Dream Testbeam November 2012: Good Run List
Ntuples
Ntuples were automatically produced after completion of each run. They are stored on pcdream in
/mnt/dreamix2/ntuple
In order to analyze them, follow the readout mapping here:
ROmappingNovember2012
You can retrieve the data remotely using Globus Online, using either your own account or the dreamdaq one, using the pcdreamdaq endpoint. The data will also be stored at TTU along with data from previous test beams; Contact Sehwook or Alan if you need access.
Topics studied:
Lead module calibration:
- Steering 20 GeV electron (H8C.753) in each tower and set the HV to have peak at about 800 adc counts for the central towers and 2000 adc counts for the external rings. 10000 events per run. HV as in logbook page 40-41-42-46
- Calibration of T15 with 80GeV e+ (H8C.410)
- HV (S) = 580 V; HV (C) = 750 V; Run 9490 20 kevt
- Calibration of T15 and first ring with reduced HV; 100 GeV e+ (H8C.410); 5 kevt per run
Lead module pion data:
- Pion beam 60 GeV (H8C.753). Beam steered in T15; Neutron counters gate has been changed from 130 ns (leftside of the table) to 220 ns (leftside of the table) and delayed.
- Pion beam 60 GeV (H8C.753). Beam steered in T8. Run 9129 200 kevt.
- Pion beam 20 GeV (H8C.725). Beam steered in T15
- Pion beam 20 GeV (H8C.725). Beam steered in T8. Run 9268 120 kevt.
- Pion+ beam 180 GeV (H8C.405). Beam steered in T15. Zero angle.
- Pion+ beam 100 GeV (H8C.415). Beam steered in T15; HV(S) = 620 V, HV(C) = 900 V
Lead module electron data:
- Electron beam steered in T15. Energy scan. Nominal voltages as for calibration
- Electron beam steered in T15. Energy scan. Reduced HV: HV(S) = 580 V ; HV(C) = 750V
- Position scan (see logbook page 110) e+ beam 100 GeV (H8C.418); HV as for calibration with this beam file
Copper module calibration:
- Steering 20 GeV electron (H8C.753) in each tower and set the HV to have peak at about 600 adc counts for the scintillation and 200 adc counts for the Cherenkov. 10000 events per run
- Calibration of Al-Cu2 with 80GeV e+ (H8C.410)
- HV = 550 V; Run 9442 and 9443 10 kevt each
Copper module pion data:
- Pion+ beam 180 GeV (H8C.405). Beam steered in Cu(Al)2. Zero angle.
Copper module electron data:
Electron beam steered in Al-Cu2. Energy scan.
Electron shower profile study. 20
GeV electron beam
Leakage Counter Calibration data:
- 180 GeV pi+. Beam file H8C.405. zero angle. Calibration for counters L1-L12, see pg. 47 of logbook. Calibration for counters L13-L20 on pg. 77 and 78. Voltages for all Counters on pg. 69.
Crystal program:
PbWO4 and
PbF2 crystals
HV= 550 HV = 420
80
GeV e+ beam
H8C.410
10 kevt per run