This main purpose of this action plan is to define the
actions the timelines and the responsible ROCs/people so that the EGEE
SLA/SLAs is defined by the end of the
year 2007. A first draft of the
SLA should be
ready by the end of summer, thus beginning of September.
The action plan should be finalized and discussed in the ROC
managers meeting on the 10
th of July.
The identified tasks for the preparation of the
SLD are:
T1. Define initial Table of Contents
T2. Define a basic set of Metrics
T3. Discuss with MIG about the feasibility of metrics
implementation and if the metric produced by MIG are consistent with the
SLD metrics.
T4. Decide on the existence of one or more SLDs
T5. Draft text for the contents of the
SLD.
T6. Iterate and discuss the contents of the
SLD.
T7. Prepare the first draft before by the end of summer.
T8. Produce some initial reports based in the SLD metrics
and the metrics produced by MIG to estimate the conformance of the
SLA by sites.
T9. Iterate and discuss the
SLD.
T10. Finalize draft.
In order to have a draft
SLD by the end of summer T1 to T6
should be done by end of August 2007.
Timeline:
T1: by 17
th of July
T2: by 24th of July
T3: by 24
th of July
T4: from 24
th of July to 6th
th of August
T5-T6: by 7
th of September
Note that August is a month that most of people are on
holidays for an extended period of time.
Code |
Description |
Start Date |
End Date |
Responsible |
T1 |
Define initial Table of Contents |
17 Jul 2007 |
T2 |
Define a basic set of Metrics |
24 July 2007 |
T3 |
Discuss with MIG about the feasibility of metrics implementation and if the metric produced by MIG are consistent with the SLD metrics |
24 July 2007 |
T4 |
Decide on the existence of one or more SLDs |
24 July 2007 |
06 Aug 2007 |
T5 |
Draft text for the contents of the SLD |
7 Aug 2007 |
T6 |
Iterate and discuss the contents of the SLD |
Aug 07 |
T7 |
Prepare the first draft before by the end of summer |
7 Sep 07 |
T8 |
Produce some initial reports based in the SLD metrics and the metrics produced by MIG to estimate the conformance of the SLD by sites |
Autumn 2007 |
T9 |
Iterate and discuss the SLD |
Autumn 2007 |
T10 |
Finalize draft |
Autumn 2007 |