Pole 2 Documentation Authors Area This area is used to hold work in progress / DRAFT copies of the Operational Documentation

Link to the current Common Sections as included by the current manuals

Operational Procedures (Draft)

The documents below describe proposed changes to the Operational Procedures. It is updated with all the new ideas and procedures and it is awaiting for approval.

When the document is approved the text is moved to the Operational Documentation area.

Operational Procedures for ROCs and Sites (Draft)

Operational Procedures for ROD (Draft)

Operational Procedures for C-COD (Draft)

Operational Procedures Common Sections (Draft) Broken links in RED PDG

OLD references to SAM tests

TODO area for the drafts

Obsolete links stored for reference only - Not Current

Operational Documentation Obsolete Area

-- PeteGronbech - 2009-09-02

Edit | Attach | Watch | Print version | History: r19 < r18 < r17 < r16 < r15 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r17 - 2010-04-09 - VeraHANSPERExternal
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    EGEE All webs login

This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright & by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Ask a support question or Send feedback