Dream Testbeam December 2015
Program
Al Cu module, Al C fibers, with one tower equipped with MCP readout S and C
- module perpendicular to the beam, scan in X and theta angle, electron beams, DRS readout, 2 channels. Look at the reflected signal (time time distance, attenuation)
- module parallel to the beam, theta 1 degree, pion beam 20 GeV. Time structure studies (with CET counters to select pions/protons)
Pb 3*3 matrix
* Hadronic energy resolution, pion 180
GeV, 180, 125, 80, 40, 20, 10, 60. Calibration with electrons 20, 40
GeV
* DRS readout, proton, pion shower profile
Good Run List
Information on the run taken are reported here:
GoodRunListTBDecember2015
Detector informations
Known problems
-
- Dead channels: Tower 11 C (M3-C1) e 31C (M7-C1) 1S , leakage 1
- Problems in data acquisition with rate > 1000 (trigger board starts to get crazy, not simple solution).
--
SilviaFranchino - 2015-11-01