Detector informations
--
GabriellaGaudio - 2018-09-07
* Detector with STAGGERED fibers tower and cabling scheme:
(drawing seen from behind the detector, looking upstream)
--
LorenzoPezzotti - 2018-09-08
Good Run List
List of runs with big calorimeter PMT (for calibration): 80
GeV secondary beam (pions + e-)
List of runs with big calorimeter PMT (for calibration): 20
GeV e-
List of runs with
SiPM module (x = 16,1 mm, y = 99,1 mm):
List of runs with Staggered module:
List of combined runs:
-- Main.
MassimilianoAntonello &
LorenzoPezzotti - 2018-09-11
-- Lorenzo Pezzotti - 2018-10-24
-- Lorenzo Pezzotti - 2018-10-24 - Logbook provided by Riccardo Farinelli