBDecember2015

Detector informations

Known problems

    • Dead channels: Tower 11 C (M3-C1) e 31C (M7-C1) 1S , leakage 1
    • Problems in data acquisition with rate > 1000 (trigger board starts to get crazy, not simple solution).
    • List of runs with DAQ errors..... TO BE DONE..

-- SilviaFranchino - 2015-11-01


This topic: DREAM > WebHome > DreamTBDecember2015
Topic revision: r4 - 2015-11-01 - SilviaFranchino
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback