Dream Testbeam July 2012
Shift schedule: July beam period 16th - 30th July
people at CERN
DAQ expert schedule: July test beam period 16th - 30th July.
DAQ expert to be called in case of problem: on call shift are intended from 3pm first day in the header to 3pm second day in the header
Measurement program: July test beam period 16th - 30th July.
Crystal Program:
- Study of polarization measurements with PbF2 crystal (electron and photon beam)
- center the crystal position (acquisition with ADC)
- Results of PbF2 showed only a small effect, apparently due to scrambling of the light polarization along the long axis of the crystal -- see CrystalPolarizationStudies.
- Study of polarization measurements with BSO (BSO1) + U330+ GG495 filters and comparison with last year data. Acquisition with oscilloscope.
- scan with different thickness of lead absorber with electron
- change favorable/unfavorable filter
- scan with different thickness of lead absorber with photon
- change favorable/unfavorable filter
- Test amplifiler
- Energy scan to verify double gain measurements
Fiber Module Program:
wafeforms taken with parassitic muons with oscilloscope:
S signal:
https://atlserver.pv.infn.it/franchin/DREAM/2012/TEST_NOISE_AGO/TB_July/
C signal:
https://atlserver.pv.infn.it/franchin/DREAM/2012/TEST_NOISE_AGO/TB_July/
- Light Mixers. some results here:
Shift Summaries
Please at the end of the shift fill the report here :
JulyTBShiftSummary
HV Mappings
You can check here the HV mapping of
RO Mappings
You can find several readout configurations, depending from the testbeam perod:
Good Run List
Information on the run taken are reported here:
GoodRunListTBJuly2012
--
SilviaFranchino - 10-Jul-2012